• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 246
  • 219
  • 1
  • 1
  • Tagged with
  • 467
  • 459
  • 459
  • 447
  • 314
  • 162
  • 162
  • 147
  • 147
  • 120
  • 96
  • 89
  • 15
  • 15
  • 14
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
111

Ikke-desktruktiv tilstandskontroll av kabelskjøter i distribusjonsnett / Non-destructive Condition Assessment of Medium Voltage Cable Systems

Hammervoll, Knut Dahle January 2010 (has links)
En stor andel av distribusjonsnettet verden over begynner å nå, eller allerede har passert, sin tekniske levetid. I Nord-Amerika er over 20 % av kabelanleggene i distribusjonsnettet (mellomspenningsnettet) eldre enn sin tekniske levetid [1]. Feilstatistikken øker i takt med alderen på anleggene, samtidig som nettselskapene står ovenfor strengere krav til leveringssikkerhet. Vanntrær er sett på som hovedårsaken til feil og havari på kabelanlegg i distribusjonsnettet. De senere årene har det i tillegg til havari som følge av vanntrær også blitt avdekket svært mange feil knyttet til kabelskjøter. Spesielt gjelder dette kabelskjøter fra kabelanlegg satt i drift tidlig på 1980 tallet. Aldringsmekanismene for kabelskjøter er i dag ikke helt fastlagte. Mye av tidligere forskningen har vært knyttet til varmgang i skjøtehylsen på grunn av høy kontaktmotstand. Arbeidet i dette prosjektet er basert på feltaldrede kabelskjøter. Kabelskjøtene er hentet fra kabelanlegg som under tidligere feltdiagnostisering viste svært lave resistansverdier (lavohmige) og høye dielektriske tap. Partielle utladninger ble målt, og lokalisert til kabelskjøter. På bakgrunn av disse resultatene er to trefaseskjøter tatt ut av drift og studert videre i laboratoriet. I tillegg er to havarerte kabelskjøter fra det samme nettområdet studert. I laboratoriet er skjøtene karakterisert ved blant annet megging (isolasjonsresistivitet), dielektrisk spektroskopi og måling av partielle utladninger. Resultatene fra dette prosjektet konkluderer med at kontaktmotstand kan ha vært årsak til havari for de to havarerte kabelskjøtene. For skjøtene studert i laboratoriet tyder mye på at vanninntregning i løpet av alle årene i drift alene kan føre til havari. Den ene av skjøtene ble utsatt for tørking ved høy temperatur. Tørkingen førte til at de partielle utladningene detektert før tørkingen, med tennspenning like over driftsspenning, forsvant. I tilegg ble isolasjonens ledningsevne og dielektriske tap drastisk redusert. En av skjøtene ble utsatt for aldring over en lengre periode påsatt konstant høyspenning. Skjøten sto spenningssatt i totalt åtte uker, og ble med jevne mellomrom testet for partielle utladninger. De studerte skjøtene viste et svært intermitterende utladningsbilde. Både størrelse og varigheten på utladningene varierte svært hurtig.
112

Utvikling av testoppsett for spenningsprøving av HVDC PEX-kabler : Innvirkning av HVDC med overlagrede transienter på levetiden / Development of a set-up for testing of HVDC XLPE cables : Influence of HVDC with Superimposed Transient on Cable Insulation Life Time

Nodeland, Petter Instefjord January 2010 (has links)
Målet med masteroppgaven er å bygge en allerede planlagt transformator, samt videreutvikle et påbegynt testoppsett. Det arbeidet som tidligere er gjort kan finnes i prosjektoppgaven [1] (denne ligger vedlagt i vedlegg 1). Testoppsettet skal brukes til å teste den planlagte likespenningen med en overlagret transient, samt en AC-kilde brukes for å teste kabelen slik at resultatene kan sammenlignes. Bakgrunnen for målet stammer fra prosjektoppgaven og lyder: ”ønske om å teste innvirkningen transiente spenninger har på kryssbundne polyetylen (PEX) kabler som opererer i et høyspent DC-system (HVDC). For å generere den ønskede spenningen på 100 kV ± 10 kVrms er det uarbeidet en krets. Det har vist seg at testoppsettet fungerer bra til gjennomslaget skjer. Gjennomslaget fører til at AC-kilden får for høy spenning, som resulterer i at IGBT-omformeren ødelegges. De testede spenningene gir et gjennomslag på 70 kV ± 7 kVrms ved bruk av en nåleavstand som gir en isolasjonstykkelse lik 0,9 mm. Tiden var i gjennomsnitt 3,5 min, noe som tilsvarer en gjennomslagsspenning lik 15 til 17 kV AC, med samme kabeloppsett.
113

Undersøkelse av hvordan vanninntrengning kan føre til havari av oljefylte kabeltermineringer / Investigation of Failure of Oil Filled Cable Terminations caused by Water Intrusion

Birkenes, Geir January 2010 (has links)
Denne masteroppgaven er en del av et prosjekt finansiert av Forskningsrådet, Statkraft, Statnett, Nortroll og SINTEF Energiforskning samt flere E-verk. Hovedmålet i prosjektet er å utvikle måleutstyr som kan detektere fuktighetsnivå, fritt vann og konduktivitet i oljefylte kabeltermineringer i felt. I den anledning er det interessant å skaffe mer kunnskap rundt hvilke fenomener som leder frem til havari. Det er flere hypoteser knyttet til hendelsesforløpet. Studier av havarerte termineringer viser at gjennomslagstedet ligger et stykke over konus. Ettersom det mest sannsynlige stedet for vanninntrengning er toppakningen antas at vannet glir ned langs kabelen og legger seg toppen av konus. Om vanndråper alene vil kunne gi en stor nok feltforsterkning til at havari kan forekomme er usikkert. For å skaffe mer kunnskap om hendelsesforløpet gjennomføres følgende forsøk: •Fullskalaforsøk av en vannlekkasje i en oljefylt kabelterminering. Målet med forsøket er visuelt å undersøke hvordan fritt vann i oljeisolasjonen vil bevege seg og etter hvert samle seg i termineringen. Underveis måles utladningsaktiviteten slik at den kan sammenlignes direkte med de observerte fenomener. • Modellforsøket der det studeres hvordan en jordet vannfilm som ligger rundt kabelisolasjonen nederst i oljen vil påvirkes(visuelle observasjoner og utladningsmålinger) av det elektriske feltet. Forsøket utføres både med målinger like etter at spenningen er slått på og også som et aldringsforsøk. Observasjoner gjort under fullskalaforsøket viser at dråpene har to karakteristiske bevegelsesmønstre. I tilfelle der dråpene har en viss avstand til andre dråper trekkes de inn mot konusområdet etter hvert som de synker nedover i oljen. Dersom to eller flere dråper kommer i nært nok slås det enten sammen eller støttes bort fra hverandre. Dråpene løser seg i liten grad i oljen, men fester seg på konus og veggene i termineringshuset. Utladningsmålinger gjort under forsøket viste lite utladningsaktivitet de første 1400 timene selv om to liter vann ble dryppet inn i denne perioden. Fra 1400-2000 timer etter oppstart var utladningsnivået i området 50 pC-1nC. Utladningene ble lokalisert til neddel/ nedsiden av konus. Sammen med observasjoner kan dette tyde på at vanndråpene har flyttet potensialet nedover konus ved å danne elektriske kontakt med oversiden. Langtidsforsøk på modellkabler viste stor statistisk spredning på når havari inntreffer. Utladningsnivået ved relevante feltstyrker var også begrenset.
114

Dynamisk interaksjon mellom vindkraftparker og tradisjonelle produksjonskilder under større forstyrrelser i kraftsystemet. / Dynamic Interaction Between Wind Power Plants and Traditional Production Units During Major Disturbances in the Power System.

Eliassen, Odin Hammer January 2010 (has links)
Denne rapporten omhandler dynamiske analyser av et vannkraftverks respons på kortslutninger i nærliggende transmisjonslinjer og større endringer i nettopologi. Hovedfokuset i analysene har vært å studere hvordan vannkraftverkets respons på forstyrrelsene endres når en vindmøllepark kobles inn i nettet. Hovedformålet har vært å tilegne seg kunnskap om kraftsystemsimuleringer og interaksjonen mellom generatorer. De sentrale delene i denne oppgaven er: •Teori om de vanligste vindturbintypene og stabilitetsteori. •Etablering av dynamisk vindturbinmodell •Dynamiske analyser av generatorresponser under endinger i systemet med forskjellige vindparker og lastflytløsninger. •Vurdering av hvordan integrasjon av vindturbiner kan påvirke kraftsystemets transiente polhjul- og spenningsstabilitet. DFIG- vindturbiner forbedrer spenningsstabiliteten i nettet ved å bidra med reaktiv støtte. Samtidig fører aktiv spenningsregulering fra DFIG- vindturbinene til større spenningsvariasjoner i vindparkens tilknytningspunkt. Integrasjon av vindparken fører til endret lastflyt i nettet. Denne lastflytforandringen endrer vannkraftverkets transiente respons på forstyrrelser i systemet. Innkobling av vindparken fører til tettere elektrisk kobling mellom vannkraftverket og atomkraftverket på samleskinne 151. Den elektriske koblingen mellom vannkraftverket og de resterende kraftverkene i systemet blir svakere når vindparken integreres. Dette fører til at verdien på vannkraftgeneratorens polhjulsvinkel i det transiente svingeforløpet øker. Integrasjon av vindkraft øker den roterende massen i kraftsystemet. Dette kan føre til reduserte frekvensendringer ved forstyrrelser dersom ikke andre enheter kobles ut i den aktuelle driftssituasjonen. Vindkraftverket kan ikke øke energiproduksjonen ved produksjonsunderskudd. Integrasjon av vindkraft fører til avbelastning av andre kraftverk, som dermed får økt roterende reserve. På denne måten bidrar vindkraftverket indirekte til økt roterende reserve i kraftsystemet.
115

Superconducting magnetic energy storage in power systems with renewable energy sources

Nielsen, Knut Erik January 2010 (has links)
The increasing focus on large scale integration of new renewable energy sources like wind power and wave power introduces the need for energy storage. Superconducting Magnetic Energy Storage (SMES) is a promising alternative for active power compensation. Having high efficiency, very fast response time and high power capability it is ideal for levelling fast fluctuations. This thesis investigates the feasibility of a current source converter as a power conditioning system for SMES applications. The current source converter is compared with the voltage source converter solution from the project thesis. A control system is developed for the converter. The modulation technique is also investigated. The SMES is connected in shunt with an induction generator, and is facing a stiff network. The objective of the SMES is to compensate for power fluctuations from the induction generator due to variations in wind speed. The converter is controlled by a PI-regulator and a current compensation technique deduced from abc-theory. Simulations on the system are carried out using the software PSIM. The simulations have proved that the SMES works as both an active and reactive power compensator and smoothes power delivery to the grid. The converter does however not seem like an optimum solution at the moment. High harmonic distortion of the output currents is the main reason for this. However this system might be interesting for low power applications like wave power. I
116

Modulation Methods for Neutral-Point-Clamped Three-Level Inverter

Floten, Sveinung, Haug, Tor Stian January 2010 (has links)
Multilevel converters have seen an increasing popularity in the last years for medium- and high-voltage applications. The most popular has been the three-level neutral clamped converter and still research is going on to improve the control of it. This master thesis was a continuation of the specialization project fall 2009. The main topics of current thesis were to further investigate the DC-bus balancing issues, compare symmetrical (one sampling per triangular wave) and asymmetrical (sampling at the top and bottom of the triangular wave) modulation, derive current equations for Space Vector and Double-Signal, improve output voltage in overmodulation and be able to DC-bus balance, and to implement the methods in the laboratory. Models of the three-level converter were made in the specialization project in both PSCAD and SIMULINK and further studies of the DC-bus balance were also made in this master thesis. None of the methods showed problems to regulate the DC-bus voltage when there was different capacitor values and unsymmetrical load. A PI controller was introduced for Space Vector but it did not show better performance than a regular P regulator. Asymmetrical modulation showed a clearly better performance than symmetrical modulation when the switching frequency was low compared to the fundamental frequency, especially for Space Vector. The 1st harmonic line-to-line voltage was closer to the wanted value and the THDi was significantly lower. Simulations also showed that the THDi can vary significantly depending on at which angle the first sampling is done. This is most clear for asymmetrical Space Vector modulation, but also for the other cases this pattern occurs. By implementing an overmodulation algorithm the amplitude of the 1st harmonic output voltage was closer to what was desired. Simulations showed how important it was to have three phase sampling symmetry in overmodulation. By having a wrong switching frequency the line-to-line output voltage dropped down to 2.06 when operating in six-step, when the wanted output value should be 2.205. Hence there is a quite large mismatch and the converter is sensitive to the switching frequency when it is operating in the higher modulation area. The balancing algorithm introduced for overmodulation is able to remove an initial offset without a notable change the 1st harmonic output. Both Space Vector and Double-Signal were tested in the laboratory with two separated DC-sources. Asymmetrical and Symmetrical modulation were tested and so was also overmodulation. The laboratory results confirmed the simulated results, but since the switching was not synchronized in the laboratory, some errors occurred.
117

Degradering av flourpolymerer ved hjelp av partielle utladninger / Degradation of Fluorpolymers by Partial Discharges

Sæthre, Øystein January 2010 (has links)
Prosjektet har blitt utført i samarbeid med SINTEF Energi AS. Hovedformålet med prosjektet har vært å sammenligne kryssbundet polyetylen (PEX) med perfluoroalkoxy (PFA) med hensyn på levetid i elektrisk sammenheng. I dag er PEX det mest brukte isolasjons materiale, men dette isolasjons materiale er ikke veldig motstandsdyktig mot partielle utladninger. Det er derfor ønskelig og finne et materiale som er mer motstandsdyktig mot partielle utladninger og derfor kan være et alternativ til PEX som isolasjonsmateriale i applikasjoner med høye temperaturer og trykk. Forsøkene har blitt gjort ved konstant trykk (4 bar absolutt, N2), ved 25 ˚C eller 30 ˚C og konstant avstand fra elektrode til prøveobjekt (1 mm). Spenningen under testing har vært 16769 volt eller 18000 volt. Data som har blitt målt og logget under testing av prøveobjektene er PD, antall PD, trykk og temperatur. Prøvedata har blitt undersøk, for å påvise et mønster som kan forteller om levetid. Det har blitt sett på levetid for isolasjonen som funksjon av spenning, energi og motstand på belegg mellom prøveobjekt og jordingselektrode. Det kommer ikke frem noen signifikante forkjeller mellom PEX og PFA. Det er derfor ikke mulig og si noe om hvordan PFA er som isolasjon i forhold til PEX.
118

HVDC-kabelisolasjon for neste generasjons transmisjonsnett / HVDC Cable Insulation for next Generation Transmission Networks

Engebrethsen, Marius January 2010 (has links)
HVDC-kabler har lenge vært viktige innen energiinfrastrukturen ettersom de kan transportere store mengder energi over store avstander med langt mindre tap enn AC-kabler. HVDC-kabler har tradisjonelt hatt et masseimpregnert isolasjonssystem, men ekstruderte polymerer er i ferd med å bli et alternativ. Borealis har utviklet en polymer ved navn LE4253 som Nexans har planer om å ta i bruk som HVDC-kabelisolasjon. Hovedformålet med denne oppgaven er å karakterisere spenningsfordeling og spenningsholdfasthet for LE4253 ved hjelp av henholdsvis romladningsmålinger og holdfasthetstest for så å sammenlikne med et kjent referansemateriale, LS4201S. AC-holdfasthetstestene viste en gjennomsnittlig spenningsholdfasthet for HVDC-solasjonen på 88,7kV/mm og en P63,2% på 92,83kV/mm. Referansematerialet lå noe lavere med en gjennomsnittlig spenningsholdfasthet på 73,7kV/mm og en P63,2% på 81,16kV/mm. Holdfasthetstesten viser også at det er mulig ved optimale produksjonsforhold å få en holdfasthet på over 100 kV/mm. Konduktiviteten i både LE4253 og LS4201 viste seg å være avhengig av påtrykt feltstyrke og temperatur. Sammenhengen ble funnet å være: sigma(LE4253) = 6E-18∙e^(0,1158T+0,1236E) sigma(LS4201S) = 4E-18∙e^(0,2133T+0,1200E) Akkumulasjon av romladning er kritisk i HVDC-kabler med isolasjonssystem av ekstruderte polymerer. Dette skyldes at hurtig endring av det elektriske feltet, som for eksempel ved polaritetsskift eller hurtig jording, vil føre til lokale feltforsterkninger i områdene med romladning. Dette vil igjen kunne initiere trevekst og igjen til havari. Etter å ha stått spenningssatt i åtte døgn var det omtrent like mye romladning i LE4253 som i LS4201S. Den store forskjellen lå i at romladningene var mer distribuert i LE4253 i forhold til LE4201S hvor det meste av romladning akkumulertes i elektrodegrenseflaten. Ladningsansamlingen i LE4253 og LS4201S ved den positive elektroden etter åtte døgns spenningspåtrykk på 20 kV/mm lå stabilt de tre siste døgnene på henholdsvis -0,48 kV/m3 og -1,04 kV/m3. Ladningsansamlingen i LE4253 og LS4201S ved den negative elektroden etter åtte døgns spenningspåtrykk på 20 kV/mm var henholdsvis -0,16 kV/m3 og -0,74 kV/m3.
119

Analyse av ingeniørgeologiske problemstillinger for Vågsbygdporten / Analysis of engineering geological factors for the Vågsbygd road tunnel

Fjæran, Jørgen January 2012 (has links)
SammendragVågsbygdporten er en 1,3 km lang vegtunnel bestående av to hovedløp og tre ramper som tilsammen utgjør 3,3 km. Tunnelen bygges som del av prosjektet Fylkesveg 456 ny Vågsbygdvei iKristiansand kommune. Byggingen av tunnelen startet høsten 2010, og den forventes å væreferdigstilt i 2014. I oppgaven er det utført ingeniørgeologisk vurdering og analyse knyttet tilsammenheng mellom forhold i tunnel og forundersøkelser, bruk og nytteverdi avborparametertolkning (MWD) samt sikringsomfang i kryssområde.Med grunnlag i utførte forundersøkelser og ingeniørgeologisk tolkning er det gjort en sammenligningmed de kartlagte forholdene i tunnelen. Overensstemmelsen over 53 % av tunnellengden er god,mens den kun for 3 % av lengden er dårlig. Årsaken til de 3 % med dårlig overensstemmelse er sværtmye lavere fjellkvalitet enn antatt, og feiltolkning av svakhetssone i kryssområde mellomhovedtunneler og rampetunnel. Kartlagt bergklasse i tunnelen er jevnt over dårligere enn dentolkede.Omfanget av gjennomførte forundersøkelser har vært svært lik anbefalingen for vegtunneler isamme klasse, og kostnadene har kun vært 0,5 % lavere enn anbefalt. Derfor er omfanget vurdert tilå være tilstrekkelig for å oppnå en god ingeniørgeologisk oversikt før byggestart. Når det gjelderundersøkelser utført under driving er kostnadene av disse en del høyere enn tunneler som har værttilgjengelige for å sammenligne direkte med, men disse er til gjengjeld ti år gamle eller eldre.Analyse av MWD-tolkninger fra salvehull på prosjektet har vist at det er god overensstemmelsemellom disse og kartlegginger på stuff. Hele 72 % av tunnellengden er vurdert til å ha en god ellermeget god sammenheng. Et forsøk på å finne entydig sammenheng mellom tolkningen og Q-verdierhar gitt gode resultater. Nytteverdien av et slikt system på prosjektet har derimot vist seg å væresvært liten under driving. Dette skyldes i hovedsak lite bruk, en uvanlig løsning for geologiskoppfølging og kartlegging i tunnelen og jevnt over korte hullengder som gir liten mulighet for tolkninglengre frem enn en salvelengde. Systemet har likevel et stort potensial om forholdene leggesskikkelig til rette.I et krysningspunkt mellom hovedtunneler og rampetunnel er det gjort full utstøpning over en lengdepå til sammen 54 m. I dette området er det utført en empirisk analyse ved hjelp av Q-metoden, derkartlagte Q-verdier er justert systematisk for å havne i en sikringskategori tilfredsstillende nær utførtsikring. Resultatet fra analysen viser at en justering av SRF til mellom 12,5 og 25 i tillegg til en dobling av Jn gir det mest brukbare resultatet for justering av Q-verdi i et slikt område. Det er nødvendig å gjøre lignende analyser i andre tunnelprosjekter for å kunne bestemme om dette er en god eller dårlig tilnærming.
120

Engineering geological assessment and structural comparison of the Vollan and Ivasnasen rock slopes at Sunndal, Norway

Dreiås, Gudrun Majala January 2012 (has links)
This master thesis has interest in analyzing the two unstable rock slopes Ivasnasen and Vollan. These rock slopes are located in a U-shaped valley in Sunndal municipally (Møre & Romsdal, western Norway). The analyses are based on a combined approach using detailed geomorphic, structural and geological field mapping. This along with interpretation of high-resolution digital elevation models (DEM) and orthophotos, LIDAR-scans from one of the sites (Ivasnasen 2010 and 2011), numerical analysis, kinematic analysis, XRD analysis and laboratory testing. The two sites, Ivasnasen and Vollan are both unstable. Ivasnasen is classified with a historical rockslide and an unstable rock slope, this because a remaining unstable part is detected in the elongation of the back scarp for the historical rockslide. For Vollan an earlier event is still active. It is important to analyze both sides of the valley to get a best knowledge of the possible consequences and the history. The software Ante-Rockslide Topography (ART) is used to reconstruct and construct the topography for Ivasnasen. Detailed volume estimation is used further in the software Slope Local Base Level (SLBL) and a manual ART reconstruction in the PolyWork (software). The calculated volume estimates for the historical rockslide at Ivasnasen range from 5.2Mm3 -1.2Mm3 and from 0.6-2.1Mm3 for the unstable rock slope. The software Phase2 has been used for the numerical modeling. The reconstructed and constructed topography for Ivasnasen have been used for a detailed study of the parameters and trigger factors that affected the slope stability in Phase2.The back scarp at Vollan contains quartzite and the back scarp at Ivasnasen contains augen gneiss. The main failure mechanism is toppling at Vollan and planar sliding at Ivasnasen. The study of Vollan and Ivasnasen provides useful findings for the understanding of potential present rock slope instabilities.It has been concluded that it have been two different events at Ivasnasen, based on analyses that discovered two different back scarps. Due to the numerical modeling in Phase2 the main triggers at Ivasnasen is the groundwater table and most likely a progressive accumulation of rock weakening, where it also include rich biotite layers. A growing tension was build up in the cracks and the slope failed.For Vollan the analysis concludes that it is a really “slow movement” process acting. Due to the analyses that have been done until now shows that it cannot be characterized as significant movements. For this site it is important to do further investigations over a longer period to have a more determined conclusion. The analyses that have been done in this thesis can be used as good inputs to further investigations.

Page generated in 0.0199 seconds