• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 5
  • Tagged with
  • 5
  • 5
  • 5
  • 4
  • 4
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Uma visão integrada do planejamento da expansão e da operação energética do sistema elétrico brasileiro. / An integrated vision of the expansion planning and the energy operation of the brazilian power system.

Azevedo Filho, Jorge Marques de 10 March 2006 (has links)
Esta Tese teve como inspiração inicial a preocupação quanto ao suprimento de energia elétrica ao Sistema Interligado Brasileiro dentro do horizonte coberto pela operação energética, qual seja, cinco anos à frente. A pergunta que não podia calar era: o que pode ser feito para aumentar a garantia de suprimento neste período? Para fundamentar as propostas de ações definidas nesta Tese, o trabalho começa mostrando a evolução da operação energética no Brasil e a respectiva cadeia lógica e concepção do software utilizado, e, em seguida, apresenta uma ampla revisão e complementação das metodologias e ferramentas computacionais utilizadas na expansão da geração de energia elétrica. Com base nestes alicerces desenvolveu-se uma análise e diagnóstico dos diversos aspectos que envolvem a interação entre o planejamento da expansão da geração e a operação energética, bem como entre a operação energética e os estudos e procedimentos de distribuição de energia elétrica. E, finalmente, para cada um dos aspectos mencionados, são propostas ações efetivas para aumentar a garantia de suprimento de energia elétrica ao sistema de potência brasileiro, sempre fundamentadas em experiências reais, e, quando plausível, em \"Estudos de Casos\". / The initial inspiration of this Thesis relates to the preoccupation about the Brazilian power system supply with regards to the operation?s energy planning horizon, which means considering five years ahead. The question was: what can be done to reinforce the power system supply during this period? In order to fundament the proposed actions defined in this Thesis, the work starts showing the Brazilian energy operation?s evolution, its logical chain and software conception and, in continuation, presents a revision and complementation of the methodology and software used for the Brazilian generation system expansion planning. Based on this background, an analysis and diagnostics of the several aspects involved in the interaction between the generation system expansion planning and the energy operation planning, as well as the interaction between the energy operation planning and the power system distribution studies and proceedings were developed. And, finally, for each one of the aspects mentioned, effective actions were proposed to reinforce the power system supply, proposals always based on real experiences and, when plausible, on specific \"Cases Studies\".
2

Uma visão integrada do planejamento da expansão e da operação energética do sistema elétrico brasileiro. / An integrated vision of the expansion planning and the energy operation of the brazilian power system.

Jorge Marques de Azevedo Filho 10 March 2006 (has links)
Esta Tese teve como inspiração inicial a preocupação quanto ao suprimento de energia elétrica ao Sistema Interligado Brasileiro dentro do horizonte coberto pela operação energética, qual seja, cinco anos à frente. A pergunta que não podia calar era: o que pode ser feito para aumentar a garantia de suprimento neste período? Para fundamentar as propostas de ações definidas nesta Tese, o trabalho começa mostrando a evolução da operação energética no Brasil e a respectiva cadeia lógica e concepção do software utilizado, e, em seguida, apresenta uma ampla revisão e complementação das metodologias e ferramentas computacionais utilizadas na expansão da geração de energia elétrica. Com base nestes alicerces desenvolveu-se uma análise e diagnóstico dos diversos aspectos que envolvem a interação entre o planejamento da expansão da geração e a operação energética, bem como entre a operação energética e os estudos e procedimentos de distribuição de energia elétrica. E, finalmente, para cada um dos aspectos mencionados, são propostas ações efetivas para aumentar a garantia de suprimento de energia elétrica ao sistema de potência brasileiro, sempre fundamentadas em experiências reais, e, quando plausível, em \"Estudos de Casos\". / The initial inspiration of this Thesis relates to the preoccupation about the Brazilian power system supply with regards to the operation?s energy planning horizon, which means considering five years ahead. The question was: what can be done to reinforce the power system supply during this period? In order to fundament the proposed actions defined in this Thesis, the work starts showing the Brazilian energy operation?s evolution, its logical chain and software conception and, in continuation, presents a revision and complementation of the methodology and software used for the Brazilian generation system expansion planning. Based on this background, an analysis and diagnostics of the several aspects involved in the interaction between the generation system expansion planning and the energy operation planning, as well as the interaction between the energy operation planning and the power system distribution studies and proceedings were developed. And, finally, for each one of the aspects mentioned, effective actions were proposed to reinforce the power system supply, proposals always based on real experiences and, when plausible, on specific \"Cases Studies\".
3

Componentes de software no planejamento da operação energética de sistemas hidrotérmicos / Software components at the energetic operation planning of hydrothermal systems

Rabêlo, Ricardo de Andrade Lira 02 August 2010 (has links)
O planejamento da operação de sistemas hidrotérmicos pode ser classificado como um problema de um sistema acoplado no tempo e no espaço, não linear, não convexo, estocástico e de grande porte. A complexidade do problema justifica a necessidade de utilização de diversas ferramentas computacionais com abordagens variadas. Este trabalho tem como objetivo a realização de estudos relacionados ao planejamento da operação energética de sistemas hidrotérmicos de geração, pela aplicação de componentes de software e de sistemas de inferência fuzzy. Pretende-se apresentar e aplicar um processo de desenvolvimento (UML Components), baseado em componentes de software, para a construção de modelos computacionais de simulação e otimização para servir de apoio ao planejamento da operação energética do sistema hidrotérmico brasileiro. O processo de desenvolvimento UML Components é aplicado de forma a nortear o desenvolvimento do software, para englobar as diferentes atividades realizadas nos fluxos de trabalho, além de incluir os vários artefatos produzidos. Como contribuição adicional, paralelamente ao uso dos componentes de software, este trabalho apresenta uma política de operação energética para reservatórios baseada em sistemas de inferência fuzzy Takagi-Sugeno. A política proposta é baseada na otimização da operação energética das usinas hidrelétricas, empregando o modelo de otimização desenvolvido. Com a operação energética otimizada, obtém-se as relações entre a energia armazenada do sistema e o volume útil operativo de cada usina a reservatório. A partir dessas relações são ajustados os parâmetros do modelo Takagi-Sugeno de ordem um. Ao optar-se por um sistema de inferência fuzzy para determinar a política de operação energética de um conjunto de reservatórios, obtém-se uma estratégia de ação/controle que pode ser monitorada e interpretada, inclusive do ponto de vista lingüístico. Outra vantagem na aplicação de sistemas fuzzy deve-se ao fato dos operadores humanos (especialistas) poderem traduzir, de forma consistente, e em termos de regras lingüísticas, o seu processo de tomada de decisões, fazendo com que a ação do sistema fuzzy seja tão fundamentada e consistente quanto a deles. / The operation planning of hydrothermal power systems can be classified as a nonseparable, nonlinear, nonconvex, stochastic and of large scale optimization problem. The complexity of this problem justifies the need for the use of various computational tools with different approaches. This work aims the accomplishment of studies related to the operation planning of hydrothermal power systems through the implementation of software components and fuzzy inference systems. It is intended to provide and implement a development process (UML Components) based on software components for building computational model of optimization and simulation to support the operation planning of the Brazilian hydrothermal power systems. The UML Components development process is a applied in a way to guide the software development to encompass different activities realized on workflows, as well as to include the various artifacts produced. As additional contribution, in parallel to the use of software components, it is intended to present an operational policy of reservoirs based on Takagi-Sugeno fuzzy inference systems. The proposed policy is based on optimization of hydropower operation, using the optimization model developed. Through the optimized operation, relations between system stored energy and the reservoir volume of each plat are obtained. With these relationships, the parameters of the Takagi-Sugeno model are adjusted. In choosing a fuzzy inference system for determining the operational policy of a set of reservoirs, it is obtained as strategy of action/control that can be monitored and interpreted including linguistic standpoint. Another benefit of the fuzzy system application refers to the fact that human specialists can consistently represent, through linguistic rules, their decision making process, making the fuzzy system action as consistent and sound as theirs.
4

Componentes de software no planejamento da operação energética de sistemas hidrotérmicos / Software components at the energetic operation planning of hydrothermal systems

Ricardo de Andrade Lira Rabêlo 02 August 2010 (has links)
O planejamento da operação de sistemas hidrotérmicos pode ser classificado como um problema de um sistema acoplado no tempo e no espaço, não linear, não convexo, estocástico e de grande porte. A complexidade do problema justifica a necessidade de utilização de diversas ferramentas computacionais com abordagens variadas. Este trabalho tem como objetivo a realização de estudos relacionados ao planejamento da operação energética de sistemas hidrotérmicos de geração, pela aplicação de componentes de software e de sistemas de inferência fuzzy. Pretende-se apresentar e aplicar um processo de desenvolvimento (UML Components), baseado em componentes de software, para a construção de modelos computacionais de simulação e otimização para servir de apoio ao planejamento da operação energética do sistema hidrotérmico brasileiro. O processo de desenvolvimento UML Components é aplicado de forma a nortear o desenvolvimento do software, para englobar as diferentes atividades realizadas nos fluxos de trabalho, além de incluir os vários artefatos produzidos. Como contribuição adicional, paralelamente ao uso dos componentes de software, este trabalho apresenta uma política de operação energética para reservatórios baseada em sistemas de inferência fuzzy Takagi-Sugeno. A política proposta é baseada na otimização da operação energética das usinas hidrelétricas, empregando o modelo de otimização desenvolvido. Com a operação energética otimizada, obtém-se as relações entre a energia armazenada do sistema e o volume útil operativo de cada usina a reservatório. A partir dessas relações são ajustados os parâmetros do modelo Takagi-Sugeno de ordem um. Ao optar-se por um sistema de inferência fuzzy para determinar a política de operação energética de um conjunto de reservatórios, obtém-se uma estratégia de ação/controle que pode ser monitorada e interpretada, inclusive do ponto de vista lingüístico. Outra vantagem na aplicação de sistemas fuzzy deve-se ao fato dos operadores humanos (especialistas) poderem traduzir, de forma consistente, e em termos de regras lingüísticas, o seu processo de tomada de decisões, fazendo com que a ação do sistema fuzzy seja tão fundamentada e consistente quanto a deles. / The operation planning of hydrothermal power systems can be classified as a nonseparable, nonlinear, nonconvex, stochastic and of large scale optimization problem. The complexity of this problem justifies the need for the use of various computational tools with different approaches. This work aims the accomplishment of studies related to the operation planning of hydrothermal power systems through the implementation of software components and fuzzy inference systems. It is intended to provide and implement a development process (UML Components) based on software components for building computational model of optimization and simulation to support the operation planning of the Brazilian hydrothermal power systems. The UML Components development process is a applied in a way to guide the software development to encompass different activities realized on workflows, as well as to include the various artifacts produced. As additional contribution, in parallel to the use of software components, it is intended to present an operational policy of reservoirs based on Takagi-Sugeno fuzzy inference systems. The proposed policy is based on optimization of hydropower operation, using the optimization model developed. Through the optimized operation, relations between system stored energy and the reservoir volume of each plat are obtained. With these relationships, the parameters of the Takagi-Sugeno model are adjusted. In choosing a fuzzy inference system for determining the operational policy of a set of reservoirs, it is obtained as strategy of action/control that can be monitored and interpreted including linguistic standpoint. Another benefit of the fuzzy system application refers to the fact that human specialists can consistently represent, through linguistic rules, their decision making process, making the fuzzy system action as consistent and sound as theirs.
5

Programação diária da operação de sistemas termelétricos utilizando algoritmo genético adaptativo e método de pontos interiores

Menezes, Roberto Felipe Andrade 26 January 2017 (has links)
Fundação de Apoio a Pesquisa e à Inovação Tecnológica do Estado de Sergipe - FAPITEC/SE / The growth of the electric energy consumption in the last years has generated the need of the increase in the amount of power sources, making the electricity sector undergo some large changes. This has provided the search for tools that promotes a better efficiency and security to the electrical power systems. A planning problem that is considered important in the daily operation of the power systems is the Unit Commitment, where the time schedule of the operation is defined, determining which machines will be online or offline, and which are the operating points. Those units must operate by load variation, respecting the operative and security constraints. This research proposes the resolution of the problem for the short-term planning, taking a set of constraints associated with the thermal generation and the power system. Among them, we can highlight the output power variation constraints of the machines and the security restrictions of the transmission system, avoided in most Unit Commitment studies. This problem is nonlinear, mixed-integer and has a large scale. The methodology used involves the utilization of an Adaptive Genetic Algorithm, for the Unit Commitment problem, and the Interior-Point Primal- Dual Predictor–Corrector Method, for DC power flow resolution in economic dispatch problem. Furthemore, this research proposes the implementation of cross-over and mutation operators of Genetic Algorithm based on a ring methodology applied in Unit Commitment matrix. The results were obtained through simulations in a mathematical simulation software, using the IEEE test systems with 30 bus and 9 generators, and another with 24 bus and 26 generators. The validation of the algorithm was done by comparing the results with other works in the literature. / O crescimento do consumo de energia elétrica nos últimos anos vem gerando a necessidade de um aumento na quantidade de fontes geradoras, fazendo com que o setor elétrico passe por grandes mudanças. Isso tem proporcionado a busca por ferramentas que ofereçam maior eficiência e segurança aos sistemas de potência. Um problema considerado de extrema importância na operação diária dos sistemas elétricos é o planejamento da Alocação das Unidades Geradoras, onde define-se a programação horária das unidades do sistema, determinando quais máquinas deverão estar ligadas ou desligadas, e quais serão seus respectivos pontos de operação. Essas unidades geradoras devem operar de forma eficaz, mediante a variação da carga, respeitando restrições operativas e de segurança do sistema. Este trabalho propõe a resolução do problema para o planejamento de curto prazo, levando em consideração uma série de restrições relacionadas a geração térmica e ao sistema elétrico. Entre elas, podemos destacar as restrições de variação de potência de saída das máquinas e as restrições de segurança do sistema de transmissão, evitadas na maioria dos estudos de Alocação de Unidades Geradoras. Este problema tem característica não-linear, inteiro-misto e de grande escala. A metodologia utilizada para resolução do problema envolve a utilização de um Algoritmo Genético Adaptativo, para Alocação das Unidades, e o Método de Pontos Interiores Primal-Dual Preditor-Corretor, para a resolução do Fluxo de Potência Ótimo DC no problema do Despacho Econômico. Além disso, este trabalho propõe a implementação dos operadores de cross-over e mutação do Algoritmo Genético com base em uma metodologia anelar aplicada na matriz de alocação de unidades. Os resultados foram obtidos através de simulações em um software de simulação matemática, utilizando os sistemas testes do IEEE de 30 barras com 9 geradores e 24 barras com 26 geradores, e a validação do algoritmo foi feita comparando os resultados obtidos com os outros trabalhos da literatura.

Page generated in 0.0648 seconds