• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Optimized model for pre-cut blasting in mining operations in underground mining in Peru

Pomasoncco, Alexander, Trujillo, Claudio, Arauzo, Luis, Raymundo, Carlos 01 January 2019 (has links)
El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado. / In the mining industry of Peru, as a consequence of large scale mineral extraction and a dynamic process of ore dressing, the different activities of the operation are neglected. This neglect, in some cases, generates collateral damages that affect the structures, generate extra costs, and result in constant accidents due to rock-fall and delays in the activities of the mining cycle and the ones following it, which seriously harms the Mining Unit and directly affects the workers. In addition, this is directly related to the progress of the daily work and, in turn, it is related to the design of the mine mesh that is prepared to extract the largest possible mineral amounts per shift. This means that, by modifying the design of the mine mesh, the blasting method, and the type of explosive used, the current scenario and the results could be modified. In this respect, a research was conducted, exclusively based on simulations using the JK Simblast software, applying the pre-splitting blast method in the underground mine of the Minera Aurífera Retamas SA company, resulting in a reduction of over break in more than 60% as compared to the mesh used initially. This has an impact on the level of support to be used, and therefore, on the maintenance costs, which were reduced by 18%. Therefore, this article presents the possibility of reducing maintenance costs in underground mining using pre-splitting blasting. Copyright 2019.

Page generated in 0.0726 seconds