• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 12
  • Tagged with
  • 12
  • 12
  • 6
  • 5
  • 5
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Propuesta de gestión de proyecto basado en la guía PMBOK para mejorar la ejecución de carretera de acceso en proyecto minero, Antamina – 2021

Rodriguez Montañez, Patricia Jacqueline, Montalvo Soto, Yuler Yerry 16 January 2021 (has links)
La presente tesis, tiene como objetivo una propuesta de gestión de proyecto basado en la guía PMBOK para mejorar la ejecución de carretera de acceso de un proyecto minero en Ancash el 2021 mediante la planificación y control del alcance, cronograma y costo. El tipo de investigación fue de tipo cuantitativa, con un diseño de investigación no experimental explicativa, el cual buscó analizar las variables tanto dependiente como independiente y determinar si una afecta a la otra. La muestra de estudio está constituida por la gestión del proyecto de tres áreas (Gestión del alcance, Gestión del cronograma, Gestión del costo) en la obra en ejecución de la unidad minera Antamina durante el año 2021. La investigación utilizó la guía PMBOK lo cual brindó los lineamientos y guías para identificar las características y formatos necesarios para el proyecto. Asimismo, se realizó la estructura de composición de la investigación teniendo en cuenta las actividades involucradas, su secuencia, facilidad constructiva, el costo, disponibilidad y uso de los insumos (materiales, equipos, herramientas, mano de obra), así como la disponibilidad de mano de obra operativa y los rendimientos. Durante la metodología utilizada se utilizó la recolección de información durante las primeras 36 semanas iniciales del proyecto, obteniendo información vigente del alcance del proyecto, el desempeño del cronograma, del desempeño del costo y del avance de la ejecución de la obra. Es por ello, que se utilizó el reporte del control de rendimiento de horas máquinas, horas hombres y control de costos. Posteriormente, la información obtenida fue procesada empleando los softwares Microsoft Excel, Microsoft Project y AutoCAD e interpretada para obtener la medición de la eficiencia de la gestión y así lograr los resultados necesarios para proponer la aplicación de las guías del PMBOK en el proyecto. Finalmente, luego de analizar, interpretar, definir la información base e información procesada en base a la propuesta, se presentaron los resultados, conclusiones y recomendaciones de acuerdo a la información obtenida en la investigación. / The objective of this thesis is a project management proposal based on the PMBOK guide to improve the execution of the access road of a mining project in Ancash in 2021 through the planning and control of the scope, schedule, and cost. The type of research was quantitative, with an explanatory non-experimental research design, which sought to analyze both dependent and independent variables and determine if one affects the other. The study sample is constituted by the project management of three areas (Scope Management, Schedule Management, Cost Management) in the works in execution of the Antamina mining unit during the year 2021. The research improved the PMBOK guide, which provided the guidelines and guidelines to identify the characteristics and formats necessary for the project. Likewise, the composition structure of the research was carried out taking into account the activities involved, their sequence, constructive ease, the cost, availability, and use of inputs (materials, equipment, tools), as well as the availability of hand of operational work and yields. During the methodology used, the collection of during the first 36 initial weeks of the project was shown, the information was obtained current on the scope of the project, the performance of the schedule, the performance of the cost and the progress of the execution of the works. That is why the performance control report of machine hours, man hours and cost control was obtained. Subsequently, the information obtained was processed using Microsoft Excel, Microsoft Project and AutoCAD software and interpreted to obtain the measurement of management efficiency and thus achieve the necessary results to propose the application of the PMBOK guidelines in the project. Finally, after analyzing, interpreting, defining the base information and processed information based on the proposal, the results, conclusions, and recommendations were presented according to the information obtained in the investigation. / Tesis
12

Propuesta de mejora del proceso de planificación de proyectos en una empresa de construcción con sistema drywall

Rosario Mabel, Andía Cabrera 10 December 2018 (has links)
La presente tesis es una “Propuesta de mejora del proceso de planificación de proyectos en una empresa de construcción con sistema drywall” desarrollada en una PYME del rubro construcción. La propuesta está basada en herramientas de ingeniería para contrarrestar el problema identificado en la empresa en estudio que es la demora en la entrega de proyectos de construcción. Para ello, en la presente tesis está estructurada en 6 capítulos. En el capítulo 1 se presenta el Marco teórico, en el cual se define el sistema constructivo drywall, metodologías y herramientas de mejora aplicables al proceso de planificación de proyectos de construcción y a la reducción y/o eliminación de demora en la entrega al cliente. En el capítulo 2 se presenta el diagnóstico, en el cual se describe la empresa, las condiciones en las que opera, el problema, los procesos involucrados con el problema, causas raíces, impacto económico y las herramientas aplicables a la reducción y/o eliminación del problema. En el capítulo 3 se desarrolla la evaluación de alternativas de solución, en el cual se describe el plan de implementación de las herramientas 5S y Last Planner System. En el capítulo 4 se muestra la validación de la propuesta de mejora compuesta por juicio experto y la validación económica. En el capítulo 5, se muestra el impacto de la mejora en los stakeholders mediante una matriz Leopold. Finalmente, en el capítulo 6 se muestran las conclusiones y recomendaciones de la presente tesis. / This thesis is a "Proposal for improvement of the project planning process in a construction company with gypsum panel system" developed in an SME of the construction sector. The proposal is based on engineering tools to counteract the problem in the company in the study that is the delay in the delivery of construction projects. For this, in this thesis is structured in 6 chapters. Chapter 1 presents the theoretical framework, which defines the construction system of drywall, methodologies and tools to improve the planning process of construction projects and the reduction and / or elimination of the delay in delivery to the client. In chapter 2 the diagnosis is presented, in which the company is described, the conditions in which it operates, the problem, the processes related to the problem, the root causes, the economic impact and the tools applicable to the reduction and / or the elimination of the problem. Chapter 3 describes the evaluation of solution alternatives, and describes the implementation plan of the 5S and Last Planner System tools. Chapter 4 shows the validation of the improvement proposal composed of expert judgment and economic validation. In Chapter 5, the impact of the improvement on stakeholders is shown through a Leopold matrix. Finally, chapter 6 shows the conclusions and recommendations of this thesis. / Tesis

Page generated in 0.0712 seconds