• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 3
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Controle e Otimização de Planta de Micro-cogeração a Gás Natural Para a Produção de Gesso

Costa, José Ângelo Peixoto da 02 1900 (has links)
Submitted by Eduarda Figueiredo (eduarda.ffigueiredo@ufpe.br) on 2015-03-10T12:59:15Z No. of bitstreams: 2 TESE FINAL 02122013.pdf: 5675809 bytes, checksum: 1c382c84dbe1c048e487d0da5e505be8 (MD5) license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5) / Made available in DSpace on 2015-03-10T12:59:16Z (GMT). No. of bitstreams: 2 TESE FINAL 02122013.pdf: 5675809 bytes, checksum: 1c382c84dbe1c048e487d0da5e505be8 (MD5) license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5) Previous issue date: 2012-02 / Professor Charamba / Neste trabalho foi estudado um sistema de micro-cogeração a gás natural para utilização no pólo gesseiro do Araripe, Pernambuco, Brasil. Para análise de desempenho do sistema foi utilizada uma planta de micro-cogeração do Laboratório COGENCASA do departamento de engenharia mecânica da UFPE. Na análise testou-se o sistema para potências da turbina a gás de 10 , 15 , 20 e 23kW em conjunto com um recuperador de calor. Com estes resultados experimentais modelou-se a turbina a gás por meio da identificação do sistema, gerando um modelo dinâmico do equipamento. Para o recuperador de calor utilizou-se a modelagem fenomenológica aplicada à função de transferência para gerar o modelo dinâmico do recuperador. Foram feitos testes de carga nos modelos, aplicados a um controlador preditivo (MPC), onde se procedeu ao projeto, análise de parâmetros e estabilidade do controlador. De posse destes resultados foram feitas análises energéticas e exergéticas da planta aplicada a um estudo de caso envolvendo uma fábrica calcinadora de gesso da região. O estudo mostra que a viabilidade do sistema está atrelada ao preço do gás natural praticado para a região do Araripe. A introdução de técnicas modernas de controle e análise termoeconômica traria uma redução de consumo de energia de 23% em relação aos sistemas tradicionais, o que, aliado aos benefícios ambientais, torna a cogeração um sistema atrativo para o polo gesseiro do Araripe.
2

Impactos da implantação da ferrovia Transnordestina no polo gesseiro do Araripe: cenário e perspectivas dos stakeholders regionais

SANTOS, João José dos 16 April 2015 (has links)
Submitted by Isaac Francisco de Souza Dias (isaac.souzadias@ufpe.br) on 2016-01-20T17:32:04Z No. of bitstreams: 2 license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5) CD1_IMPACTOS DA FERROVIA TRANSNORDESTINA_sem assinaturas.pdf: 3353431 bytes, checksum: 099bfb5335b2937b2f80cba0774566a5 (MD5) / Made available in DSpace on 2016-01-20T17:32:04Z (GMT). No. of bitstreams: 2 license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5) CD1_IMPACTOS DA FERROVIA TRANSNORDESTINA_sem assinaturas.pdf: 3353431 bytes, checksum: 099bfb5335b2937b2f80cba0774566a5 (MD5) Previous issue date: 2015-04-16 / O Polo Gesseiro do Araripe (PGA) é um importante polo econômico nordestino que, apesar de ser o maior produtor nacional de gipsita e gesso, enfrenta problemas que impedem o seu potencial de desenvolvimento. O mais relevante destes problemas é a situação do transporte da sua produção para os mercados consumidores de insumos e de produtos acabados. Este trabalho procurou detectar os possíveis impactos que a Ferrovia Transnordestina poderá provocar no polo gesseiro; também investigou o que os atores locais esperam dela e como eles estão se preparando para a sua chegada. O trabalho efetuou um levantamento das expectativas dos stakeholders envolvidos direta ou indiretamente com a cadeia produtiva do gesso. Os stakeholders que formaram o universo desta pesquisa foram: especialistas da área de transportes e economia, empresários e a sociedade civil dos municípios do polo. Na análise foi utilizado o método estatístico descritivo e inferencial, cujos resultados possibilitaram sugerir aos stakeholders um processo de planejamento e o desenvolvimento de atividades econômicas no polo, bem como a adoção de estratégias que possam aproveitar melhor as oportunidades e se defender das ameaças ou dos riscos do projeto. Constatou-se que as teorias econômicas apresentadas no trabalho se aplicaram à situação do polo. O trabalho conclui com a apresentação dos possíveis impactos e suas externalidades provocadas pela implantação da Ferrovia Transnordestina no Polo Gesseiro e na região sob a visão dos stakeholders estabelecidos. Finalizando, sugerem-se recomendações que auxiliem no planejamento estratégico direcionado ao desenvolvimento econômico da região do PGA. / The Plaster Pole Region of Araripe (Polo Gesseiro do Araripe - PGA) is an important northeastern economic hub region which, although being the greatest national producer of crude gypsum and plaster, has faced problems that hinder its development potential. The most significant of these problems is the state of the production transport for the inputs and finished products to the consuming markets. This research tried to detect the possible impacts that the Transnordestina Railroad will possibly cause in the plaster pole region, as well as it investigated what the region players expect out of it and how they are getting ready for the railroad arrival. The research effected a survey on the expectations of the - directly or indirectly - involved stakeholders with the plasters' productive chain. The stakeholders that formed the universe of this research were: local specialists in transport and economy, entrepreneurs and the civil society of the cities in the pole region. In the analysis it was used the descriptive and inferential statistics method, whose findings made it possible to suggest to stakeholders a planning process and the development of economic activities in the pole region. It suggests also the adoption of strategies that can make a better use of opportunities, as well how to protect against the threats or the risks of the project. As a result, it was evidenced that the presented economic theories in the work all applied to the pole region situation. The work concludes with the presentation of the possible impacts and its externalities provoked by the implantation of the Transnordestina Railroad in the plaster pole region through the established vision of stakeholders. Finally, recommendations are made to help the strategical planning for economic development of the plaster pole region of Araripe (PGA).
3

Análise comparativa dos benefícios econômicos, operacionais e ambientais do método Terrace Mining na mineração de gipsita do polo gesseiro do Araripe

ROCHA, Suelen Silva 28 June 2017 (has links)
Submitted by Pedro Barros (pedro.silvabarros@ufpe.br) on 2018-09-21T19:54:22Z No. of bitstreams: 2 license_rdf: 811 bytes, checksum: e39d27027a6cc9cb039ad269a5db8e34 (MD5) DISSERTAÇÃO Suellen Silva Rocha.pdf: 5514505 bytes, checksum: 518b51f3c46e20d096651557249da709 (MD5) / Approved for entry into archive by Alice Araujo (alice.caraujo@ufpe.br) on 2018-09-24T21:27:21Z (GMT) No. of bitstreams: 2 license_rdf: 811 bytes, checksum: e39d27027a6cc9cb039ad269a5db8e34 (MD5) DISSERTAÇÃO Suellen Silva Rocha.pdf: 5514505 bytes, checksum: 518b51f3c46e20d096651557249da709 (MD5) / Made available in DSpace on 2018-09-24T21:27:21Z (GMT). No. of bitstreams: 2 license_rdf: 811 bytes, checksum: e39d27027a6cc9cb039ad269a5db8e34 (MD5) DISSERTAÇÃO Suellen Silva Rocha.pdf: 5514505 bytes, checksum: 518b51f3c46e20d096651557249da709 (MD5) Previous issue date: 2017-06-28 / CAPES / O método de lavra deve ser selecionado de modo a produzir condições adequadas para a execução das operações e ser flexível à infraestrutura disponível, permitindo atingir uma produtividade máxima ao menor custo unitário de produção, e visando à sustentabilidade. No Polo Gesseiro do Araripe, na maioria dos depósitos aplica-se o método de lavra Open Pit Mining por bancadas múltiplas face ao modo de ocorrência das jazidas de gipsita e de suas características geomorfológicas. Este método de lavra caracteriza-se por movimentar grandes volumes de material estéril para as pilhas de “bota-fora”, localizadas fora do pit, o que implica em altos custos operacionais devido às grandes distâncias percorridas para deposição do material, além de significativos impactos ambientais. Devido a este fato, na Mina Ponta da Serra no Polo Gesseiro do Araripe, tal método foi substituído pelo Terrace Mining com o objetivo de otimizar as operações de explotação de gipsita e minimizar estes impactos ambientais. Neste contexto, este estudo tem por objetivos demonstrar os benefícios operacionais, econômicos e ambientais ocorridos com a mudança do método de lavra do tipo Open Pit para o método Terrace Mining na lavra de gipsita da Mina Ponta da Serra da empresa Royal Gipso Ltda., no Polo Gesseiro do Araripe de modo a construir uma análise comparativa entre os mesmos na explotação da gipsita. A metodologia consistiu em realizar levantamentos de dados bibliográficos da mineração de gipsita no Brasil, dos custos operacionais, e também o levantamento de aspectos ambientais relacionados ao desenvolvimento dos dois métodos, numa abordagem econômica e operacional. Os resultados demonstraram que a alteração do método de lavra proporcionou uma otimização nas operações da mina, redução dos custos com as operações unitárias e minimização dos impactos ambientais no que diz respeito ao impacto visual, uma vez que o princípio de operação do Terrace Mining permite a concomitância de execução das atividades de extração e recuperação da área degradada, e também por não haver a necessidade de mais custos com a implantação de bota-foras afastados das frentes de lavra. Concluiu-se, então, que a adoção de técnicas que contemplam as características do jazimento, permitindo um melhor e mais econômico controle operacional, e o prezar por políticas ambientalmente mais corretas apontam para o contexto sustentável que a atividade se direciona. / The mining method must be selected in order to produce adequate conditions for the execution of the operations and be flexible to the available infrastructure, allowing to achieve maximum productivity at the lowest unit cost of production and aiming at sustainability. In the Gypsum Pole of Araripe, in most of the deposits, the Open Pit Mining method is applied by multiple benches in relation to the mode of occurrence of the gypsum deposits and their geomorphological characteristics. This mining method is characterized by moving large volumes of sterile material to the "outside dump" piles, located outside the pit, which implies high operational costs due to the long distances traveled for material deposition, besides significant environmental impacts. Due to this fact, at the Ponta da Serra Mine at the Gypsum Pole of Araripe, this method was substituted by Terrace Mining with the objective of optimizing gypsum exploitation operations and minimizing these environmental impacts. In this context, this study aims to demonstrate the operational, economic and environmental benefits of changing the Open Pit method for the Terrace Mining method in the gypsum mining of the Royal Gipso Ltda. in the Gypsum Pole of Araripe in order to construct a comparative analysis between them in the exploitation of the gypsum. The methodology consisted in collecting bibliographical data of the gypsum mining in Brazil, of the operational costs, as well as the survey of environmental aspects related to the development of the two methods, in order to construct a comparative analysis between them in the exploitation of the gypsum addressing environmental, operational and economic aspects. The results demonstrate that the alteration of the mining method provided an optimization in the mine operations, reduction of the costs with the unit operations and minimization of the environmental impacts with respect to the visual impact with the restitution of the sterile material in the, since the operating principle of Terrace Mining allows the concomitance of execution of the activities of extraction and recovery of the degraded area, and also because there is no need for more costs with the implantation of outside dumps far from the mining fronts. It is concluded that the adoption of techniques that consider the characteristics of the area, allowing a better and more economic control, and the appreciation of environmentally correct policies, point to the eco-sustainable context that the activity is directed to.

Page generated in 0.046 seconds