• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Influência do sistema de gestão de produtividade no custo e prazo de execução dos empreendimentos do Distrito Federal / Influence of management system productivity in cost and time execution of developments of Federal District

Feitoza, Vitor Amadeu da Siva 26 November 2014 (has links)
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Civil e Ambiental, 2014. / Submitted by Felipe Rodrigues (felipe.rodrigues87@gmail.com) on 2015-12-04T14:35:56Z No. of bitstreams: 1 2014_VictorAmadeuDaSilvaFeitoza.pdf: 2230682 bytes, checksum: ac83e8a127bbe85978abe9a6d33d8b5d (MD5) / Approved for entry into archive by Guimaraes Jacqueline(jacqueline.guimaraes@bce.unb.br) on 2015-12-07T13:44:09Z (GMT) No. of bitstreams: 1 2014_VictorAmadeuDaSilvaFeitoza.pdf: 2230682 bytes, checksum: ac83e8a127bbe85978abe9a6d33d8b5d (MD5) / Made available in DSpace on 2015-12-07T13:44:09Z (GMT). No. of bitstreams: 1 2014_VictorAmadeuDaSilvaFeitoza.pdf: 2230682 bytes, checksum: ac83e8a127bbe85978abe9a6d33d8b5d (MD5) / Com o desaquecimento do mercado da construção, tem-se um novo cenário marcado pelo aumento da concorrência. Esta situação é agravada pelos constantes atrasos na entrega dos empreendimentos e aumento do custo de construção. Desta forma, se as empresas quiserem continuar no mercado é extremamente necessário investimentos em qualidade e na melhoria da produtividade. Neste contexto,o entendimento da produtividade dos serviços na construção civil e os fatores gerenciais que o influenciam é fundamental para a busca de ganhos de produtividade, qualidade, atendimento de prazos e controle orçamentário, favorecendo o aumento da competitividade das empresas.Nesse viés, tendo em vista a importância da gestão da produtividade, o presente trabalho buscou identificar os principais aspectos que influenciam no custo e prazo de execução de empreendimentos multipavimentos residencial e comercial no Distrito Federal,tendo como foco o estudo do Sistema de Gestão da Produtividade, utilizados pelas empresas.A pesquisa tem um caráter exploratório e foi realizada por meio de questionários aplicados aos responsáveis técnicos das empresas: engenheiros residentes, gerentes de obra, gerentes de projeto, supervisores e diretores. Elaborado a partir do referencial teórico, o questionário da pesquisa apresentou quarenta e sete questões, que objetivaram levantar as características da empresas, as ferramentas utilizadas pelas empresas para controle de custo e prazo, perfil dos gestores e dados relacionados com o sistema de gestão de produtividade. A pesquisa foi realizada em duas fases, sendo que a primeira fase se limitou à projeção do elemento quantitativo (questionário), coleta de dados e tratamento de dados, já a segunda fase destinou-se a analise de correlação das variáveis dependentes aumento de custo, aumento de prazo e Utilização de Sistema de Gestão de Produtividade.Verificou-se que a utilização do Sistema de Gestão de Produtividade não tem influencia no atraso de execução de empreendimentos. Isso é decorrente do fato de que os Sistemas são distintos de uma empresa para outra. Por outro lado quando se realizou a regressão tendo como variáveis os elementos que compõem o sistema, verificou-se que o “treinamento da mão de obra”, “analisar a produtividade mensurada e comparar com os índices de produtividade do cronograma e da composição de custo” e “quantificação das perdas geradas na execução do serviço, sendo essas perdas referentes tanto ao material quanto a mão de obra” apresentaram influencia no atraso, ou seja, Sistemas de Gestão de Produtividade que possui estes elementos tem menor probabilidade de ocorre atraso na execução do empreendimento. ________________________________________________________________________________ ABSTRACT / With the slowdown in the construction market, has become a new environment marked by increasing competition. This is compounded by the constant delays in the delivery of projects and increased construction costs. Thus, if companies wish to remain on the market is extremely necessary investments in quality and productivity improvement. In this context, understanding the productivity of services in construction and managerial factors that influence it is vital for the pursuit of productivity gains, quality, compliance deadlines and budget control, favoring the increased competitiveness of companies This bias, given the importance of productivity management, this study sought to identify the key aspects that influence the cost and lead time multipavimento residential and commercial development in the Federal District. Focusing on the study of Productivity Management System, used by companies.The research has an exploratory character and was conducted through questionnaires applied to the technical managers of companies: resident engineers, project managers, project managers, supervisors and directors. Drawn from the theoretical framework of the survey questionnaire presented forty-seven issues, which aimed to raise the characteristics of businesses, the tools used by companies to control cost and schedule, profile of managers and related data management system productivity . The survey was conducted in two phases, with the first phase merely projection of quantitative element (questionnaire), data collection and data processing, while the second phase was designed to analyze the correlation of the dependent variable cost increase, increase the term and use of Productivity Management System.It has been found that the use of Productivity Management System has no influence on the delay performance of projects. This is due to the fact that the systems are different from one company to another. On the other hand when it performed the regression having as variables the elements that compose the system, it was found that the "training of manpower", "analyze the measured productivity and compare the rates of productivity schedule and cost composition "and" quantification of losses generated in the execution of the service, such losses being related to both the material and the workmanship "had influence on the delay, ie, Productivity Management Systems which have these elements is less likely to delay occurs in the execution the enterprise.
2

Sistema híbrido de climatização visando conforto térmico e eficiência energética

Flores, José Luis Olmos 06 September 2009 (has links)
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Elétrica, 2009. / Submitted by Jaqueline Ferreira de Souza (jaquefs.braz@gmail.com) on 2011-06-06T14:00:22Z No. of bitstreams: 1 2009_JoseLuisOlmosFlores.pdf: 2865819 bytes, checksum: 72409e7cfbe728a40697a0b4486c338a (MD5) / Approved for entry into archive by Jaqueline Ferreira de Souza(jaquefs.braz@gmail.com) on 2011-06-06T14:06:49Z (GMT) No. of bitstreams: 1 2009_JoseLuisOlmosFlores.pdf: 2865819 bytes, checksum: 72409e7cfbe728a40697a0b4486c338a (MD5) / Made available in DSpace on 2011-06-06T14:06:49Z (GMT). No. of bitstreams: 1 2009_JoseLuisOlmosFlores.pdf: 2865819 bytes, checksum: 72409e7cfbe728a40697a0b4486c338a (MD5) / A motivação do presente trabalho foi a busca do uso racional de energia elétrica visando ganho de produtividade e redução de custos, através de um equipamento de climatização híbrido (convencional + evaporativo), focado na área de automação predial e industrial. O objetivo deste trabalho de pós-graduação foi desenvolver um sistema de climatização que forneça uma melhor condição de conforto térmico, tendo renovação de ar e principalmente com menor consumo de energia elétrica dentro das Normas Técnicas vigentes. Para atingir o objetivo desejado foram analisadas as instalações a climatizar, os sistemas de condicionamento de ar existentes e a forma de operação dos diversos equipamentos considerando o consumo de eletricidade. Os resultados alcançados foram melhor conforto térmico e, redução do consumo de energia elétrica através da utilização do sistema híbrido de climatização. _______________________________________________________________________________ ABSTRACT / The motivation of the present work is the search for rational use of electric power, improving productivity and costs reduction through a hybrid climatization equipment (conventional + evaporative), focused in building and industrial automation. The objective of dissertation is to develop a climatization system that gives thermal comfort with electric power consumption reduction, aiming to the Federal Technical Norms and the environmental concerns. To reach the desired the existing air conditioning system and the operation be analyzed, and new equipment have been designed, constructed and installed. The obtained results were: better thermal comfort, as well as cost reduction with electricity through with the use of hybrid system.

Page generated in 0.074 seconds