Spelling suggestions: "subject:"dew building"" "subject:"cew building""
201 |
Selhání implementace státní kulturní politiky na příkladu projektu stavby nové budovy Národní knihovny / Implementation of a culture policy project of new building of National Library of the Czech Republic and its failurePetříková, Lucia January 2011 (has links)
The thesis focuses on a chosen public policy issue, as a part of cultural policy, namely on an implementation of a project of new building of National library of Czech Republic in Prague, arisen from an international architecture competition. This thesis has a form of a case study paper and investigates all relevant events and circumstances of the case, as well as interested stakeholders. They were characterised to disclose their possible role in implementation deficit, which occurred in the case. The aim of this thesis is to provide complex insight into the case, to find the point of implementation deficit in the process and to identify the values and hidden motivations of stakeholders. The thesis is divided into three chapters. In the first chapter, there is a summary of theoretical knowledge about public policy and implementation process and its analysis. The author describes three possible approaches to implementation analysis. Second chapter focuses on culture and its specifics, in the forming of culture policy. The third chapter is a complete analysis of the case, including event analysis and stakeholder analysis. In the conclusion, the author sums up the identified causes of implementation deficit and gives recommendations for possible future implementation of a similar cultural project.
|
202 |
Ubytovací zařízení / AccommodationMadejewský, Radek January 2022 (has links)
The subject of the final thesis is the elaboration of design documentation for the new construction of an accommodation facility, specifically a boarding house intended for recreation. The new building is located in the cadastral area of ??the village Vernířovice. It is a building with three floors above ground and one underground floor. The building is based on foundation strips made of plain concrete and a foundation slab made of reinforced concrete. The vertical load-bearing structures are made of cley blocks and blocks of permanent formwork. Horizontal load-bearing structures are made of reinforced concrete. The roof structure is saddle with elongated dormers.
|
203 |
Polyfunkční dům areálu Slavkov / Mixed-use building in the Slavkov complexMilota, Martin January 2022 (has links)
The building in a question is a new build mixed-use building. It is situated in industrial area of Slavkov u Brna and is intended for employees of this area. In the underground floor is situated collective garage for 18 personal automobiles. First floor is designed for retail sale. Specifically general store, boutique and cafe. In the second and third floor are accommodation units for area employees. Specifically 12 accommodation units. Building has a flat roof with asphalt strip coating. The load-bearing system of the building is designed as a reinforced concrete skeleton, THERM-type bricks are used for the construction while thermal comfort is achieved by a certified external thermal insulation composite system (ETICS) featuring façade polystyrene. There is parking space area in front of the building.
|
204 |
Penzion U Odry / Guesthouse "U ODry"Spáčilová, Kristýna January 2022 (has links)
The subject of this diploma thesis is the project documentation of the new building - pension U Odry in Přerov-Kozlovice. Accommodation capacity is 36 people. In the pension there is also restaurant. The building is designed as a three-storey. On the first floor there are rooms for guests entering the accommodation facility, facilities for accommodation, technical facilities of the building and the restaurant, including premises for its operation. There are guest rooms on the second and third floors. The bases are made up of strip foundations. The external loadbearing mansards and partitions are made of YTONG lightweight concrete blocks. The internal loadbearing masonry is made of SILKA lime-sand blocks. The ceiling structure is designed from SPIROLL prestressed concrete floor slab. The roofing of the building is solved using flat vegetation roofs.
|
205 |
Polyfunkční dům / Multifunctional buildingVecheta, Jan January 2022 (has links)
The assignment of the diploma thesis is the elaboration of project documentation for the construction. It is a detached multifunctional house, which is located on a slightly sloping terrain. The building consists of four floors and is partially basement. In the basement of the building there are mainly storage spaces, which are designed for housing units located on the highest floors. The space of the first two floors consists mainly of commerce and there is a sports shop, massage equipment, hairdresser and office space. The building is based on simple concrete foundation strips. The perimeter masonry of the basement is made up of concrete blocks, which create lost formwork for concrete filling. The load-bearing masonry of the building consists mainly of ceramic blocks. The ceiling structures are made of Spiroll panels, which are complemented by reinforced concrete monolithic slabs. The building is insulated with the Etics contact insulation system. The roof is designed as a single-skin vegetation roof.
|
206 |
Speciálně pedagogické centrum / Special education centreGilbert, David January 2022 (has links)
The aim of my master's project is to design a new building of a Special education centre with nearly zero energy consumption. The project consists of three main parts. The building is designed with a green flat roof with a load-bearing part formed by prestressed ceiling panels. The load-bearing wall masonry consists of ceramic blocks with stone wool insulation panels with longitudinal fibres. The building is divided into two main parts connected by a connecting entrance hall. First department is used mainly for therapy rooms and the other department for the offices of special pedagogical staff. The building also contains photovoltaic panels, air-handling units with heat recovery and a rainwater storage reservoir with the possibility of using rainwater for flushing. The next part of the master's project deals with the assessment of the life cycle of the structure (LCA), where the subject of assessment are various types of floor structures.
|
207 |
Administrativní budova JMC Brno / Office building JMC BrnoHonzl, Jakub January 2022 (has links)
The aim of this master’s thesis is to elaborate the project documentation of an office building in Brno with nearly zero energy consumption. This building consists of 2 parts. First part is a two-storey building with a basement. In the basement are storages and mechanical rooms. On the first floor is a cafe and sanitary facilities. On the second floor is an open-space, two meeting rooms and a manager's office. Second part of the building are garages that has one above ground floor and one underground floor. The structural system of the building is RC frame, and it stands on grillage foundation. The office part is roofed with warm flat roof and external walls are insulated with insulating panels made of mineral wool. The garage part is roofed with green roof. This master’s thesis consists of 3 parts. First one processes the application for a building permit. Second part deals with technical equipment of the building namely design of boiler, ventilation and photovoltaic panels. Third part deals with life cycle assessment of different composition of floors. It compares these floors and evaluates them. And in the end the floor which has the best results is implemented back into the project.
|
208 |
Polyfunkční dům / Multifunctional buildingOulehla, David January 2021 (has links)
The subject of this diploma thesis is the project documentation of the new multifunctional building on the plot in Oslavany. The building is planted in the shape of a letter L.
|
209 |
Památková obnova Bratmannovy vily - Valašské Klobouky / The monument restoration Bratmann villas - Valašské KloboukyZámečník, Marek January 2016 (has links)
The Master's thesis comes with an idea of general renovation of the building and its surroundings of Elementary art school in Valašské Klobouky. To expand the insufficient and inappropriate space, the new building will be added to present monumental art nouveau Bratmann's villa which will be completely restored to its former appearance from year 1896. The thesis contains widespread analytic part aimed on theoretical preparation for restoration. The plan was to create harmonious changeover between the old building used for musical education and the new building used for the rest of the art education.
|
210 |
Stavba-Prostor-Město "Dostavba městského bloku" / Structure-Space-City "Urban block completion"Langnerová, Karolina January 2019 (has links)
This work seeks to verify the possible construction of a kindergarten in very confined conditions in the courtyard so that children can take dignified first steps in educational facilities and at the same time to economically use the land in the city center.
|
Page generated in 0.051 seconds