Spelling suggestions: "subject:"managemement managemement"" "subject:"managemement managementment""
31 |
A research model for collaborative knowledge management practice, supply chain integration and performance /Li, Yulong. January 2007 (has links)
Dissertation (Ph.D.)--University of Toledo, 2007. / Typescript. "Submitted as partial fulfillment of the requirements for the Doctor of Philosophy degree in Manufacturing Management and Engineering." Bibliography: leaves 215-235.
|
32 |
Man's plans and the Lord's boards? Submitting the science of management to a higher plane /Drenth, Stanley Allen. January 1990 (has links)
Thesis (Th. M.)--Calvin Theological Seminary, 1990. / Abstract. Includes bibliographical references (leaves 153-159).
|
33 |
Building successful franchises : the influence of franchise heterogeneity and relationship management on franchise success /Inma, Chutarat. January 2002 (has links)
Thesis (Ph.D.)--Murdoch University, 2002. / Thesis submitted to the Division of Business, Information Technology and Law. Bibliography: p. 375-403.
|
34 |
The hotel management simulation/game : an evaluation of game mechanics and learning outcomes /Dominguez, Angel E. January 1993 (has links)
Thesis (M.S.)--Rochester Institute of Technology, 1993. / Typescript. Includes bibliographical references (leaves 80-86).
|
35 |
Building an operational data store for a direct marketing application system a thesis /Smith, Chad. Dekhtyar, Alexander. January 1900 (has links)
Thesis (M.S.)--California Polytechnic State University, 2009. / Title from PDF title page; viewed on Mar. 25, 2009. "March 2009." "In partial fulfillment of the requirements for the degree [of] Master of Science in Computer Science." "Presented to the faculty of California Polytechnic State University, San Luis Obispo." Major professor: Alexander Dekhtyar, Ph.D. Includes bibliographical references (p. 58-59). Also available on microfiche.
|
36 |
Information quality management capability maturity modelBaškarada, Saša. January 2009 (has links)
Thesis (PhD)--University of South Australia, 2008. / Description based on print version record. Includes bibliographical references: p. [237]-285.
|
37 |
Mobile knowledge /Fagrell, Henrik. January 1900 (has links)
"Doctoral dissertation"--Göteborgs universitet, 2000. / "October 2000." References.
|
38 |
Bewertung von Managementsystemen für Unternehmen und Projekte der Bauwirtschaft : Ableitung strategischer Handlungsfelder /Behrends, Jens. January 2005 (has links)
Zugl.: Wuppertal, Universiẗat, Diss., 2005.
|
39 |
Information quality management capability maturity modelBaškarada, Saša. Koronios, Andy. January 2009 (has links)
Dissertation--University of South Australia, 2008. / Includes bibliographical references (p. [237]-285).
|
40 |
Design-build interoperability and conceptual design and developmentMcClain, Lewis R. January 2007 (has links)
Thesis (M. S.)--Building Construction and Integrated Facility Management, Georgia Institute of Technology, 2007. / Uhlik, Felix, Committee Member ; Sadri, Saeid, Committee Chair.
|
Page generated in 0.1125 seconds