Spelling suggestions: "subject:"prefabricated"" "subject:"refabricated""
291 |
Montovaná konstrukce haly / Assembled structure of hallBartosch, Václav January 2017 (has links)
Master´s thesis describes the design and static calculating of selected elements of prefabricated reinforced concrete hall with bulit-in office, elaboration of basic drawings of the project documentation, shape and reinforcemenet drawings of these selected structural prefabricated elements. The work also includes technical report, details of selected element´s contacts, drawing of plates and study of the behavior of reinforced buildings. Calculation was performed by using a computer program AxisVm, Microsoft Excel a IDEA StatiCa
|
292 |
Polyfunkční dům Bystřice pod Hostýnem / Multipurpose facility Bystřice pod HostýnemNovosad, Jiří January 2017 (has links)
The aim of this diploma thesis is to project a polyfunctional building including a gym, fitness centre, bar and apartments. The plan is conducted in the form of project documentation, containing all the problems related with this issue. The building is located in the town, Bystřice pod Hostýnem. Considering the functionality, the construction is divided into two parts – southern and northern part. The south of the building is designated for accomodation situated on four floors. The north one, including three floors, is intended for the gym, fitness centre and bar. The terrain of building site slopes down to south-east. The construction will be built of prefabricated reinforced concrete frame construction RIEDER with block filling YTONG containing contact insulation system. The building is constructed with two flat single-shell roofs. This project is primarily focused on functional, disposal and architectural aspect os polyfunctional house.
|
293 |
Tribuna fotbalového stadionu / Tribune of football stadiumWeber, Jozef January 2017 (has links)
The aim of the diploma thesis was to design the precast reinforced concrete prefabricated structures of the football tribune. It was modernized sports center in Brno. According to the investor was determined the shape of the football tribune. It was compiled the design documentation. For the calculation of inner strengths was used the software Dlubal RFEM, which operates on the Finite Element Method - FEM. All elements have been designed for ultimate and serviceability limit state. My thesis contains textual part, inner strengths, static calculations, drawing documentation of composition of structure, drawing documentation of reinforcement and design documentation of the object.
|
294 |
Stavebně technologický projekt výrobní a skladovací haly / Construction-technological project of production and storage hallMarek, Jiří January 2022 (has links)
This diploma thesis deals with construction-technological project of production and storage hall in Hradec Králové. The thesis deals with complex of the implementation of the construction and focuses in more detail on the implementation of both foundation structures and assembly of the steel frame. The project includes a technical report on the construction technology project, a study of the implementation of the main technological stages of the main building, design and assessment of construction routes, construction equipment project, financial and construction schedule, machine design, schedule and budget of the main building, control and test plan for foundation structures, and occupational safety and health.
|
295 |
Stavebně technologický projekt výrobní a skladovací haly ve Vlkoši u Kyjova / Construction technological project of the production and storage hall in Vlkoš u KyjovaProkop, Petr January 2022 (has links)
The aim of this diploma thesis is to create a construction-technological project of the production and storage hall Ahorn CZ, s.r.o. As part of this work, technical report, study of the implementation of the main technological stages, project of the construction site equipment, time and financial plan of the construction, design of the main construction machines and mechanisms, item budget and time schedule were prepared. Further the thesis contains two technological regulations and two control and test plans.
|
296 |
Průmyslový areál AQUASYS - stavebně technologický projekt / Industrial comlex AQUASYS - construction and technological projectJuračka, Lukáš January 2012 (has links)
This Master’s thesis deals with the technological project of building an industrial complex AQUASYS in Žďár nad Sázavou. This work includes technical reports ZS and STP, site equipment, wider transport relations, budget calculation, time planning, inspection and test plan, mechanical assembly, contract for work and job security for this building.
|
297 |
Tělocvična Třebíč - vybraná část STP / GYM Třebíč-SELECTED PARTS OF THE CTPRusínová, Alena January 2012 (has links)
The tesis is focused on building a new elementary school gym Třebíč, Horka-Domky, Václavské nám. 44/12. In addition to the new building itself is considered a gym and the construction of the connecting neck between the existing elementary school building andnew construction including reconstruction of the gym space newly connected corridor. Solves problems of selected parts of the building and technological project, which are: technical report, coordination situation, the financial plan of the building, site equipment oftechnological stages, a stage of construction schedule and itemized, use machines, technological regulations mounted skeleton and sports flooring, inspection and test plan, budget construction and plan for safety and health at work.
|
298 |
Technologický projekt sportovní haly v obci Nové Veselí / Technological project of a sports hall in Nové Veselí villageVaněk, Jiří January 2012 (has links)
This Master's thesis deals with the technological project of sports hall in New Veseli . This work includes the construction and technological equipment for the study site , ZOV , technological regulations, building equipment, wider transport relations, budget calculation , time planning , inspection and test plan , design mechanisms , job security this building , balance resources.
|
299 |
Skladovací hala č. 2 v Rousínově - stavebně technologický projekt / Storage hall No. 2 in Rousínov - construction-technological projectGottvaldová, Denisa Unknown Date (has links)
The subject of my diploma thesis is a construction-technological solution for realization of a storage hall in Rousínov. The work deals with a time and financial plan for all buildings of the project Storage Hall, Rousínov. A technical report, a study of the implementation of the construction’s individual stages, a design and assessment of transport routes, a design of the construction site equipment and a design of the machinery were prepared for the building No. 2. An itemized budget with a statement of acreage and construction schedule was prepared. A technological regulation and a control and test plan were prepared for the implementation process of the wire-reinforced concrete industrial floor. Within the diploma thesis, a technological regulation for the implementation of a reinforced concrete retaining wall was prepared. Noise pollution caused by the construction site was examined and evaluated in a noise study. The environmental requirements for the storage hall building No. 2 were processed.
|
300 |
Stavebně technologický projekt domu s pečovatelskou službou Ždírec nad Doubravou / Construction technology project of a nursing home Ždírec nad DoubravouSoukupová, Daniela Unknown Date (has links)
The diploma thesis deals with the construction of a new nursing home in Ždírec nad Doubravou. It is a four-storey prefabricated structure, where on the first floor there are three surgeries for doctors and on the remaining three floors there are apartments for clients of the building. In hhe work is a implementation study of the main technological stages, assessment of the transport solution, time and financial plan together with the calculation of the main building according to THU. The equipment of the construction site with drawings and design of the main machines and mechanisms is also solved. For selected technological processes, an itemized budget with statement of quantities, time schedule and technological precription for the assembly of prefabricated ceiling elements together with a control and test plan. In the last points, the technological precription for the floors of the clean zone of medical surgeries is solved with a proposal of measures according to the LEED 2009 certification and a noise study.
|
Page generated in 0.0534 seconds