• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 53
  • 7
  • Tagged with
  • 60
  • 60
  • 16
  • 14
  • 12
  • 12
  • 11
  • 10
  • 9
  • 8
  • 8
  • 8
  • 7
  • 6
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Optimisation de changements de séries par ordonnancement des tâches de réglage

Pessan, Cedric Néron, Emmanuel. January 2008 (has links) (PDF)
Thèse de doctorat : Informatique : Tours : 2008. / Titre provenant de l'écran-titre.
32

Chaînes d'approvisionnement approches stratégique et tactique /

Chauhan, Satyaveer Singh. Proth, Jean-Marie. January 2008 (has links) (PDF)
Reproduction de : Thèse doctorat : Automatique : Metz : 2003. / Titre provenant de l'écran-titre. Notes bibliographiques.
33

Mécanismes de gestion des flots d'éxécution d'exploitation écrit en langage Java

Motsch, Cédric Banâtre, Michel. January 2007 (has links) (PDF)
Thèse doctorat : Informatique : Rennes 1 : 2007. / Bibliogr. p. 183-187.
34

Un système intelligent de planification et d'ordonnancement dédié au contexte d'ingénierie sur commande

Neumann, Anas 05 August 2024 (has links)
Tableau d'honneur de la Faculté des études supérieures et postdoctorales, 2023 / Les activités de planification et d'ordonnancement sont complexes et leur optimisation est cruciale pour les entreprises, particulièrement dans les réalités économiques et industrielles modernes. En effet, la forte concurrence engendrée par la globalisation du marché, l'exigence croissante des consommateurs en termes de qualité et délais, ou encore l'utilisation d'environnements technologiques fortement connectés (Industrie 4.0), motivent les entreprises à améliorer continuellement leurs approches de gestion tactique et opérationnelle (Lasi et al., 2014; Hozdić, 2015; Alcácer and Cruz-Machado, 2019). C'est particulièrement vrai pour les produits d'ingénierie sur demande, ou Engineer-To-Order (ETO). Ces produits sont souvent très complexes en termes de structure, uniques ou non-standards, et sont fabriqués sur la base de besoins incertains et d'une conception incomplète ou vouée à évoluer (Wortmann, 1983, 1992; Mather, 1999; Little et al., 2000; Jünge et al., 2021; Alfnes et al., 2021). Ils conviennent particulièrement bien aux Petites et Moyennes Entreprises (PMEs) qui voient dans ce service de personnalisation un avantage concurrentiel par rapport aux grandes organisations disposant de capacités de production plus importantes (Little et al., 2000; Kusturica et al., 2018; Zennaro et al., 2019). Cependant, la nature incertaine de ces produits rend plus difficile l'évaluation des prix, la prévision des charges et des durées, engendre du gaspillage (d'éléments achetés ou produits avant d'être modifiés ou annulés) et réduit la robustesse des ordonnancements (par nécessité de réordonnancement) (Gutfeld et al., 2014; Hooshmand et al., 2016; Bhalla et al., 2022). Afin de proposer des décisions pertinentes et de prédire avec justesse les résultats qui en découleront, un système d'aide à la décision pour la planification et l'ordonnancement dédié au contexte ETO se doit de tenir compte des spécificités de ses produits et du processus permettant leur réalisation. Par exemple, les projets ETO sont généralement exécutés en ingénierie concurrente : on produit les pièces validées sans attendre la fin de la conception du projet. De plus, contrairement aux activités de production ou d'assemblage, les étapes d'ingénierie et de design peuvent être répétées jusqu'à la validation du client, ne sont exécutées qu'une fois pour différents éléments identiques du projet, sont souvent mesurées en journées, voire semaines, et sont soumises à des règles de précédence différentes. À cet égard, cette thèse s'articule autour de la question de recherche suivante : "Par quels moyens fonctionnels, méthodologiques, technologiques et architecturaux un système d'aide à la décision pour la planification et l'ordonnancement peut-il répondre aux problématiques des PMEs liées à l'approche ETO ?" Les cinq principales problématiques visées étant (i) l'instabilité des plans et ordonnancement construits, (ii) le gaspillage (de temps, de ressources matérielles ou financières) dû aux révisions de la conception, (iii) la difficulté à satisfaire les attentes des clients en termes de coût et délais, (iv) la forte concurrence du marché industriel moderne ou encore (v) la difficulté à prédire la performance des décisions prises. À travers cette thèse, nous répondons à cette question en proposant un système intelligent de planification et d'ordonnancement dédié au contexte ETO. L'objectif étant d'obtenir un système complet et fonctionnel. Ce dernier est composé d'un modèle de données (comportant les décisions clés, les informations nécessaires à la prise de ces décisions, les métriques d'évaluation et les contraintes d'optimisation), de plusieurs modules fonctionnels reposant sur des algorithmes d'optimisation et d'apprentissage novateurs, ainsi que sur une séquence d'interactions entre ces modules pour accomplir les différents cas d'utilisation. Afin d'appréhender de manière réalisable l'atteinte de cet objectif, nous avons réparti les étapes de création du système en sept contributions scientifiques. Tout d'abord, l'architecture est composée de cinq contributions conceptuelles : (i) la conceptualisation et la modélisation mathématique du problème étudié, (ii) la proposition d'une stratégie d'ordonnancement robuste, (iii) la conception d'une méthode heuristique de résolution (algorithme génétique hybride) du problème de planification et d'ordonnancement, (iv) la conception d'une méthode de construction d'une stratégie qui incorpore les décisions de planification et d'ordonnancement dans une stratégie commerciale et prédit son impact sur plusieurs métriques (à l'aide d'un réseau de neurones artificiels), et finalement, (v) l'architecture qui regroupe ces différents éléments. Ces contributions ont été possibles à la suite de différentes analyses et revues de la littérature scientifique. Ces revues ont permis de détecter des manques à combler et de faire des choix quant aux outils et méthodes à exploiter. La nature complexe, stochastique et combinatoire des problèmes rencontrés nous a motivé à opter pour une utilisation combinée de méthodes issues de l'intelligence artificielle (apprentissage automatique, méthodes d'optimisation combinatoire et simulation). Finalement, nous avons développé un prototype de notre architecture sous la forme d'un logiciel de simulation pédagogique et gamifiée. Nos contributions ont tout d'abord été testées unitairement et quantitativement à l'aide de deux types de métriques : leur performance computationnelle (vitesse d'exécution et mémoire utilisée) et la qualité des solutions proposées (déviation de l'optimalité, qualité pratique mesurée à l'aide de scénarios aléatoires d'exécution). Les résultats publiés démontrent ainsi (i) la capacité de nos méthodes à opérer sur des projets de taille réelle et (ii) la qualité des solutions proposées. Ensuite, la réalisation du prototype a permis de tester leur intégration sous la forme d'un système complet et fonctionnel. Ce prototype a par ailleurs été utilisé dans le cadre d'un cours dispensé à l'Université Laval. / Planning and scheduling activities are difficult and significantly impact the performance of manufacturing companies. The latter are therefore forced to constantly search for optimization methods that could help improve their tactical and operational decisions. It is especially true in modern economic and industrial realities characterized by strong competition due to the globalization of the market and growing expectations for quality and short lead times (Lasi et al., 2014; Hozdić, 2015; Alcácer and Cruz-Machado, 2019). Both activities are even more challenging in the Engineer-To-Order (ETO) context. Indeed, ETO products are one-of-a-kind or highly customized and non-standard. They are often composed of a complex structure (BOM/EBOM) and their production is executed based on uncertain needs for features and an incomplete design, intended to evolve over time (Wortmann, 1983, 1992; Mather, 1999; Little et al., 2000; Jünge et al., 2021; Alfnes et al., 2021). The ETO context is very suitable for Small and Medium Enterprises (SMEs) which see this additional service of design and engineering as a competitive advantage over industries with larger production capacities (Little et al., 2000; Kusturica et al., 2018; Zennaro et al., 2019). However, producing a partially unknown product complicates the forecast of costs, workloads, or deadlines (Gutfeld et al., 2014; Hooshmand et al., 2016; Bhalla et al., 2022). ETO projects are also subject to unstable schedules (with frequent rescheduling) and waste of time and resources. To offer appropriate planning and scheduling decisions and precisely forecast their performance, decision support systems dedicated to the ETO context should consider the specificities of typical products and execution processes. For instance, ETO projects are typically executed in concurrent engineering: already validated items are produced without waiting for the complete design of the product. Besides, unlike physical operations (production and assembly), non-physical activities (design and engineering) are repeated until validated by the client; are executed once for several identical items; are measured in days or even weeks; and do not respect the same precedence relations. This thesis intends to answer the following research question: "By what functional, methodological, technological, and architectural means can a decision support system for planning and scheduling address the issues faced by SMEs due to the ETO approach?" The five main issues addressed are (i) the frequent need for rescheduling, (ii) the waste of time and resources (due to items cancellation or modification after their purchase or production), (iii) the difficulty to satisfy the client expectations in terms of cost and lead time, (iv) the strong competition of the modern industrial market, and (v) the inability to forecast the impact of the decisions. Through this thesis, we answer this question by proposing an intelligent planning and scheduling system dedicated to the ETO context. We aim to obtain a complete and operational system. Hence, its architecture is composed of a data model (including the main decisions, the mandatory data to make those decisions, the metrics to evaluate their quality, and the optimization constraints), several business modules based on innovative optimization and learning algorithms, and the sequence of interactions needed to accomplish the different use cases. We then divided the different steps needed to answer the research question into seven achievable scientific contributions. First, the technical components of our architectures represent the five main contributions: (i) a mathematical model representing the studied problem, (ii) a robust planning and scheduling strategy, (iii) a hybrid genetic algorithm able to solve a real-sized instance of the problem, (iv) a prediction model, based on artificial neural networks, to build a complete commercial strategy incorporating the planning and scheduling decisions and forecasting its performance, and (v) the software architecture. Our contributions were possible only after various analyses and literature reviews. Those reviews allowed us to notice gaps regarding our context and make informed choices. To overcome the complex, stochastic, and combinatorial nature of the problems encountered, we opted for a combined use of methods linked to Artificial Intelligence (heuristic optimization, machine learning, and simulation). Finally, we implemented a prototype of our system as a gamified software dedicated to learning purposes. We first tested our contributions separately (unit tests) using two types of quantitative metrics: the computational performance (computing time and memory used) and the quality of the proposed solutions (deviation, impact of randomly generated scenarios). The results highlighted the capacity of our methods to solve realistic instances and the impact of our planning and scheduling strategy. Then, our prototype of implementation allowed us to validate their viable integration as a complete system. Our prototype has also been tested and used as part of a course given at Université Laval.
35

Ordonnancement disjonctif avec temps de mises en route : application dans le milieu agroalimentaire

Blais, Nicolas 09 April 2024 (has links)
Titre de l'écran-titre (visionné le 21 mars 2024) / L'ordonnancement en milieu agroalimentaire est complexe. En effet, les planificateurs doivent prendre en compte de nombreuses contraintes comme les allergènes, la disponibilité des ingrédients et de la main-d'oeuvre. Ceci devient rapidement une tâche complexe, surtout quand les horaires de production doivent être refaits à la moindre perturbation (nouvelle commande, retard dans l'arrivée des matières premières, etc.). C'est pourquoi il est naturel de faciliter la tâche de ceux-ci grâce à des outils d'aide à la décision comme des modèles d'optimisation. Les problèmes d'ordonnancement de la production sont étudiés depuis longtemps dans la littérature scientifique. Plus récemment, *Ku et Beck* ont démontré le potentiel du paradigme de la programmation par contraintes sur le problème d'ordonnancement d'atelier (*Job-shop Scheduling Problem*). Ceci et le fait que très peu d'articles combinent l'utilisation de la programmation par contraintes aux problèmes d'ordonnancement dans le milieu agroalimentaire ont motivé ces travaux de recherche. Dans ce mémoire, l'utilisation de la programmation par contraintes sur des problèmes d'ordonnancement tirés de l'entreprise *Biscuits Leclerc* a été étudiée. Également, d'autres techniques d'optimisation comme la recherche locale à voisinage large ont été utilisées. Les contributions de la recherche sont autant au niveau scientifique en remplissant un trou existant dans la littérature qu'au niveau industriel en résolvant un problème auquel fait face *Biscuits Leclerc* quotidiennement. / The scheduling in the food industry is complex. Indeed, planners must take into account many constraints such as the presence of allergens, the availability of ingredients, and employees. This quickly becomes a complex task, especially when production schedules have to be redone at the slightest disruption (new orders, delays in the arrival of raw materials, etc.). This is why it is natural to make their task easier with the help of decision support tools such as optimization models. Production scheduling problems have been studied for a long time in the scientific literature. More recently, *Ku and Beck* demonstrated the potential of the constraint programming paradigm on the Job-shop Scheduling Problem. This and the fact that very few articles combine the use of constraint programming with scheduling problems in the food industry have motivated the current research work. In this master thesis, the use of constraint programming on scheduling problems taken from the company *Biscuits Leclerc* have been studied. Also, other optimization techniques such as Large Neighborhood Search were used. The contributions of the research are as much at the scientific level by filling an existing gap in the literature as at the industrial level by solving a problem that *Biscuits Leclerc* faces in their everyday life.
36

Ordonnancements périodiques dans les réseaux de processus : Application à la conception insensible aux latences

Millo, Jean-Vivien 15 December 2008 (has links) (PDF)
Du fait de la miniaturisation grandissante des circuits électroniques, la conception de système sur puce actuelle, se heurte au problème des latences sur les fils d'interconnexions traversant tout le circuit. Un système sur puce est un ensemble de blocs de calculs (les composants IP) qui s'échangent des données. Alors que la communication à l'intérieur de ces blocs de calculs peut toujours se faire de manière synchrone, c'est à dire s'abstraire comme une action instantanée, la communication d'un bloc de calculs à un autre prend un temps qui n'est pas négligeable. Il s'écoule plusieurs cycles d'horloge entre l'émission d'une donnée sur un fil d'interconnexion et sa réception. La théorie du Latency Insensitive Design créée par Luca Carloni et Alberto Sangiovanni-Vincentelli permet entre autre de résoudre ce problème en implantant un protocole de communication basé sur la segmentation des fils d'interconnexions et sur le principe de rétroaction en cas d'embouteillage. Dans un premier temps, nous avons donné un fondement théorique à cette théorie en la rapprochant formellement d'une modélisation par Marked/Event graph (Sous ensemble sans conflit des Réseaux de Pétri) et avec des places de capacité ; ce qui génère naturellement le protocole de contrôle de flux. Cette modélisation nous amène à la problématique principale de cet ouvrage: comment, et sous quelles conditions, peut on minimiser la taille des ressources de mémorisation utilisées comme tampons intermédiaires au long de ces fils d'interconnexions? Car leur nombre et leur position peuvent se révéler critique à l'implantation matérielle. Nous allons ensuite étudier cette question sous une hypothèse naturelle de déterminisme, ce qui permet d'obtenir des régimes de fonctionnement périodiques et réguliers. Le but de cette thèse est de modifier le protocole mis en place dans la théorie du Latency Insensitive Design en prenant en compte cette hypothèse. L'étude des systèmes déterministes et des résultats existant nous a permis une première phase de modification appelée: égalisation. L'étape suivante consiste à ordonnancer statiquement ces systèmes. Pour cela, nous avons choisi de représenter explicitement l'ordonnancement de chacun des éléments du système comme un mot binaire périodique où les "1" représentent les instants d'activités et les "0" d'inactivités tel que M. Pouzet et al. l'ont introduit dans le "N-synchronous Kahn network". Une étude approfondie des différentes classes de mots binaires existants (mot de Sturm, de Christoffel, de Lyndon ou encore mécaniques) a précédé leur association à la théorie du Latency Insensitive Design et au processus d'égalisation pour obtenir des systèmes déterministes ordonnancés statiquement.
37

Modèle et algorithme d'ordonnancement pour architectures reconfigurables dynamiquement

Benkermi, Imène Sentieys, Olivier. January 2007 (has links) (PDF)
Thèse doctorat : Traitement du signal et télécommunications : Rennes 1 : 2007. / Bibliogr. p. 129-134.
38

Techniques d'ordonnancement et algorithmique parallèle en algèbre linéaire

Marrakchi, Mounir Robert, Yves. January 2008 (has links)
Reproduction de : Thèse de doctorat : informatique : Grenoble, INPG : 1988. / Titre provenant de l'écran-titre. Bibliogr. p. 171-175.
39

Calcul haute performance sur matériel générique

Perotin, Matthieu Martineau, Patrick. January 2008 (has links) (PDF)
Thèse de doctorat : Informatique : Tours : 2008. / Titre provenant de l'écran-titre.
40

Conception d'algorithmes coopératifs pour l'optimisation multi-objectif application aux problèmes d'ordonnancement de type flow-shop /

Basseur, Matthieu Talbi, El-Ghazali January 2007 (has links)
Reproduction de : Thèse de doctorat : Informatique : Lille 1 : 2005. / N° d'ordre (Lille 1) : 3633. Résumé en français et en anglais. Titre provenant de la page de titre du document numérisé. Bibliogr. p. [185]-199.

Page generated in 0.1413 seconds