Spelling suggestions: "subject:"canprocess off production"" "subject:"canprocess oof production""
1 |
Cause-selecting charting techniques in multistage processes /Shu, Lianjie. January 2002 (has links)
Thesis (Ph. D.)--Hong Kong University of Science and Technology, 2002. / Vita. Includes bibliographical references (leaves 126-136). Also available in electronic version. Access restricted to campus users.
|
2 |
Cumulative quantity control chart and maintenance strategies for industrial processesOuyang, Jintao. January 2004 (has links)
Thesis (M. Phil.)--University of Hong Kong, 2005. / Title proper from title frame. Also available in printed format.
|
3 |
Implementing lean manufacturing tools in a small manufacturing environmentOlson, Dana Marc. January 2004 (has links) (PDF)
Thesis, PlanB (M.S.)--University of Wisconsin--Stout, 2004. / Includes bibliographical references.
|
4 |
The development of systematic controllability assessment for process control designs /Ekawati, Estiyanti. January 2003 (has links)
Thesis (Ph.D.) --Murdoch University, 2003. / Thesis submitted to the Division of Science and Engineering. Includes bibliographical references.
|
5 |
Návrh změn výrobního procesu vybraného výrobního portfolia / Proposal of Changes the Manufacturing Process of the Selected Product PortfolioVozáriková, Renáta January 2014 (has links)
This master´s thesis provides information about company which scope of business is particularly the manufacturing of telecommunications equipments. The theme of the thesis is the proposal of changes for the manufacturing process of selected product portfolio. The proposals for change of the manufacturing process are based on the data floating from theoretical and analytical part of the thesis.
|
6 |
Study of Architecture-Oriented Production/Marketing ManagementChang, Wen-ming 22 January 2007 (has links)
The production and marketing management is the primary activities of the enterprise value chain; what is more, the performance of it has become the most important key point of enterprise management to create profit and competition. Hence, by controlling the enterprise total resources and tightly negotiation between production and marketing departments, to reinforce the mutual understanding and achieve the best performance from limited resource, it has formed the essential field criteria for manufacture companies to manage in the variable business circumstance. Thus, for the present production and marketing management activities, it is the necessary to describe more clearly in organization interfaces among the departments, and reveal full scope of total resource. For top management give a strong support to make the right decision.
This Architecture-Oriented (AO) study uses structure-and-behavior-in-one-unity, building up an Architecture-Oriented Production/Marketing (AOPM) management model, and establish the model build-up rules to provide the build-up sequence to follow. By introducing practical Production/Marketing management examples in implementation of Architecture-Oriented to actual cases, through compare the conventional Process- Oriented Production/Marketing (POPM) with the research AOPM to obtain a another brand new model for enterprise management consideration.
This research is divided into three parts (1) concept of the Architecture-Oriented (2) establish the model build-up rules to provide the build-up sequence to follow (3) build up an AOPM management model. The main contribution is that AOPM management model contains structure view, behavior view, resource view, organization view and the other point of views. To compare the AOPM management model with the conventional POPM management model through different views in organization function, interface and resource consolidation, show that the APOM management model is much better then conventional POPM management model to meet enterprise management demand. This model is net only easy to establish but also in controlling the build-up rules. So it is helpful for enterprise to introduce Architecture-Oriented management model as a useful tool.
|
7 |
Using lean principles and simulation to enhance the effectiveness of a failure analysis laboratory in a manufacturing environmentTashtoush, Tariq Husni. January 2009 (has links)
Thesis (M.S.)--State University of New York at Binghamton, Thomas J. Watson School of Engineering and Applied Science, Department of Systems Science and Industrial Engineering, 2009. / Includes bibliographical references.
|
8 |
Studie průběhu zakázky organizací / The Studies During the Engagement OrganizationsKvapilová, Barbora January 2015 (has links)
The thesis is focused on the study during the engagement in the company ČKD Blansko Holding, Inc. The company creates water turbines and hydro facilities of hydroelectric power stations. The thesis is divided to two parts. The first part is concerned with the theoretical knowledge. The second part focuses on the analysis of the current status during the commission and on proposals for changes to streamline the entire process.
|
9 |
Studie průběhu zakázky podnikem / The Study Progress of the Contract CompanyKrejčí, David January 2016 (has links)
This master‘s thesis is focused on optimization of order processing in production company NovaSteel, s.r.o. which is engaged in manufacturing of agricultural transport vehicles. Subject of this work is to analyze an economic situation of the company and propose possible solutions of the found issues. The main contribution is to provide options for improving the current situation during the commission.
|
10 |
Análise da qualidade do processo de produção no Centro de Sementes Nativas do Amazonas: padronização da qualidadePinheiro Júnior, Marcos Hervé 12 December 2011 (has links)
Made available in DSpace on 2015-04-13T12:17:38Z (GMT). No. of bitstreams: 1
DISSERTACAO MARCOS.pdf: 2310482 bytes, checksum: 08bbc133d41c52da12f2d2c336476c94 (MD5)
Previous issue date: 2011-12-12 / FAPEAM - Fundação de Amparo à Pesquisa do Estado do Amazonas / In Brazil the production in little amount and the absence of quality of the forest seeds of produced native species are considered a problem in the productive chain of production of forest seeds. The lack of knowledge on the process of production of forest seeds is one of the pass for the sector. The theoretical referential of this research had the pretension to all offer to basement for the understanding of the process of production of forest seeds and of the conceptualization of quality and its some aspects related with the process. This research analyzes the quality of process of production of native forest seeds of the Center of Native Seeds of Amazon (CSNAM), in the direction to consider, instructions of work for the production process, observing and organizing the information concerning the current process of production, for this, it was needed to mapper the processes, to know the available data of each stage of production and the congruence with the legal Law 10711 and its devices; To identify the requirements essential of the quality of each stage of the process and to define the instructions of work of all the stages of the production process. The employed method was the same that it is used for systematization considered for NBR ISO 9000:2000. How much to the results it could be observed by means of analyzes of the data generated during the production of sixty and two lots, that much lacks to structuralize and to accomplish the production of native forest seeds in CSNAM with the quality the one that if considers. / No Brasil a produção em pouca quantidade e a ausência de qualidade das sementes florestais de espécies nativas produzidas é considerada um problema na cadeia produtiva de produção de sementes florestais. A falta de conhecimento sobre o processo de produção de sementes florestais é um dos gargalos para o setor. O referencial teórico desta pesquisa teve a pretensão de oferecer embasamento para a compreensão de todo o processo de produção de sementes florestais e da conceituação de qualidade e seus vários aspectos relacionados com o processo. Esta pesquisa analisa a qualidade do processo de produção de sementes florestais nativas do Centro de Sementes Nativas do Amazonas (CSNAM), no sentido de propor, instruções de trabalho para o seu processo de produção, observando e organizando as informações acerca do atual processo de produção, para isso, necessitou-se mapear os processos, conhecer os dados disponíveis de cada etapa de produção e a congruência com a Lei 10711 e seus dispositivos legais; Identificar os requisitos essenciais da qualidade de cada etapa do processo e definir as instruções de trabalho de todas as etapas do processo de produção. O método empregado foi o mesmo que é utilizado para padronização de processos e implementação proposto pela NBR ISO 9000:2000. Quanto aos resultados pôde-se observar por meio da analise dos dados gerados durante a produção de sessenta e dois lotes, que muito falta para se estruturar e efetivar a produção de sementes florestais nativas no CSNAM com a qualidade a que se propõe.
|
Page generated in 0.1237 seconds