• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 140
  • 72
  • 42
  • 26
  • 8
  • 7
  • 6
  • 6
  • 6
  • 6
  • 6
  • 6
  • 5
  • 2
  • 2
  • Tagged with
  • 326
  • 113
  • 112
  • 108
  • 60
  • 56
  • 51
  • 50
  • 49
  • 47
  • 46
  • 45
  • 44
  • 44
  • 43
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
311

Vybrané části stavebně technologického projektu fotbalové tribuny Androva stadionu v Olomouci / Selected Parts of Building and Technological Project for Football Tribune of Ander Stadium in Olomouc

Garláthy, Michal January 2013 (has links)
The theme of this diploma thesis are the Selected Parts of Building and Technological Project for Football Tribune of Ander Stadium in Olomouc. The content of this diploma thesis is the technological process of assembly of the building bearing construction of prefabricated concrete elements, the budget, the inspection and the test plan, the issue of safety and health at the construction site, the project concerning the construction site installation, the mechanical assembly, assessment of tower crane, object time and financial plan, construction technology study and the construction timetable.
312

Horský hotel / Mountain hotel

Vandrovec, Aleš January 2014 (has links)
Master’s thesis theme is mountain hotel project. The hotel has one lower basement and four aboveground floor. It has trditional look and the roof is double-pitched. Floor projection looks like letter "L". Main part has measurements 25,3 x 14,1 m and it has four floor. Extension is on northwest side of main part. It has measuremnts 11,85 x 9,5 m and three floor. Facede of basement and first floor is from stone facing mansory. Facade od second floor of main patr of buildings id timbered looks like curb. Third and fourth floor are attic, gable is vertical timbered. Facade of second floor of extension is plaster on ETICS. The gable od extension is vertical timbered. Roof covering is alpen shingle from larch wood. Foundations of house are shallow. The construction system is walled. The lower basement is built from masonry BS Klatovy BD30 and other wall are from masonry Porotherm . Floor structures are from monolithic reinforced concrete, thickness 220 mm. House stairs are prefabricated double-flight. Partition wall are mostly built from mansory Porotherm 11,5 P+D. Lintols above windows and doors in facadeare made by reverse of floor slab and inside of disposition are made by ceramics lintols Porotherm. Floor structures are floating with impact insulation in whole house. In living rooms wear layers are from oak parquet block and in common rooms, toilets, bathrooms and technical rooms is ceramics paving. Wall’s surfaces are made from patent plaster and in lower basement are made from two-coat work with white coat. Toilets and bathrooms are tilled with ceramic tiles. All distributions of building equipment are covered with gypsum plasterboard ceiling. All windows and doors in facade are made by wooden profile Solid comfort SC78 and glazed by triple glazing unit (Uw,max=0,9 W/m2.K), exception is main entrance door, It is made by aluminum profile and it is automatically opened.
313

Stavebně technologický projekt výrobní a skladovací haly v Hodoníně / Architectural and technological project of manufacturing and warehouse hall in Hodonin

Šrámek, Pavel January 2016 (has links)
The object of this work is the solution of building technological project to build "Manufacturing and storage hall in Hodonin" including technological solutions with time and financial plan, technological regulations of selected activities, design of mechanical assemblies, inspection and test plans and choosing the appropriate method of implementing the piled foundations.
314

Distribuční sklady v Praze - stavebně technologický projekt / Distribution warehouses in Prague - construction technology project

Lupač, David January 2017 (has links)
The subject of this thesis is the construction and technological project for distribution warehouses in Prague. Textual part contains a technical report on construction technology project, wider relations of traffic routes with marked critical points, the study of the main technological stages of the building, principles of organization of construction, design of the main building machines and mechanisms, technological regulations, inspection and test plans, health and safety on the site. In the section with attachments there is a map of the locality, drawings of site facilities, including road signs, charts of the movement of machines, the schedule of the main building structure, the budget of the main building structure, a plan for securing material resources, time and financial plan, an economic evaluation of site facilities, details and other technical documentation stages.
315

Obecní úřad s mateřskou školou / Municipal authority with nursery school

Müller, David January 2022 (has links)
The subject of my diploma thesis is a new-building of a municipal authority with a nursery school in Obora near Boskovice. The objects are statically and operationally separated from each other, but they formo ne unit. The building is located on the corner of the village in a flat terrain and thus forms the dominant feature of the village and a landmark. The target of the design was to create a building that will harmoniously connect to the surrounding buildings, public spaces and the school garden. The municipal authority has a rectangular floor plan, two-storey, basement, covered with a sloping roof, the building has a designed elevator. In the basement there are cellars of local associations, on the ground floor there is information center, a municipal library and on the first floor there is a municipal office with a registry office and a ceremonial hall. The attic can be used in the future for municipal apartments for rent. An official board with a public space is designed ahead of the municipal office. A photovoltaic power plant will be located on the roof of the municipal office. The nursery school has a trapezoidal floor plan, ground floor, no basement, covered with a vegetated flat roof. In the nursery school there is a children's day room with a storage room, storage of mattresses, teaching aids, food preparation, technical and hygienic facilities. The structural systém of both objects is longitudinal, wall. The underground part of the municipal office is designed in a white concrete tub system. The vertical load-bearing constructions are made from cut ceramic blocks. The horizontal constructions in the municipal office are monolithic, ferroconcrete, and in the nursery school they are prefabricated, ferroconcrete. The project was made in AutoCad software application, 3D model in 3D modelling computer program SketchUp.
316

Stavebně technologický projekt přípravy a realizace Domova pro seniory Žacléř / Construction project for implementation of Retirement home Žacléř

Bonaventura, Pavel January 2022 (has links)
The aim of this diploma thesis is to prepare the construction of a Home for the Elderly in Žacléř. The work deals with technical regulations for the dismantling of asbestos roofing, demolition work and monolithic structures. For these regulations, a time plan for the implementation of monolithic structures, a control and test plan for monolithic structures, an itemized budget and a time and financial plan - object-oriented will be prepared. Furthermore, this work contains the coordination situation of the construction with broader transport relations, the design of the assembly machine, the report for the construction site equipment with drawings of the construction site equipment for individual technological regulations and last but not least the health and safety plan and assessment of construction noise. As part of the diploma thesis, several appendices were prepared for this stage, such as crane assessment, details of monolithic stair arms, noise wall scheme, budget for construction site equipment, environmental plan, ceiling and wall formwork scheme and staff balance for selected stages.
317

Stavebně technologický projekt výrobní haly v Sudoměřicích / Construction technological project of the production hall in Sudoměřice

Kolacia, Tomáš January 2022 (has links)
The subject of the diploma thesis is construction-technological solution for realization of the production hall with administrative part in Sudoměřice. Parts of the thesis are the technical report for the construction-technological project, a study of the realization of the main technological stages of the building, the solution of the wider transport route links, where I designed and assessed selected transport routes. The other parts of the diploma thesis are design of a site equipment with the technical report of the site equipment, design of the main building machines and mechanisms. The time and financial plans of objects are elaborated, followed by the detail time schedule of the realization of the main building obejct with a workers needs diagram and the item budget of the main building object with the bill of quantities. For the proces of the realization of the reiforced concrete prefabricated construction, the technological regulation for the assembly of elements with usability of the mobile crane, was made. In the diploma thesis, the technological regulation for the reiforced concrete cast-in-place columns and bond beams, was also prepared. Due to the high demands on the quality of the construction, the control and test plans for the assembly of the reiforced concrete prefabricated elements and for the cast-in-place columns and bond beams, were also prepared. Within the environmental protection, the requirements for the certification LEED 2009 Core & Shell, were processed.
318

Stavebně technologický projekt montované haly v Pardubicích / CONSTRUCTION TECHNOLOGICAL PROJECT OF PREFABRICATED HALL IN PARDUBICE

Švub, Daniel Unknown Date (has links)
Diploma thesis deals with construction-technological project of prefabricated steel hall. I put emphasis on technological process of foundation structures. The time schedule of all processes, the cost estimation budget, the inspection and testing plan and the machine set designing are also contained. The building site equipment for excavation and rough superstructure and the coordination plan drawing with transportation roads is designed.
319

Výstavba sportovní haly v Novém Městě na Moravě - stavebně technologický projekt / Construction of a sports hall in Nové Město na Moravě - construction technology project

Tomášek, Martin Unknown Date (has links)
This diploma thesis deals with the construction technological preparation of a sports hall in Nové Město na Moravě. The aim of the work is the most optimal design of the construction process. The work contains a technical report of construction technology project, coordination situation of construction with wider links of transport routes, calculation of construction according to THU, time and financial plan of construction, study of main technological stages of building, construction site project, design of main construction machines and mechanisms, building, time schedule of the main building, technological regulation, control and test plan, environmental and safety risks with a plan of their specific solutions for the cladding of skeleton Kingspan panels. Part of the work is also an alternative design of internal partitions.
320

Stavebně technologický projekt výrobní haly v Hodějicích / Construction Project for Implementation of Industrial Hall in Hodějice

Koudelková, Anna Unknown Date (has links)
The final thesis is focused on construction of the complex Milmar s.r.o. company, specifically, it focuses on the construction technology project of the SO02 Production Hall building. Diploma thesis detail solved through technological regulations prefabricated reinforced concrete skeleton construction of the hall and then implement concrete floors with infill. For the construction of the hall, an itemized budget was prepared with a statement of area, time schedule, health and safety plan, design of construction supply and assessment of transport routes, the main construction mechanisms were selected and variants of the main construction mechanisms, control and test plans were assessed. An accompanying and technical report, a construction technology study, and the sustainability certification of the LEED 2009 system were prepared for the entire construction. The text and drawing part was prepared according to the assignment of the diploma thesis.

Page generated in 0.0599 seconds