• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 156
  • 150
  • 59
  • 24
  • 15
  • 15
  • 15
  • 15
  • 15
  • 15
  • 5
  • 5
  • 3
  • 2
  • 1
  • Tagged with
  • 484
  • 484
  • 124
  • 119
  • 115
  • 109
  • 88
  • 77
  • 76
  • 73
  • 69
  • 63
  • 61
  • 60
  • 59
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
101

Repair of prestressed concrete bridge girders for shear

Lemay, Lionel. January 1986 (has links)
No description available.
102

The development of high-performance post-tensioned rocking systems for the seismic design of structures : a thesis presented for the degree of Doctor of Philosophy in Civil Engineering at the University of Canterbury, Christchurch, New Zealand /

Marriott, Dion. January 1900 (has links)
Thesis (Ph. D.)--University of Canterbury, 2009. / Typescript (photocopy). "February 2009." Includes bibliographical references. Also available via the World Wide Web.
103

Repair of prestressed concrete bridge girders for shear

Lemay, Lionel. January 1986 (has links)
No description available.
104

Reliability assessment of a prestressed concrete member

Brand, W. W. (Willem Wouter) 12 1900 (has links)
Thesis (MScEng)--University of Stellenbosch, 2001. / ENGLISH ABSTRACT: First-order second-moment structural reliability methods are used to assess the reliability of a prestressed concrete beam. This beam was designed for imposed office floor loads and partitions following the limit states design method as provided for by the applicable South African structural codes, viz SABS 0100-1:1992 and SABS 0160:1989. The reliability is examined at two limit states. At the ultimate limit state of flexure the ultimate moment of resistance must exceed the applied external moment at the critical section, while at the serviceability limit state of deflection the deflection must satisfy the codespecified deflection criteria. Realistic theoretical models are selected to express the flexural strength and deflection of the prestressed concrete member, while appropriate probabilistic models are gathered from the literature for loading, resistance and modelling uncertainties. The calculated reliability index at the ultimate limit state of flexure (3.10) is lower than expected in view of the fact that this represents a non-critical limit state in the case of a Class 2 prestressed concrete member. This condition can be explained with reference to the relatively high uncertainty associated with the modelling error for flexural strength. The calculated reliability index at the serviceability limit state of deflection (l.67) compares well with acceptable practice. The study further focuses on the sensitivity of the reliability at the two limit states of interest to uncertainty in the various design parameters. The ultimate limit state of flexure is dominated by the uncertainty associated with the modelling error for flexural strength, while the contribution to the overall uncertainty of the ultimate strength and area of the prestressing steel and the effective depth is less significant. In comparison the reliability at the serviceability limit state of deflection is not dominated by the uncertainty associated with a single basic variable. Instead, the uncertainty associated with the modelling error, creep factor and prestress loss factor are all significant. It was also demonstrated that the variability in beam stiffness is not a major source of uncertainty in the case of a Class 2 prestressed concrete member. It is recommended that the present code provisions for ultimate strength and deflection should be reviewed to formulate theoretical models with reduced systematic and random errors. The effect of the uncertainty associated with the creep and prestressed loss factors should also be adressed by adjustment of the partial material factor for concrete at the serviceability limit state of deflection. Furthermore, research must be directed towards formulating an objective failure criterion for deflection. The uncertainty in the deflection limit must therefore be quantified with a probability distribution. / AFRIKAANSE OPSOMMING: Eerste-orde tweede-moment struktuur betroubaarheid metodes word ingespan om die betroubaarheid van 'n voorspanbeton balk te bereken. Hierdie balk is ontwerp vir opgelegte kantoor vloerbelasting en partisies volgens die grenstoestand ontwerp metode soos beskryf in die toepaslike Suid-Afrikaanse boukodes, naamlik SABS 0100-1: 1992 en SABS 0160: 1989. Die betroubaarheid word ondersoek by twee grenstoestande. By die swiglimiet van buiging moet die weerstandsmoment die eksterne aangewende moment oorskrei by die kritieke balksnit, terwyl die defleksie die kriteria soos voorgeskryf deur die kode moet bevredig by die dienslimiet van defleksie. Realistiese teoretiese modelle word gebruik om die buigsterkte en defleksie van die voorspanbeton balk te bereken. Verder is geskikte waarskynlikheid modelle uit die literatuur versamelom die belasting, weerstand en modelonsekerhede te karakteriseer. Die betroubaarheid indeks soos bereken vir die swiglimiet van buiging (3.10) is laer as wat verwag sou word in die lig van die feit dat hierdie nie 'n kritieke grenstoestand verteenwoordig in die geval van 'n Klas 2 voorspan element nie. Dit kan verklaar word met verwysing na die relatiewe groot onsekerheid wat geassosieer word met die modellering fout vir buigsterkte. Die berekende betroubaarheid indeks vir die dienslimiet van defleksie (1.67) vergelyk goed met aanvaarde praktyk. Die studie fokus verder op die sensitiwiteit van die betroubaarheid by die twee grenstoestande onder beskouing ten opsigte van die onsekerheid in die verskillende ontwerp parameters. By die swiglimiet van buiging word die onsekerheid oorheers deur die bydrae van die modelering fout vir buigsterkte. Die bydraes tot die totale onsekerheid deur die swigsterkte en area van die voorspanstaal sowel as die effektiewe diepte is minder belangrik. By die dienslimiet van defleksie word die betroubaarheid nie oorheers deur die onsekerheid van 'n enkele basiese veranderlike nie. In stede hiervan is die onsekerheid van die modellerings fout, kruipfaktor en voorspan verliesfaktor almal noemenswaardig. Daar word verder aangetoon dat die veranderlikheid in balkstyfheid nie 'n belangrike bron van onsekerheid in die geval van 'n Klas 2 voorspan element is nie. Daar word aanbeveel dat die bestaande voorskrifte in die kode vir buigsterkte en defleksie aangespreek moet word deur teoretiese modelle met klein modelonsekerhede te formuleer. Die uitwerking van die onsekerheid van die kruip- en voorspan verliesfaktore kan aangespreek word deur 'n aanpassing te maak in die parsiële materiaalfaktor vir beton in die geval van die dienslimiet van defleksie. Navorsing moet verder daarop gemik wees om 'n objektiewe falingskriterium vir defleksie te formuleer. Die onsekerheid van die toelaatbare defleksie moet dus gekwatifiseer word deur 'n waarskynlikheidsverdeling.
105

Shear behavior of spliced post-tensioned girders

Moore, Andrew Michael, 1984- 24 October 2014 (has links)
By its nature a spliced girder must contain a number of post tensioning tendons throughout its length. The focus of the experimental program described in this dissertation is the evaluation of the strength and serviceability of post-tensioned girders loaded in shear, and, more specifically, how a post-tensioning duct located in the web of a girder affects the shear transfer mechanism of a bulb-tee cross-section. Due to the limited number of tests in the literature conducted on full-scale post-tensioned girders, eleven shear tests were performed on seven prestressed concrete bulb-tee girder specimens. Of these tests, ten were conducted on specimens that contained a post-tensioning duct within their web and additional pretensioning reinforcement in their bottom and top flanges. The remaining shear test was conducted on a control specimen that did not have a post-tensioning tendon but contained the same pretensioning reinforcement as the post-tensioned girder specimens. The behavioral characteristics of these eleven test specimens at service level shear forces and at their ultimate shear strengths were evaluated in regards to five primary experimental variables: (i) the presence of a post-tensioning duct, (ii) post-tensioning duct material (plastic or steel), (iii) web-width, (iv) duct diameter, and (v) the transverse reinforcement ratio. The findings of this experimental study are described in detail within this dissertation, but can be summarized by the following two points. (i) No differences were observed in the ultimate or service level shear behavior in girders containing plastic grouted ducts when compared to those containing steel grouted ducts and (ii) The current procedure of reducing the effective web width to account for the presence of a post-tensioning duct is ineffective because it addresses the incorrect shear transfer mechanism. A method that correctly addresses the reduction in shear strength due to the presence of a post-tensioning duct was developed and verified using the tests performed during this experimental program and tests reported in the literature. / text
106

FLEXURAL BEHAVIOR OF LIGHTLY REINFORCED UNBONDED POST-TENSIONED CONCRETE BEAMS.

Karimnassaee, Ali, 1959- January 1986 (has links)
No description available.
107

Preparation and durability testing of pretensioned prestressed concrete specimens

Rieb, Stanley Lee. January 1959 (has links)
Call number: LD2668 .T4 1959 R54
108

Determining the transfer length in prestressed concrete railroad ties produced in the United States

Murphy, Robert Lawrence January 1900 (has links)
Master of Science / Department of Civil Engineering / Robert J. Peterman / This thesis presents results from transfer length measurements on prestressed concrete railroad ties. Results are shown from the four main producers of concrete ties in the United States. Six prestressed concrete tie plants were visited by the research team to measure transfer length on ties with various mix designs and prestressing reinforcement. After all plants had been visited, a total of nine concrete-mix designs and 10 reinforcement variations were tested. Overall, 220 transfer length measurements were conducted on prestressed concrete railroad ties during the duration of this research project. This was the first coordinated effort to measure transfer lengths in concrete railroad ties ever conducted in the industry. Concrete strains were monitored using the standard Whittemore gage, as well as a non-contact procedure called laser-speckle imaging (LSI). This method to measure transfer lengths has been developed at Kansas State University (KSU). Ties measured using the Whittemore gage were sent back to the civil engineering structural laboratory at KSU so the long-term transfer lengths could be monitored. After a certain period of time, the ties were load-tested according to the American Railway Engineering and Maintenance-of-Way Association (AREMA) loading specifications of the rail-seat positive moment test.
109

Design of post-tensioned flat plates

Mirza, Rais January 2010 (has links)
Digitized by Kansas Correctional Industries / Department: Civil Engineering.
110

Calcium Sulfoaluminate Cement Concrete for Prestressed Bridge Girders: Prestressing Losses, Bond, and Strength Behavior

Markosian, Nicholas 01 May 2019 (has links)
Calcium sulfoaluminate (CSA) cement was used to cast a prestressed voided deck slab bridge girder. The rapid-set properties of CSA cement allowed the initial concrete strength to reach the required 4300 psi needed in order to cut the prestressing strands 6.5 hours after casting. Prestress losses were monitored long-term using vibrating wire strain gages cast into the concrete at the level of the prestressing strands and the data was compared to the American Association of State Highway and Transportation Officials Load and Resistance Factor Design (AASHTO LRFD) predictions for prestress losses. AASHTO methods for prestress loss calculation were overestimated compared to the vibrating wire strain gage data. Material testing was performed to quantify material properties including compressive strength, tensile strength, static and dynamic elastic modulus, creep, and drying and autogenous shrinkage. The material testing results were compared to AASHTO predictions for creep and shrinkage losses. The bridge girder was tested at midspan and a distance 1.25 times the depth of the beam from the face of the support until failure. Midspan testing consisted of a crack reopening test to solve for the effective prestress in the girder and a test until failure. The crack reopen effective prestress was compared to the AASHTO prediction and AASHTO appeared to be effective in predicting losses based on the crack reopen data. The midspan failure was a shear failure, as accurately predicted by AASHTO. The 1.25d test resulted in a bond failure, which was accurately predicted by the AASHTO bond model for prestressed concrete. Funding for this project was provided by The Mountain Plains Consortium.