• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1519
  • 38
  • 27
  • 20
  • 20
  • 19
  • 15
  • 14
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 1596
  • 825
  • 659
  • 403
  • 259
  • 220
  • 182
  • 162
  • 141
  • 138
  • 137
  • 135
  • 126
  • 124
  • 121
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
151

Integrating data mining into contextual goal modeling to tackle context uncertaintiesat design time

Farias, Arthur José Rodrigues 24 November 2017 (has links)
Dissertação (mestrado)—Universidade de Brasília, Instituto de Ciências Exatas, Departamento de Ciência da Computação, 2017. / Submitted by Raquel Almeida (raquel.df13@gmail.com) on 2018-04-10T19:57:59Z No. of bitstreams: 1 2017_ArthurJoséRodriguesFarias.pdf: 1641526 bytes, checksum: 2e82f2f022d3f87b6463903dccc2d8da (MD5) / Approved for entry into archive by Raquel Viana (raquelviana@bce.unb.br) on 2018-04-11T18:23:36Z (GMT) No. of bitstreams: 1 2017_ArthurJoséRodriguesFarias.pdf: 1641526 bytes, checksum: 2e82f2f022d3f87b6463903dccc2d8da (MD5) / Made available in DSpace on 2018-04-11T18:23:36Z (GMT). No. of bitstreams: 1 2017_ArthurJoséRodriguesFarias.pdf: 1641526 bytes, checksum: 2e82f2f022d3f87b6463903dccc2d8da (MD5) Previous issue date: 2018-04-11 / Understanding and predicting all context conditions the self-adaptive systems will be exposed to during its life time and implementing a ppropriate adaptation techniques is avery challenging mission. If thesys tem cannot recognize and adapt to unexpected contexts, this can be the cause of failures in self-adaptive systems, with possible implications of not being able to fulfill user requirements or even resulting in undesired behaviors. Especially for dependability attributes, this would have fatal implications. The earlier the broad range of high level context conditions can be specified, the better adaptation strategies can be implemented and validated into the self adaptive systems. The objective of this work is to provide (automated) support to unveil context sets at early stages of the software development life cycle and verify how the contexts impact the system’s dependability attributes. This task will increase the amount of potential issues identified that might thre atenthedependability of self-adaptivesystems. This work provide san approach for the automated detection and analysis of context conditions and their correlations at design time. Our approach employs a data mining process to suitably elicit context sets and is relying on the constructs of a contextual goal model (CGM) for the mapping of contexts to the system’s behavior from a design perspective. We experimentally evaluated our proposal on a Body Sensor Network system(BSN), by simulating amyriadofresourcesthatcouldleadtoa variability space of 4096 possible context conditions. Our results show that our approach is able to elicit contexts that would significantly affect a high percentage of BSN assisted patients with high health risk profile inful filling their goals with in the required reliability level. Additionally, we explored the scalability of the mining process in the BSN context, showing it is able to perform under a minute even for simulated data at the size of over five orders of magnitude. This research supports the development of self-adaptive systems by anticipating at design time contexts that might restrain the achievability of system goals by means of a sound and efficient data mining process.
152

Verificação da aplicabilidade do programa MAFMO como ferramenta auxiliar na estimativa de custos em projetos conceituais

Carriconde, Milton Correa January 2010 (has links)
Os empreendimentos em mineração são frequentemente classificados como de elevado fator de risco econômico por associarem características de investimentos elevados, com longo tempo de preparação e com certo grau de incertezas no que se refere a reservas geológicas ou caracterização tecnológica do minério. Portanto, é imperativo que a continuidade de um projeto, desde a prospecção geológica, seja acompanhada por frequentes reavaliações técnicas e econômicas, de forma que, a decisão de prosseguir seja respaldada pela aferição da viabilidade do empreendimento à luz das novas informações agregadas ao longo de seu desenvolvimento. As avaliações efetuadas nas etapas preliminares são, em geral, estimativas grosseiras, pois as informações disponíveis sobre a jazida e o minério estão incompletas e somente serão intensificadas se houver intenção de prosseguir no projeto, mas essa decisão deverá ser tomada com base nas avaliações econômicas preliminares. Alguns modelos de cálculo estimativo de custos de implantação e operação de instalações mineiras e de beneficiamento de minério foram desenvolvidos para auxiliar o profissional de engenharia de minas nessa tarefa. Alguns deles estão disponíveis em aplicativos para computadores. Este trabalho avalia a aplicabilidade do programa MAFMO – Modele d’Analyse Financière sur Micro-Ordenateur, desenvolvido no Centre de Géotechnique et d’Exploitation du Sous-sol da Ecole National Superieure dês Mines de Paris, que utiliza modelos matemáticos desenvolvidos por T. Alan O’Hara em 1980, para determinação de parâmetros econômicos adequados para proceder a avaliação econômica de um empreendimento mineiro. O estudo é desenvolvido para comparação dos resultados de avaliação do MAFMO, em três exemplos de jazida reais, com os valores de investimentos e custos operacionais calculados a partir de Projetos Conceituais, para lavra a céu aberto. / Mining ventures are, frequently, qualified as an activity with elevated economical risk factor joining characteristics of high investment, long preparation time and a substantial amount of uncertainty about geological reserves and technological characteristics of ore. Therefore, it is paramount for the continuity of a mining project, starting from the geological prospection, to be followed closely by technical and economical revaluations so that the decision to proceed or to stop, anytime, can be supported, or reviewed by every new datum added. Preliminary evaluations are, usually, an exercise of forecasting. The available information about the ore body shape or the ore qualities are quite incomplete at the beginning and will be detailed as long as the project proceeds based on favorable economical prognostic. There are some mathematical models that can help the mining engineer on that task of estimating investment and operational costs on mine and mineral process plant. Some of those models are available as computer software. This work evaluates the application of the software MAFMO - Modele d’Analyse Financière sur Micro-Ordenateur, developed by Centre de Géotechnique et d’Exploitation du Sous-sol da Ecole National Superieure dês Mines de Paris, which utilizes a cost estimation model, prepared by T. Alan O’Hara in 1980, to estimate suitable parameters such as capital investments and operating costs for a mine and processing plant. This study compares the results given by MAFMO software applied on actual ore bodies, with values attained from three different conceptual projects developed for preliminary feasibility studies for open pit mining exploitation.
153

Redução da variabilidade da qualidade do carvão entre pilhas de homogeneização utilizando simulação geoestatística

Beretta, Filipe Schmitz January 2010 (has links)
As pilhas de homogeneização são uma das formas mais comuns de homogeneização e redução da variabilidade de minério que alimenta uma unidade de processamento mineral ou o mercado diretamente. Uma das maneiras de construir essas pilhas consiste em dispor o material vindo da lavra em camadas horizontais e, posteriormente, retomá‐los em fatias verticais. A caracterização deste material vindo da mina (blocos de lavra) é uma das principais tarefas do planejamento mineiro. Existem várias técnicas que podem ser utilizadas para estimativa dos teores destes blocos, tais como Krigagem e Inverso da Distância (ID). A simulação por Bandas Rotativas é mais uma delas e foi utilizada neste trabalho, pois é capaz de reproduzir a variabilidade in situ e a continuidade espacial dos dados, ao contrário de outros métodos de estimativa. Com os resultados destas simulações são traçadas as possíveis rotas de lavra, que otimizam os diversos fatores de engenharia e economia. A rota de lavra é de difícil modificação e determinará a seqüência dos blocos que irão construir as pilhas de homogeneização. As pilhas são caracterizadas pela forma, tamanho, arranjo e número de camadas. O incorreto dimensionamento pode acarretar perdas financeiras devido ao alto estoque e/ou a perdas em recuperação e teores na usina de beneficiamento. O método proposto é capaz de quantificar a variabilidade dos sistemas de homogeneização para os n cenários de lavra conforme modelos de blocos simulados. Para tal metodologia foi desenvolvida uma rotina capaz de realizar diferentes tamanhos de pilhas para as várias simulações. Os dados utilizados são provenientes dos depósitos de carvão da região Sul do Brasil. Os parâmetros utilizados para a medida da variabilidade foram conteúdo de cinza e teor de enxofre, contaminantes comuns nestes depósitos. A metodologia proposta indica que é possível reduzir a variabilidade do sistema. A incerteza associada às variáveis foi reduzida, um tamanho conveniente de pilhas foi determinado e testes foram realizados para reduzir ainda mais os riscos econômicos da mineradora. / Mixing piles are one of the most common strategies of homogenization and ore variability reduction for mineral processing plant feeding or direct market feeding. One of the ways to construct these piles is to dispose the mined material in horizontal layers and, posteriorly, take them into vertical slices. The characterization of this material from the mine (mining blocks) is one of the main tasks of the mine planning. There are several techniques that can be used to estimate the grades of these blocks, such as Kriging and Inverse of Distance (ID). Turning bands simulation is one of them, and it was used on this study, because it is able to generate n possible values for the grades of the mining blocks. With these simulations results the possibilities for mining routes, those optimize the several mining and economic factors. The mining route is hard to modify and it will determine the block sequence that will build the homogenization piles. The piles are characterized by their shape, size, arrangement and the number of layers. An incorrect design can lead to financial losses due to high stock mass and/or to loss in processing plant recovery and grades. The proposed method is able to quantify the variability of mixing systems for n mining settings from simulated mining blocks. For this methodology was developed a routine able to realize different pile sizes for several simulations. The data used come from coal deposits in southern Brazil. The parameters used for the variability measure were ash content and sulfur grade, common contaminants in these deposits. The proposed methodology indicates that is possible to reduce the system variability. The uncertainty associated to the variables was reduced, a proper pile size was determined and tests were made, resulting in lower economic risks for the mining company.
154

Erosão em entressulcos e qualidade física de solos construídos após mineração de carvão / Interrill erosion and physical quality of constructed soils after coal mining

Franco, Ândrea Machado Pereira January 2010 (has links)
A lavra do carvão aliado a recomposição topográfica do terreno causam alterações na estrutura dos solos construídos, afetando a qualidade física e tornando os solos mais suscetíveis aos processos de erosão hídrica. O efeito e a magnitude desses processos são dependentes do tipo de solo. Neste contexto, este trabalho teve os seguintes objetivos: a) avaliar as características hidráulicas do escoamento, quantificar as taxas de desagregação (Di) e determinar a erodibilidade do solo em entressulcos (Ki) sob chuva simulada em laboratório para solos construídos há 12 anos e há 5 anos (SC 12 e SC 5) da área de mineração de carvão de Candiota-RS e comparar com o solo original da área de mineração; b) identificar os limites críticos de densidade do solo (Ds) em que a resistência mecânica à penetração (Rp), a porosidade de aeração (PA) e a água disponível são limitantes para o desenvolvimento das plantas através da metodologia do Intervalo Hídrico Ótimo (IHO). A determinação do fator Ki e das variáveis hidráulicas do escoamento foram realizadas em laboratório em parcelas experimentais de 0,59 m x 0,59 m, 09 m m-1 de declividade sob chuva simulada de intensidade de 85 mm h-1, aplicada durante 90 minutos. O fator Ki também foi estimado utilizando modelos analíticos de determinação indireta. O IHO foi determinado pela obtenção da resistência à penetração, umidade volumétrica e densidade do solo em amostras com estrutura preservada. Os resultados mostraram que o SC 12 apresentou melhores condições estruturais em relação ao SC 5 devido ao tempo de construção. Os solos construídos são constituídos de maciços de fragmentos de blocos compactados chamados de agregados não edáficos ou agregados não pedogênicos, os quais são mais resistentes que os agregados de origem pedogenética. Nos solos construídos, os valores de Di e Ki determinados em laboratório foram significativamente menores que no solo original devido à formação e composição dos agregados não pedogênicos desses solos. Dos modelos de determinação indireta testados, o modelo que melhor estimou o Ki para o solo original e SC 12 foi o que utiliza o teor de argila e de óxido de ferro; O modelo que melhor estimou o valor de Ki para o SC 5 foi o que utiliza o diâmetro médio ponderado em água (DMPA), pH e o parâmetro de Wischmeier (M). O SC 12 foi o que apresentou maior IHO, mesmo apresentando Ds maior que a densidade crítica, concordando com a melhor estrutura do solo e também menores valores de Di e fator Ki. A qualidade física do solo avaliada pela erodibilidade em entressulcos (Ki) e pelo IHO deve ser comparada somente entre solos de mesma natureza. / The extraction of the coal and the landscape resetting causes alterations in the structure of constructed soils, affecting the physical quality and becoming them more susceptible to the water erosion processes. The effect and the magnitude of these processes may be dependent on soil properties. In this context, this study had the following objectives: a) To evaluate the flow hydraulic characteristics, to determine detachment rate (Di) and the interrill soil erodibility factor (Ki) under simulated rainfall at laboratory conditions for constructed soil have 12 years and have 5 years (SC 12 and SC 5) of Candiota coal mine, RS, Brazil and to compare with the original soil of the mining area; b) to identify the critical limits of bulk density, where the soil resistance to penetration (Rp), porosity of aeration and available water are limiting for the development of the plants through the methodology of Least Limiting Water Range (LLWR). The determination of Ki factor and flow hydraulic characteristics had been done at laboratory with application of simulated rainfalls of 85 mm h-1 intensity during 90 minutes on bare soil at interrill unit plot of 0.59 x 0.59 m settled on 0.09 m m-1 slope. The Ki factor also was determined using analytical models of indirect determination. The LLWR was determined through the soil resistance to penetration, volumetric water content and bulk density in samples with preserved structure. The results showed that the SC 12 presented better structural conditions in relation to SC 5, due to the construction time. The constructed soils are constituted of structural units, also called not edaphics aggregates or not pedogenics aggregates, which are massive and more compacted and resistant that the pedogenetics aggregates. The values of Di and Ki determined in laboratory for the constructed soils were significantly lower than at the original soil, due the formation and composition of not pedogenics units of these soils. Among the tested indirect models determination, the one that better estimate the Ki factor for the original soil and SC 12 it was that uses the clay and Fe oxides contents. The model that better estimate the factor Ki for SC 5 was the one that use the mean weight diameter (MWD), pH and the “M” Wischmeier parameter. The SC 12 presented greater LLWR, even though, presenting bulk density greater than critical bulk density. This agrees with the better soil structure and lower values of Di and factor Ki. The use of Ki factor and LLWR to evaluate physical quality must be done only to compare soils of same nature.
155

Data Mining no Varejo: estudo de caso para loja de materiais de construção

Schaeffer, André Gustavo January 2003 (has links)
Este trabalho apresenta um estudo de caso de mineração de dados no varejo. O negócio em questão é a comercialização de móveis e materiais de construção. A mineração foi realizada sobre informações geradas das transações de vendas por um período de 8 meses. Informações cadastrais de clientes também foram usadas e cruzadas com informações de venda, visando obter resultados que possam ser convertidos em ações que, por conseqüência, gerem lucro para a empresa. Toda a modelagem, preparação e transformação dos dados, foi feita visando facilitar a aplicação das técnicas de mineração que as ferramentas de mineração de dados proporcionam para a descoberta de conhecimento. O processo foi detalhado para uma melhor compreensão dos resultados obtidos. A metodologia CRISP usada no trabalho também é discutida, levando-se em conta as dificuldades e facilidades que se apresentaram durante as fases do processo de obtenção dos resultados. Também são analisados os pontos positivos e negativos das ferramentas de mineração utilizadas, o IBM Intelligent Miner e o WEKA - Waikato Environment for Knowledge Analysis, bem como de todos os outros softwares necessários para a realização do trabalho. Ao final, os resultados obtidos são apresentados e discutidos, sendo também apresentada a opinião dos proprietários da empresa sobre tais resultados e qual valor cada um deles poderá agregar ao negócio.
156

Estudo de danos em pilares de carvão provocados pelo desmonte com explosivo

Pérez Hidalgo, Kelvis del Carmen January 2004 (has links)
O dimensionamento de pilares em minas de carvão é fortemente influenciado pelas condições geomecânicas do depósito mineral e pelo método de lavra utilizado. No desmonte de rochas com utilização de explosivos, os danos provocados podem ser significativos e influenciar diretamente no dimensionamento e segurança dos pilares. Essa dissertação tem como meta estudar os danos nos pilares provocados pelo desmonte com explosivos em camadas de carvão tendo como hipótese de estudo que os danos no pilares diminuem em profundidade no interior do pilar, devendo ocorrer aumento na integridade da rocha desde as bordas até o núcleo do pilar. A validade da hipótese de estudo foi vericada em testemunhos de rocha obtidos por sondagem horizontal, nos quais foram feitos ensaios de resistência (carga pontual, tração (brasileiro), compressão uniaxial), ensaios de medição de velocidade ultrasônica e de velocidade de partícula (medição de vibração), além da descrição detalhada dos pedaços de testemunhos com a técnica de avaliação da integridade do maciço denominada . RQD Com a única excessão do ensaio de carga pontual, as outras técnicas utilizadas forneceram resultados úteis e indispensáveis aos cálculos que se fizeram a partir dos parâmetros obtidos com o RQD e vibração (as duas técnicas consideradas fundamentais na dissertação). Nessa dissertação, ficou comprovada a hipótese de estudo e o dano no pilar foi dividido em zonas de rocha com índices de fraturamento decrescente no sentido do núcleo do pilar: uma primeira zona com fragmentação intensa por compressão e duas outras, seguintes, fraturadas por cisalhamento, efeito das ondas sísmicas da detonação do explosivo. Os resultados obtidos nessa dissertação mostraram que os danos no pilar podem ser bem avaliados, que existem zonas distintas de fragmentação, as quais podem ser incorporadas no dimensionamento de pilares. As técnicas utilizadas ( RQD e vibração) foram eficientes na determinação dos danos provocados pelo explosivo, sendo, no entanto, necessário a introdução de modificações na padronização dos ensaios para melhor adaptá-los às condições de amostragem de campo.
157

Abordagem probabilística em um modelo de programação linear aplicado ao planejamento mineiro

Carvalho Junior, José Adolfo de January 2006 (has links)
Neste trabalho é discutido o impacto causado pelos parâmetros de processo com comportamento estocástico em um modelo de otimização, aplicado ao planejamento mineiro. Com base em um estudo de caso real, construiu-se um modelo matemático representando o processo produtivo associado à mineração, beneficiamento e comercialização de carvão mineral. Este modelo foi otimizado com a técnica de programação linear, sendo a solução ótima perturbada pelo comportamento estocástico de um dos principais parâmetros envolvidos no processo produtivo. A análise dos resultados permitiu avaliar o risco associado à decisão ótima, sendo com isto proposta uma metodologia para avaliação do risco operacional. / This work analyses the impact caused by stochastic process parameters on a mine planning optimization model. One real case was taken to construct a mathematical model representing the coal production process. This model was optimized using the linear program concepts where the best solution was disturbed by stochastic behavior of main parameters involved in the production process. The results analysis has allowed the evaluation of risks associated with the best solution. Finally, is proposed a methodology to evaluate the operation risk.
158

Caracterização e gênese de solos construídos após mineração de carvão na mina Boa Vista, município de Minas do Leão, RS / Characterization and genesis of constructed soils in coal mineareas in the Boa Vista coal mine, Minas do Leão, RS, Brazil

Quiñones, Oscar Rafael Gadea January 2004 (has links)
A mineração de carvão em lavra a céu aberto provoca a mistura dos materiais sobrejacentes ao carvão e que são, posteriormente, utilizados no preenchimento das cavas mineradas. O processo de construção dos solos e a mistura podem ocasionar problemas ambientais pelas alterações quimicas e fisicas provocadas nos solos construidos. A fimde comparar solos construidos de diferentes idades, caracterizou-se a coluna geológica. o ~Io natural originale solos construidos de 2 anos e de 24 anos da mina de carvão Boa Vista, no Municípiode Minas do Leão, RS. A descrição morfológicado perfil do solo e as análises quimicas e fisicas demonstram que os solos construidos apresentam sérias limitações físicas, impedindo o desenvolvimento normal da vegetação. Ademais. diferenças quimicas entre os perfis de diferentes idades originam-se principalmente da utilização de materiais geológicos e processos de construção distintos, do que pelos processos pedogenéticos. Quanto à evolução temporal dos solos construidos, observou-se que está fortemente caracterizada pela intemperização acido-sulfatada, intensificando-se na sub-área mais antiga. O potencial de acidificação e o potencial de neutralização determínados na coluna geológica indicam a existência de camadas com alto potencial gerador de Drenagem Ácida de Minas, recomendando-se o cuidado na deposição final destas camadas. Os resultados deste estudo indicam que as propriedades químicas e fisicas determinadas nos solos construidos servem como indicadores para o monitoramentode áreas construídas,visando a prevenção de danos ambientais. / Open pit coal mining causes the mixture of the materiais used in the filling of the abandoned mine diggings. Such mixture can cause environmental problems because of the chemical and physical alterations in constructed soils. In order to compare constructed soils of different ages, it was made a characterization of the geologic column, of the natural soil, and of constructed soils 2 and 24 years old in the Boa Vista coal mine, located in Minas do Leão, RS, Brazil. Morphological description and physical and chemical analyses indicate that the constructed soils present serious physical limitations, reducing the normal development of vegetation. Additionally, differences in chemical properties between soil profiles of the two constructed soils derived from the use of different geologic materiais and processes of construction than by the pedogenetic processes. The evolution of constructed soils is strongly influenced by the acid-sulfate weathering that is more intense in the oldest sub-area. acidification potential and neutralization potential determined in the geologic column indicate the existence of layers with high potential of generation of acid mine drainage, which have to have special management when deposited or disposed. The results of this study indicate that some chemical and physical properties of constructed soils may be used as indicators in monitoring constructed areas, aiming the prevention of environmental damages.
159

Aumento da eficiência dos métodos següenciais de simulação condicional

Pilger, Gustavo Grangeiro January 2005 (has links)
O algoritmo de simulação seqüencial estocástica mais amplamente utilizado é o de simulação seqüencial Gaussiana (ssG). Teoricamente, os métodos estocásticos reproduzem tão bem o espaço de incerteza da VA Z(u) quanto maior for o número L de realizações executadas. Entretanto, às vezes, L precisa ser tão alto que o uso dessa técnica pode se tornar proibitivo. Essa Tese apresenta uma estratégia mais eficiente a ser adotada. O algoritmo de simulação seqüencial Gaussiana foi alterado para se obter um aumento em sua eficiência. A substituição do método de Monte Carlo pela técnica de Latin Hypercube Sampling (LHS), fez com que a caracterização do espaço de incerteza da VA Z(u), para uma dada precisão, fosse alcançado mais rapidamente. A técnica proposta também garante que todo o modelo de incerteza teórico seja amostrado, sobretudo em seus trechos extremos. / Sequential simulation is probably the most used algorithm in geostatistical simulation, specially the sequential Gaussian algorithm. In theory, this method maps the space of uncertainty as the number realizations increase. However, some times the number of simulations needs to be large which makes the procedure prohibitive. This Thesis presents a more efficient strategy. The idea is to replace the Monte Carlo simulation by the Latin Hypercube Sampling (LHS) technique in order to improve the efficiency of the algorithm. The use of the modified algorithm showed that the space of uncertainty related to the random variable modeled was faster obtained than the traditional Monte-Carlo simulation for a given degree of precision. This approach also ensures that the model of uncertainty is better represented in its entirety.
160

Método de mineração de processos para auxílio à tomada de decisão : um estudo de caso no controle de férias

Gandulfo, Pablo Ignacio 21 July 2016 (has links)
Dissertação (mestrado)—Universidade de Brasília, Instituto de Ciências Exatas, Departamento de Ciência da Computação, 2016. / Submitted by Camila Duarte (camiladias@bce.unb.br) on 2016-09-01T19:47:04Z No. of bitstreams: 1 2016_PabloIgnácioGandulfo.pdf: 5521073 bytes, checksum: 55a29dfb170f7b470c29b4d44fe55f21 (MD5) / Rejected by Raquel Viana(raquelviana@bce.unb.br), reason: Bom dia, Há erros na descrição da citação bibliográfica e o campo de Informações adicionais não foi preenchido. Atenciosamente, on 2016-11-04T10:41:14Z (GMT) / Submitted by Camila Duarte (camiladias@bce.unb.br) on 2016-12-05T14:12:37Z No. of bitstreams: 1 2016_PabloIgnácioGandulfo.pdf: 5521073 bytes, checksum: 55a29dfb170f7b470c29b4d44fe55f21 (MD5) / Approved for entry into archive by Raquel Viana(raquelviana@bce.unb.br) on 2017-01-04T19:01:46Z (GMT) No. of bitstreams: 1 2016_PabloIgnácioGandulfo.pdf: 5521073 bytes, checksum: 55a29dfb170f7b470c29b4d44fe55f21 (MD5) / Made available in DSpace on 2017-01-04T19:01:46Z (GMT). No. of bitstreams: 1 2016_PabloIgnácioGandulfo.pdf: 5521073 bytes, checksum: 55a29dfb170f7b470c29b4d44fe55f21 (MD5) / A prática de mineração de processos tem sido impulsionada pela necessidade das organizações conhecerem cada vez mais os seus processos de negócio. No entanto, ainda existem alguns desafios e obstáculos a serem superados. Pode-se citar a escassez de modelos e métodos que efetivamente ajudem as organizações a reduzir custos e otimizar o uso de recursos nos fluxos de trabalho organizacionais. Neste cenário, o objetivo geral desta pesquisa é descrever um modelo de mineração de processos para o apoio à tomada de decisões nas organizações, aplicando-o no âmbito do processo de gestão de pessoas nas organizações públicas. O método de mineração desenvolvido foi definido através da junção dos métodos de Bozkaya et al. (2009) e van der Ham (2015), e ilustrado através de uma descrição detalhada dos passos envolvidos. O método foi aplicado em um estudo de caso real numa organização judicial. Foi descoberto um retrabalho de 4,3 vezes na tarefa "Alterar Homologação de Férias". Além disso, o papel "Analista de RH" está consideravelmente sobrecarregado, pois, atua em 47,05% das atividades realizadas, apesar de representar apenas 3,45% dos recursos envolvidos. Esses indicadores de desperdício permitem uma tomada de decisão do gestor para melhoria no processo de controle de férias da organização estudada. ______________________________________________________________________________________________________ ABSTRACT / The increase of process mining's practice has been driven by the need from organizations to better understand their processes. On the other hand, there are still some challenges and obstacles to be overcome. One could mention the lack of models and methods that effectively help government organizations to reduce costs and optimize the use of resources on their personnel management's workflows. In that respect, the objective of this research is to describe a model for process mining to support decisionmaking in organizations, applying it in the personnel management's processes at government organizations. The mining method developed was defined by a combination of the methods of Bozkaya et al. (2009) and van der Ham (2015), with a detailed description of the several steps involved. The method was applied in a real case study at a government organization from the judicial area. A 4.3 times rework was discovered on "Change Vacation approval" task. Besides that, the role "HR Analist" is considerably overloaded because it acts in 47.05% of all activities in spite of representing 3.45% of all resources involved. This waste indicators allow for the decision-making of the manager to improve the vacation control process of the organization analyzed.

Page generated in 0.0491 seconds