• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • 1
  • 1
  • Tagged with
  • 5
  • 5
  • 5
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Improving right-of-way acquisition in highway projects through scope definition and management of inherent factors

Le, Tiendung 24 March 2011 (has links)
Right-of-Way (R/W) acquisition is a critical function in the project development process (PDP). Improving this acquisition process requires both a good collaboration among the functions of the PDP and a good understanding of the factors affecting R/W acquisition. This research has two phases. Phase I aims at developing a systematic method for risk and scope management using scope elements that cover the work of all functions of the entire PDP. Phase II aims at studying the inherent factors that might have significant impact on the R/W acquisition schedule. As a result, the Advance Planning Risk Analysis (APRA) was successfully developed. It contains 59 scope elements with descriptions and a mechanism to assess the project’s level of definition. The APRA can provide a platform for project participants to cooperate and coordinate project activities and responsibilities. The method provides a high level approach to improving the effective of the PDP and its functions, including R/W acquisition. In studying the R/W acquisition inherent factors in phase II, the research was able to draw conclusions on the impact of the identified inherent factors on R/W acquisition durations based on statistical analyses. The research was also successful in developing a statistically significant model for predicting the total R/W acquisition duration, from R/W Release to Possession, using inherent factors. This research provides a number of significant contributions toward the better understanding and improvement of the PDP process in general and the R/W acquisition process in particular. Further research in this area and direction was recommended and believed to be promising, productive, and highly valuable. / text
2

Avaliação de objetivos de sustentabilidade: estudo de caso de duas instituições educacionais / Sustainability targets analysis: case study of two educational buildings

Muñoz Navarrete, Santiago January 2011 (has links)
Proposta: O desenvolvimento de empreendimentos mais sustentáveis no Brasil apresenta desafios para o setor da construção civil, devido à incorporação de parâmetros inovadores, que a maioria de intervenientes na cadeia produtiva dos empreendimentos não coordena adequadamente. Embora exista uma quantidade considerável de estudos que apontem as vantagens das edificações sustentáveis, poucos referem as exigências e as novas atividades na gestão desses empreendimentos, que surgem em decorrência da necessidade de atender aos objetivos de sustentabilidade propostos e da complexa interação entre eles. Ainda, uma das melhores formas para disseminar os princípios da construção sustentável, é através das instituições educativas. Assim, esta pesquisa insere-se no contexto da discussão do processo de projeto de edificações educacionais, com foco na sustentabilidade. Objetivos: O objetivo principal desta pesquisa foi: avaliar como a interação sistêmica afeta o atendimento aos objetivos de empreendimentos com foco na sustentabilidade. Esse objetivo foi desdobrado nos objetivos específicos: propor uma forma de explicitar os objetivos de sustentabilidade; identificar as interações mais importantes no atendimento aos objetivos de sustentabilidade; identificar as causas do não atendimento aos objetivos de sustentabilidade. Método: A estratégia de pesquisa adotada foi o estudo de caso, realizado sobre dois empreendimentos já executados e em operação no Rio Grande do Sul. A pesquisa foi realizada em três etapas principais: compreensão, desenvolvimento e análise. A primeira etapa teve como objetivo caracterizar os estudos de caso, entender o processo de desenvolvimento e identificar os objetivos de sustentabilidade. Nesta etapa foram empregadas técnicas de análises de documentos, visitas e entrevistas com os diferentes intervenientes. A segunda etapa teve como objetivo a avaliação dos objetivos de sustentabilidade, contando com a ajuda de especialistas externos para a validação das análises. Nesta etapa foi proposta uma ferramenta gráfica para a estruturação dos critérios de sustentabilidade. Na última etapa foram discutidas as possíveis causas que levaram ao não atendimento dos objetivos propostos, e as recomendações para o desenvolvimento de futuros projetos desse tipo. Resultados: Os resultados da avaliação mostraram uma forte semelhança entre ambos estudos de caso, expondo o baixo atendimento dos objetivos de sustentabilidade. Foi percebido que a maior ocorrência das causas está relacionada à etapa de planejamento e projeto, considerando como aspecto importante, a definição efetiva do projeto, de modo que possibilite a mudança dos objetivos e a forma como eles serão atendidos, ao longo de todo o processo de projeto. / The development of sustainable projects in Brazil introduces challenges to the construction industry, on account of new variables that most stakeholders don’t manage properly. A fair amount of studies show the green building advantages, but just a few points out the new activities and demands on the project management, emerging by the existence of sustainable targets and the complex relations between them. Moreover, educational buildings are a good way to disseminate the sustainable construction principles. Thus, this study approaches the project development process of educational buildings with sustainability focus. The main objective of this study was to assess the influence of systemic relations on the achievement of sustainable project targets. This main objective was unfolded in three secondary objectives: propose how to (a form) make explicit the sustainable targets; identify the most important relations to the sustainable targets achievement; and identify the causes of failure in the sustainable targets achievement. The strategy followed was a case study research, developed on two building projects already built and in use in the Rio Grande do Sul state. The research was divided in three main phases: the first phase comprised the cases characterization, development process understanding and sustainable targets identification. The second phase consisted of sustainable targets assessment, supported by specialist validations. In this phase was proposed a graphic tool for organize the sustainable targets. The third phase comprised the discussion of failure causes in the sustainable targets achievement, and suggestions for future projects development. The assessment results showed a strong similarity between the two cases, having a poor achievement of the sustainable targets. Was concluded that most failure causes occurs at the programming and design phase, and a key aspect in this kind of projects is an early and effective definition of sustainable targets, to allow possible modifications along the project development process.
3

Avaliação de objetivos de sustentabilidade: estudo de caso de duas instituições educacionais / Sustainability targets analysis: case study of two educational buildings

Muñoz Navarrete, Santiago January 2011 (has links)
Proposta: O desenvolvimento de empreendimentos mais sustentáveis no Brasil apresenta desafios para o setor da construção civil, devido à incorporação de parâmetros inovadores, que a maioria de intervenientes na cadeia produtiva dos empreendimentos não coordena adequadamente. Embora exista uma quantidade considerável de estudos que apontem as vantagens das edificações sustentáveis, poucos referem as exigências e as novas atividades na gestão desses empreendimentos, que surgem em decorrência da necessidade de atender aos objetivos de sustentabilidade propostos e da complexa interação entre eles. Ainda, uma das melhores formas para disseminar os princípios da construção sustentável, é através das instituições educativas. Assim, esta pesquisa insere-se no contexto da discussão do processo de projeto de edificações educacionais, com foco na sustentabilidade. Objetivos: O objetivo principal desta pesquisa foi: avaliar como a interação sistêmica afeta o atendimento aos objetivos de empreendimentos com foco na sustentabilidade. Esse objetivo foi desdobrado nos objetivos específicos: propor uma forma de explicitar os objetivos de sustentabilidade; identificar as interações mais importantes no atendimento aos objetivos de sustentabilidade; identificar as causas do não atendimento aos objetivos de sustentabilidade. Método: A estratégia de pesquisa adotada foi o estudo de caso, realizado sobre dois empreendimentos já executados e em operação no Rio Grande do Sul. A pesquisa foi realizada em três etapas principais: compreensão, desenvolvimento e análise. A primeira etapa teve como objetivo caracterizar os estudos de caso, entender o processo de desenvolvimento e identificar os objetivos de sustentabilidade. Nesta etapa foram empregadas técnicas de análises de documentos, visitas e entrevistas com os diferentes intervenientes. A segunda etapa teve como objetivo a avaliação dos objetivos de sustentabilidade, contando com a ajuda de especialistas externos para a validação das análises. Nesta etapa foi proposta uma ferramenta gráfica para a estruturação dos critérios de sustentabilidade. Na última etapa foram discutidas as possíveis causas que levaram ao não atendimento dos objetivos propostos, e as recomendações para o desenvolvimento de futuros projetos desse tipo. Resultados: Os resultados da avaliação mostraram uma forte semelhança entre ambos estudos de caso, expondo o baixo atendimento dos objetivos de sustentabilidade. Foi percebido que a maior ocorrência das causas está relacionada à etapa de planejamento e projeto, considerando como aspecto importante, a definição efetiva do projeto, de modo que possibilite a mudança dos objetivos e a forma como eles serão atendidos, ao longo de todo o processo de projeto. / The development of sustainable projects in Brazil introduces challenges to the construction industry, on account of new variables that most stakeholders don’t manage properly. A fair amount of studies show the green building advantages, but just a few points out the new activities and demands on the project management, emerging by the existence of sustainable targets and the complex relations between them. Moreover, educational buildings are a good way to disseminate the sustainable construction principles. Thus, this study approaches the project development process of educational buildings with sustainability focus. The main objective of this study was to assess the influence of systemic relations on the achievement of sustainable project targets. This main objective was unfolded in three secondary objectives: propose how to (a form) make explicit the sustainable targets; identify the most important relations to the sustainable targets achievement; and identify the causes of failure in the sustainable targets achievement. The strategy followed was a case study research, developed on two building projects already built and in use in the Rio Grande do Sul state. The research was divided in three main phases: the first phase comprised the cases characterization, development process understanding and sustainable targets identification. The second phase consisted of sustainable targets assessment, supported by specialist validations. In this phase was proposed a graphic tool for organize the sustainable targets. The third phase comprised the discussion of failure causes in the sustainable targets achievement, and suggestions for future projects development. The assessment results showed a strong similarity between the two cases, having a poor achievement of the sustainable targets. Was concluded that most failure causes occurs at the programming and design phase, and a key aspect in this kind of projects is an early and effective definition of sustainable targets, to allow possible modifications along the project development process.
4

Avaliação de objetivos de sustentabilidade: estudo de caso de duas instituições educacionais / Sustainability targets analysis: case study of two educational buildings

Muñoz Navarrete, Santiago January 2011 (has links)
Proposta: O desenvolvimento de empreendimentos mais sustentáveis no Brasil apresenta desafios para o setor da construção civil, devido à incorporação de parâmetros inovadores, que a maioria de intervenientes na cadeia produtiva dos empreendimentos não coordena adequadamente. Embora exista uma quantidade considerável de estudos que apontem as vantagens das edificações sustentáveis, poucos referem as exigências e as novas atividades na gestão desses empreendimentos, que surgem em decorrência da necessidade de atender aos objetivos de sustentabilidade propostos e da complexa interação entre eles. Ainda, uma das melhores formas para disseminar os princípios da construção sustentável, é através das instituições educativas. Assim, esta pesquisa insere-se no contexto da discussão do processo de projeto de edificações educacionais, com foco na sustentabilidade. Objetivos: O objetivo principal desta pesquisa foi: avaliar como a interação sistêmica afeta o atendimento aos objetivos de empreendimentos com foco na sustentabilidade. Esse objetivo foi desdobrado nos objetivos específicos: propor uma forma de explicitar os objetivos de sustentabilidade; identificar as interações mais importantes no atendimento aos objetivos de sustentabilidade; identificar as causas do não atendimento aos objetivos de sustentabilidade. Método: A estratégia de pesquisa adotada foi o estudo de caso, realizado sobre dois empreendimentos já executados e em operação no Rio Grande do Sul. A pesquisa foi realizada em três etapas principais: compreensão, desenvolvimento e análise. A primeira etapa teve como objetivo caracterizar os estudos de caso, entender o processo de desenvolvimento e identificar os objetivos de sustentabilidade. Nesta etapa foram empregadas técnicas de análises de documentos, visitas e entrevistas com os diferentes intervenientes. A segunda etapa teve como objetivo a avaliação dos objetivos de sustentabilidade, contando com a ajuda de especialistas externos para a validação das análises. Nesta etapa foi proposta uma ferramenta gráfica para a estruturação dos critérios de sustentabilidade. Na última etapa foram discutidas as possíveis causas que levaram ao não atendimento dos objetivos propostos, e as recomendações para o desenvolvimento de futuros projetos desse tipo. Resultados: Os resultados da avaliação mostraram uma forte semelhança entre ambos estudos de caso, expondo o baixo atendimento dos objetivos de sustentabilidade. Foi percebido que a maior ocorrência das causas está relacionada à etapa de planejamento e projeto, considerando como aspecto importante, a definição efetiva do projeto, de modo que possibilite a mudança dos objetivos e a forma como eles serão atendidos, ao longo de todo o processo de projeto. / The development of sustainable projects in Brazil introduces challenges to the construction industry, on account of new variables that most stakeholders don’t manage properly. A fair amount of studies show the green building advantages, but just a few points out the new activities and demands on the project management, emerging by the existence of sustainable targets and the complex relations between them. Moreover, educational buildings are a good way to disseminate the sustainable construction principles. Thus, this study approaches the project development process of educational buildings with sustainability focus. The main objective of this study was to assess the influence of systemic relations on the achievement of sustainable project targets. This main objective was unfolded in three secondary objectives: propose how to (a form) make explicit the sustainable targets; identify the most important relations to the sustainable targets achievement; and identify the causes of failure in the sustainable targets achievement. The strategy followed was a case study research, developed on two building projects already built and in use in the Rio Grande do Sul state. The research was divided in three main phases: the first phase comprised the cases characterization, development process understanding and sustainable targets identification. The second phase consisted of sustainable targets assessment, supported by specialist validations. In this phase was proposed a graphic tool for organize the sustainable targets. The third phase comprised the discussion of failure causes in the sustainable targets achievement, and suggestions for future projects development. The assessment results showed a strong similarity between the two cases, having a poor achievement of the sustainable targets. Was concluded that most failure causes occurs at the programming and design phase, and a key aspect in this kind of projects is an early and effective definition of sustainable targets, to allow possible modifications along the project development process.
5

Sliding Scale Contingencies for the Highway Construction Project Development Process

Olumide, Adeniyi O. 2009 December 1900 (has links)
In the Highway construction project development process, State Highway Agencies (SHA) prepare cost estimates for effective communication to stakeholders and for project cost control. Cost estimates prepared in the planning phase of project development typically in a time range of 10 to 20 years from project letting are characterized by a great deal of uncertainty due to low scope definition. SHAs typically include an amount as contingency in the project cost estimate to cover costs due to unidentified or unquantified risks during project development. However, most of the methods used by SHAs to apply contingency to projects lack consistency in definition and application. This leads to poor communication to stakeholders, project cost escalation and other project control issues due to inaccuracy of baseline cost estimates. This study developed a set of sliding scale contingencies for estimating contingency on highway projects taking into consideration the effect of major factors, such as project complexity that impacts contingency application. Expert opinion was sought through the use of the Delphi technique. Experimental techniques were not suitable for this study due to the exploratory nature of the problem and the lack of data to analyze using empirical methods. The Delphi method typically consists of a series of rounds called questionnaires. Twenty-three professionals with experience in risk assessment and cost estimating agreed to participate in the study. Email was the means of communication using an excel spreadsheet. The assessment was completed in three iterative rounds with controlled feedback to the participants on the panel at the end of each round. Sliding scale contingencies were developed for three levels of project complexity: noncomplex (minor), moderately complex, and most complex (major) projects. The sliding scale contingencies are presented as a final output of this study. This method of estimating contingency provides consistent rationale for estimating contingency. Risks are an inextricable part of the contingency estimating process. Estimators are encouraged to identify and document risks as justification for contingency values applied to a project.

Page generated in 0.129 seconds