Spelling suggestions: "subject:"newly"" "subject:"fewly""
391 |
勞工退休金新制下之最適轉換時點與轉換價值評析紀穎昱, CHI,YING-YU Unknown Date (has links)
勞退新制即將在 94年 7 月 1 日起正式實施,在新的退休金體系下,勞工可由舊制的確定給付制轉換到擁有資產配置與投資決策權利的確定提撥制。台灣的勞退新制可分為兩種退休金制度供勞工選擇-個人帳戶制及其他年金制。確定提撥制與確定給付制在本質上有諸多的差異性,分別具有不同的優缺點,在本文的假設下,轉換選擇權存在於個人帳戶制與其他年金制之間。另外,在期望達到勞工退休金財富極大化的目標下,勞工會選擇在適當的時點,由個人帳戶制轉換到其他年金制。
雖然本文是採定值模型來分析,但是提供一個直觀上充分的洞悉與表徵,來解釋勞退新制下之個人帳戶制及其他年金制之間,若存在一最適轉換時點,其在經濟意涵中所表示之抵換關係與經濟價值為何。本文建構一個退休金財富極大化之模型,結合數值模擬的方法來分析其要點。研究結果發現,最適轉換時點之衡量,是由兩種制度下的變動率,而非帳戶內金額之大小來決定;此外,年金精算現值計算經折現後的給付率和剩餘工作年數,對於勞動工作者的選擇也屬重要變數之一。另外,本文針對年輕的勞工,在不同投資報酬率環境下,計算出兩種制度間抵換的價值;最後,本文也探討了執行轉換選擇權對於不同年紀的勞動工作者影響的幅度。總而言之,本文希望提供勞動工作者在勞退新制下,一個退休金財富配置最適化的準則,及執行轉換選擇權時參考的方針。 / The newly Labor Pension Act will be carried out in 2005 soon. Under this new pension system, employees will be given the choices of converting their traditional defined benefit (DB) pension plan into an individual-account defined contribution (DC) pension plan with full control over assets allocation and investment decisions. Under DC pension plan in Taiwan, there are two types of pension plan- Individual Account System and Commercial Pension Plan System- for employees to choose. DC and DB pension plan are totally different in essences, so on the basis of our assumptions, switch options will exist among Individual Account System and Commercial Retirement Plan System. Thus, in order to maximum employees’ retired wealth, employees might choose the optimal time to convert Individual Account System into Commercial Pension Plan System.
Although our model is deterministic in nature, we believe that it provides an intuitive insight about switch options. We find not only the optimal switch time between Individual Account System and Commercial Retirement Plan System but also the “trade-off” economic values. This paper designs a model of maximizing retired wealth and makes numerical simulation to analyze optimal switch time. We find it is the “rate of change” of these two different pension systems affects the times for employees to exercise switch options. Besides, both the payment-rate scaled present value of the DB pension annuity and the retirement horizon are significant parameters in our analysis. Third, we also calculate the threshold investment returns between Individual Account System and Commercial Pension Plan System under various investment environments. Finally, we also contrast the effects of exercising switch options between younger and older employees. In short, we want to provide some principles for employees to make the optimal retired wealth allocation under Newly Labor Pension Act, then exercise switch options at the proper time.
|
392 |
Induction and professional development support of newly qualified professional nurses during community serviceMakua, Memme Girly 06 1900 (has links)
Text in English / In South Africa, retention of newly qualified professional nurses in public health institutions upon completion of their year of compulsory remunerated community service remains a challenge that exacerbates the shortage of professional nurses in these institutions. The literature indicates that many newly qualified professional nurses leave the public health institutions due to lack of professional development support and heavy workloads while they are still finding their feet.
A mixed-methods design of concurrent triangulation approach was used to answer the question: How are the newly qualified professional nurses supported in terms of induction and professional development during community service in South Africa? Triangulation was achieved by using both quantitative and qualitative methods. Induction/orientation documents from public health institutions were analysed using a checklist. A survey questionnaire with mixed quantitative closed items (1–43) and qualitative open-ended questions (43–46) was sent to newly qualified professional nurses who had recently completed community service. Focus groups held with operational nurse managers and individual interviews with coordinators of community service for nurses yielded rich qualitative data. Descriptive and inferential statistics were used to describe and synthesise data.
The qualitative findings confirmed the quantitative findings. Findings were lack of professional development support in some public health institutions, informal, non-comprehensive support where given, shortage of experienced professional nurses, reluctance by some professional nurses and operational nurse managers to supervise
newly qualified nurses, and increased workload due to the shortage of experienced professional nurses in the public health institutions. Inadequate clinical skills, poor discipline and lack of professionalism in the newly qualified professional nurses also played a part. Respondents suggested constructive recommendations for the induction and professional development support of the newly qualified professional nurses, and these were incorporated in the recommended guidelines for the induction and professional development support of newly qualified professional nurses during community service. / Health Studies / D. Litt. et Phil. (Health Studies)
|
393 |
Compétences d’infirmiers nouvellement diplômés d’un programme de baccalauréat basé sur l’approche par compétences : une ethnographie ciblée d’un milieu de soins aigusCharette, Martin 04 1900 (has links)
No description available.
|
394 |
Relations internationales, politiques publiques, marché de l’Art et Essai, trois questions préalables pour une étude de la diffusion des inédits du Sud en salle en France de 1990 à 2007 / International relations, public policy, art house film market : three preliminary questions for the study of the distribution of films from the south in the cinemas between 1990 and 2007Prévoteau, Karine 18 December 2014 (has links)
Les inédits du Sud révèlent une double qualité pour fonder une recherche en cinéma : ils sont à la fois les expressions marquées et les filtres d’observation privilégiés des environnements de trois grands domaines : les Relations internationales, la politique publique et le contexte français du marché de l’Art et Essai. Autour et grâce à un corpus de 430 films de longs métrages distribués commercialement pour la première fois en salles en France entre 1990 et 2007 [Afrique subsaharienne, Mena Iran, Asie centrale, Asie, Amérique Latine] cette thèse propose :- une étude de la construction de la scène culturelle de la diplomatie au sein des politiques étrangères bilatérales et multilatérales, à l’échelle française et européenne et de la place assignée au cinéma par le phénomène des fonds d’aide à la production [Fonds Sud, HBF, ACPFILMS…] dans l’action plus vaste en faveur de l’audiovisuel extérieur ;- une mise en perspective de la construction de la politique publique cinématographique, de ses problématisations successives en lien avec les activités professionnelles et le marché , de la question du paritarisme de ses cadres de décision et d’une conception propre de l’action culturelle et surtout de l’Art et Essai comme projet, mouvement et système puis comme spécialisation éditoriale de la distribution ;- une étude plus monographique des trajectoires de quelques cinématographies du Sud selon la problématique d’une symétrie supposée autour d’un indicateur de production entre marché de provenance et marché français [Chine, Iran, Argentine, Brésil, Mexique] et selon la problématique des small cinemas [Tunisie, Liban, Maroc, pays d’Afrique subsaharienne]. / The study of newly released films from the ‘South’ opens up interesting new perspectives for research in cinema studies. These films not only inform us about international relations, public policy and the art house cinema market in France but have also led to some original conclusions.This thesis is based on a study of 430 long feature films released in France between 1990 and 2007 from Subsaharan Africa, the MENA region, Iran, Central Asia, Asia and Latin America. In this dissertation, we propose:- an analysis of the construction of cultural diplomacy in the context of bilateral and multilateral foreign politics. This treatment operates at the levels of French and European politics and examines the place of cinema with respect to the agencies that finance film production [Fonds Sud, HBF, ACPFILMS…] as well as the larger context of external funding for audio-visual productions in general;- an assessment of the construction of public policy concerning film, with an examination of the successive strategies for coping with professional activities and the market. Here, we examine industrial relations and cooperative decision making as well as the reflections concerning the conception of cultural activity and, above all, art house cinema as a project, movement and system then later as a specialist form of production and distribution;- a study of the trajectories of a selected group of film cultures from the south. This study turns around two issues; the purported symmetry between the market of the country where the film is made and the French market as measured by production statistics [China, Iran, Argentina, Brazil, Mexico] and the question of ‘small cinemas’ [Tunisia, Lebanon, Morocco, sub-Saharan Africa].
|
395 |
Vysokoškolské koleje / University dormitoriesKubínová, Veronika January 2019 (has links)
The diploma thesis deals with project of a new building of university dormitories in the city center of Brno. It is detached building with basement and four above-ground floors with the irregular rectangular shape. Dormitories can be divided into three fundamental parts. The underground garages can be considered as the first part. Parking places are designed only for students, occasional visitors, and employees. In the underground floor, technical rooms and large warehouse can be found. The second part is designed to the general public including association areas such as reception, coffee-house with outdoor terrace, copy center and tobacco shop. Rooms for students, manager offices, repairman’s room, and laundry can be found in the third part. In total there are 44 two-person rooms and one room for a disabled person on the second floor. The structural system of the building is a cast-in-place concrete frame with a filling of ceramic fittings. The external wall is insulated with mineral wool with a ventilated facade and fiber-cement facade tiles. The building is based on base piles with a pile under each pillar. Vegetation covers a flat roof as well as a part of the north side of the facade. There will also be a public park and two volleyball fields in the area.
|
396 |
Novostavba polyfunkčního domu v Tišnově / Mixed-use Building in TišnovMatoušek, Jan January 2020 (has links)
The subject of this diploma thesis is the design of a newly built mixed-use building in Tišnov, as well as elaboration a part of the project documentation for realization of the building construction. The designed building is a multifunctional building, which has the task of providing several functions. The building is situated in the South Moravian Region in the northern part of the village Tišnov, which is located about 30 kilometers away from the city of Brno. Recently, in this area new family houses and apartment buildings have been built. The building is designed as five above-ground storey, partially basement incl. a separate underground car park. The first floor serves mainly for commercial use, ie. for the provision of services and for the sale of goods. There is a coffee shop, a houseware store, hairdressers, bakers, butchers, or a gym. On the first floor there is also the main entrance to the building, and through there is further access to the upper or lower floors of the building. In the basement there is a technical background of the building and access to the underground parking. The second floor serves as office space for multipurpose use. There are apartments on the third, fourth and fifth floor, with some apartments on the 4th floor being designed as two-level maisonettes. The architectural design is based on the concept of straight lines and sharp edges, which also presents a flat roof roofing solution and receding storey with terraces. The building is detached, situated in a relatively flat terrain. All entrances to the building are designed as barrier-free. The white-blue color of the building facade alternates with the use of gray stone cladding. The roofing of the mixed-use building is solved on two levels by a single-layer extensive vegetation flat roof.
|
397 |
Zděný bytový dům / Masonry Block of FlatsŠotkovský, David January 2013 (has links)
This Master´s thesis is focused on block of flats project documentation, claims for fire safety and thermal and acoustic properties of structures. The brick building is detached and has three floors without basement. These floors are connected by a lift. The block of flats is based on the footings, external walls are insulated by a contact thermal insulation system. The tent roof is consists of truss in two levels. The building is designed for nine flats and one of these flats is wheelchair accessible. Truss design is also a part of the project.
|
398 |
Horský hotel / Mountain hotelKyceltová, Lucie January 2014 (has links)
The theme of this work is the building design, brand new mountain hotel with wellness services in Spindleruv Mlyn. The plot is located in a quiet part of town, near a wooded area and form a river Labe.V designed hotel is located three floors above ground level of the building is solved attic space. Roofed by a wooden roof false hip roof. Ground unsophisticated form a geometric shape, which layout is divided into sections. On the ground floor wellness facilities, a portion of the input dopňkovými with hotel services, floor is done mainly for accommodation, as well as the attic. Hotel is equipped with a slightly sloping plot in the construction of houses and other hotels. All living spaces are naturally ventilated and illuminated. The supporting structure consists Liapor system. The appearance of the hotel is in line with the surroundings.
|
399 |
Novostavba polyfunkční budovy, Frýdek-Místek / Newly-built mixed-use building, Frydek-MistekBystroň, Patrik January 2016 (has links)
Diploma thesis focuses on the processing of detailed documentation for newly-built mixed-use building in Frýdek-Místek. The building has three above ground floors. On the first floor there is a restaurant with facilities. On the second and third floor there are office spaces. The building has combined support system, which is a reinforced concrete slab carried by masonry wall system of sand-lime blocks and reinforced concrete columns. The entire building is insulated using external contact thermal insulation system outside the first floor, which is designed ventilated facade with thermal insulation of mineral wool. The roof of the building is designed as a non-walkable flat single roof.
|
400 |
Víceúčelový objekt Brno / Multifunctional building in BrnoVečeřa, Lukáš January 2016 (has links)
This thesis solves new building multifunctional building in Brno in the form of documentation for construction. The work contains text, drawings and calculation part. The building is designed as a detached and located in a slightly sloping terrain. The new building is designed as a four-storey with basement and three floors. The facility is designed sixteen and four residential rental units. The structural system is a cross- walled ceramic fittings. Horizontal structures ceilings are made of precast filigree ceiling tiles with nadbetonovanou distribution plates. The roof is designed as a single-layer flat. Part of the main road in the building is designed passenger elevator. The work process basic assessment of building in terms of building physics and approximate calculation of the base area.
|
Page generated in 0.0243 seconds