• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Processos de licenciamento de pólos geradores de viagens: o estudo de caso do Recife-PE

MORAES, Eloisa Basto Amorim de 31 January 2008 (has links)
Made available in DSpace on 2014-06-12T17:35:15Z (GMT). No. of bitstreams: 2 arquivo2204_1.pdf: 2245942 bytes, checksum: df0b37ff2780747f33cf10015d9e5bc6 (MD5) license.txt: 1748 bytes, checksum: 8a4605be74aa9ea9d79846c1fba20a33 (MD5) Previous issue date: 2008 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / O objeto de estudo dessa dissertação são os processos de licenciamento de Pólos Geradores de Viagens PGVs.. São enfocados os aspectos legais e técnicos que os analistas dispõem atualmente para emitir os pareceres técnicos na aprovação e licenciamento de empreendimentos considerados de impacto principalmente a análise visando a atração e geração de viagens. Considerado um processo administrativo, os licenciamentos de PGVs devem obedecer os princípios fundamentais da legalidade, da impessoalidade, da moralidade da publicidade e da eficiência (Brasil, 1988). Este trabalho se propõe a contribuir com o processo administrativo municipal de licenciamento de PGVs diante da diversidade de empreendimentos que podem ser classificados como PGVs, da crescente demanda de processos de licenciamento nas instâncias municipais competentes e na observação direta de atividades que se instalam sem que aparentemente essas medidas mínimas sejam cumpridas.A pesquisa empírica foi baseada no estudo de caso de licenciamento de PGVs em Recife-PE. Para coleta de dados foram utilizados os instrumentos de entrevistas e questionários bem como colhidas informações em documentos oficiais, legislação aplicada e em registros de tramitação de processos de empreendimentos de impacto.Os resultados apontam que apesar da legislação ser criteriosa e detalhada a mesma não encontra respaldo técnico e organizacional por parte do órgão gestor para sua aplicação. Não há instrução de procedimentos administrativos nem rotinas pré-estabelecidas para análise do processo, sendo os mesmos adotados pelos técnicos, por experiência própria Não foi verificado ainda o estabelecimento de prazo para tramitação de processos de análise especial de PGV. Não existe instrumento de acompanhamento após a implantação do empreendimento
2

Impact of Cascading Failures on Performance Assessment of Civil Infrastructure Systems

Adachi, Takao 05 March 2007 (has links)
Water distribution systems, electrical power transmission systems, and other civil infrastructure systems are essential to the smooth and stable operation of regional economies. Since the functions of such infrastructure systems often are inter-dependent, the systems sometimes suffer unforeseen functional disruptions. For example, the widespread power outage due to the malfunction of an electric power substation, which occurred in the northeastern United States and parts of Canada in August 2003, interrupted the supply of water to several communities, leading to inconvenience and economic losses. The sequence of such failures leading to widespread outages is referred to as a cascading failure. Assessing the vulnerability of communities to natural and man-made hazards should take the possibility of such failures into account. In seismic risk assessment, the risk to a facility or a building is generally specified by one of two basic approaches: through a probabilistic seismic hazard analysis (PSHA) and a stipulated scenario earthquake (SE). A PSHA has been widely accepted as a basis for design and evaluation of individual buildings, bridges and other facilities. However, the vulnerability assessment of distributed infrastructure facilities requires a model of spatial intensity of earthquake ground motion. Since the ground motions from a PSHA represent an aggregation of earthquakes, they cannot model the spatial variation in intensity. On the other hand, when a SE-based analysis is used, the spatial correlation of seismic intensities must be properly evaluated. This study presents a new methodology for evaluating the functionality of an infrastructure system situated in a region of moderate seismicity considering functional interactions among the systems in the network, cascading failure, and spatial correlation of ground motion. The functional interactions among facilities in the systems are modeled by fault trees, and the impact of cascading failures on serviceability of a networked system is computed by a procedure from the field of operations research known as a shortest path algorithm. The upper and lower bound solutions to spatial correlation of seismic intensities over a region are obtained.

Page generated in 0.0202 seconds