• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 36
  • 7
  • 5
  • 1
  • 1
  • Tagged with
  • 62
  • 62
  • 62
  • 44
  • 32
  • 31
  • 29
  • 29
  • 20
  • 13
  • 12
  • 10
  • 10
  • 10
  • 10
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Projektový management / Project management

Kollmann, Ladislav January 2017 (has links)
The master thesis is focused on the topic Project Management. In the theoretical part the literary research is elaborated. The practical part of the thesis provides an analysis of the current state of the project company ZETOR TRACTORS a.s.. On the basis of knowledge of the system, the arrangements are proposed to improve it.
12

Jištění rizik stavebního díla v předinvestiční fázi / Risk Protection of a Built Structure in the Pre-investment Phase

Jandová, Hana January 2013 (has links)
The thesis points out all possible risks that are subsequently secured in a project of firming unpaved roads in cadastral unit Říčky. The theoretical part summerizes the details of the project, risks evident especially during the pre-insvestigation phase of the construction project and ways of solving the possible risks. The practical part deals with the identification of the particular project, includes listing of the risks and concludes with their prevention.
13

The impact of strategic decisions on construction client satisfaction : an assessment framework

Cheng, Jianxi January 2008 (has links)
For some considerable time, client satisfaction has been a problematic issue in the UK construction industry with many projects failing to satisfy the client needs and meet or exceed the client expectations. Client satisfaction is, however, a key performance measure and a major determinant of project success. There is a common belief that strategic decisions made by clients have a significant impact on the levels of client satisfaction. Strategic decisions in the context of construction projects are often associated with project stages including pre-design, design, tender, construction, occupancy & maintenance and disposal and vary in nature. Consequently the impact of strategic decisions on client satisfaction depends as much on timing as on the subjects of the decisions. While such findings are useful to facilitate the industry’s focus on addressing the failure in achieving client satisfaction, and point to the route for improvement, they are arbitrary and do not provide a systematic basis for investigating the real impact on client satisfaction. The nature of strategic decisions and the significance of its impact on client satisfaction have not been clearly identified and client satisfaction has remained an elusive issue for a majority of construction professionals. This research was hence undertaken to seek empirical evidence of an interrelationship between strategic decisions and client satisfaction. Defining strategic decisions, often associated with project stages, as ones that are complex and made under uncertainty and have a long-term impact on project success, a quantitative research methodology combined with qualitative approaches, was adopted in investigating the interrelationship between strategic decisions and client satisfaction. Findings of a detailed literature review revealed that client satisfaction at any stage depends as much on the service quality attributes of service providers including overall service delivery, people of service providers and communications with clients as on the influence of strategic decisions and the client itself. These performance attributes and the groups of strategic decisions, referred as strategic decision cluster (SDC), were further assessed and the relationships between these measures and strategic decisions were examined using factor analysis and multiple regression modelling techniques. Analyses revealed SDCs including Design Approach, Procurement and Implementation predict better the outcomes of service quality and hence higher levels of client satisfaction. Service delivery and communications with clients have a positively significant correlation with the levels of client satisfaction. Of these two attributes, communications with clients makes the largest unique contribution to the variance and is considered the better predictor for client satisfaction. The developed models is validated via external and internal validation and the findings support the thesis that strategic decisions have a impact on client satisfaction by strongly influencing the performance of service quality although causality cannot be assumed. It is recommended that service providers including contractors and consultants devote more efforts to improve their performance on the attributes of service quality identified as having significant association with client satisfaction, particularly service delivery and communications with clients. Further research efforts focusing on providing a practical tool or expert system so as to address the practical issues for a wider range of clients and service providers are also recommended.
14

Simulace průběhu kulturní akce / Simulation of the course of the cultural event

Vávra, Michal January 2009 (has links)
This diploma thesis deals with the question of simulation models. It is divided into the theoretical and practical part. The aim of the opening part, in which the fundamental theory is defined, is to familiarize the readers with the ideas and advantages which simulation models can offer. In its practical part the work already focuses on the particular simulation project which should point out the possibilities of utilization of these models in practice. The subject of this project is the simulation of the course of the cultural event in the O2 Arena stadium. The main goal of this project is creation of the authentic simulation model which would on the basis of the later analysis enable the elimination or optimalization of the predefined major problems that are connected with organizing big cultural events in this arena.
15

Legislativní problematika zpracování pryžového odpadu / Legislative problematics of rubber waste processing

Harant, Petr January 2011 (has links)
This diploma thesis deals with the issue of rubber waste legislative focusing on waste tyres. The aim of the thesis is a thorough analysis of current legislative including newly prepared alterations with emphasis on specific lingering problems. A project of secondary material recycling, which has been created in current legal conditions, will be introduced. The project is assessed in terms of project managment methodology and the thesis concludes by suggesting an ideal project managment approach for realization of similar projects. Close cooperation has been established during realization of the project. At the same time, relevant government offices have been asked for information on the legislative and the whole issue has been consulted with respective offices. The introduction of the thesis familiarizes readers with basic points connected with project managment and tyres characteristics. Subsequently the relevant legislative related to waste tyres is mapped. The last part of the thesis is devoted to secondary material recycling project and its conclusion suggests the course of each of the project's life cycle stage using knowledge of project managment.
16

Projektové řízení se specifiky cestovního ruchu / Project management with the specifics of tourism

Petříčková, Kateřina January 2010 (has links)
The thesis focuses on issues of project management and the project life cycle in tourism. It answers the question what specifics are reflected in projects financed by the European Union in the tourism sector. The thesis evaluated the benefits of selected projects financed by EU funds for the development of tourism and the development of the Czech Republic through the tourism sector.
17

Životní cyklus projektu webové prezentace v sektoru B2B / The life cycle of a website project in the B2B sector

Dušek, Václav January 2017 (has links)
This thesis is focused on realization of a new website division ITreklama of DISKUS company. The creation of this new web solution entails specific needs, mainly due to the business focus on the B2B sector in which the divisional segment falls. The project uses the traditional project management with all relevant instruments to achieve the highest added value. The main objective is the successful launch of the new website and the sub-objectives are identification the needs of the target group and description of the specific requirements for website in B2B business sector. Explanation of the project life cycle, along with the identification of specific needs for a website in the B2B sector, has subsequently serve as a methodology for B2B area of website realization.
18

Úspěšnost projektů financovaných z prostředků EU / The success of projects funded by the EU

Mora, Martin January 2012 (has links)
This thesis is thematically focuses on management of projects financed from EU funds. Goal of this work is in the theoretical part to explain the principles of EU regional policy and possible approaches to project management. The practical part is intended, based on a questionnaire survey, to assess the admissions to the management of projects by recipients of grants from the selected operating program. The thesis is divided, apart from the introduction informing about resolving issues and problems conclusion summarizing lessons learned, to a total of five parts. The first part deals with the principles of economic and social cohesion. The second part explains the continuity of operational programs for structural funds. Approach to the life cycle of the project and project management including management of the subsidy are subsumed in the third part. The fourth section describes the process of project management included a grant from the Operational Program Enterprise and Innovation. Last fifth part evaluates ques-tionnaire survey among recipients of grants from the ICT in enterprises focused on the suc-cess of such supported projects. The paper summarizes the principles of EU regional policy and structural funds, explains the procedures for project management involving the administration of grants and by re-search providing insight into the methods of project management and its impact on the success of projects supported from the ICT in enterprises.
19

Průzkum metod řízení projektů / Research of project management methods

Okrajek, Radek January 2011 (has links)
Abstract The theme of this work is the project management, specifically deployment of different methods of project management. The work theoretically describes the basic project ma-nagement terms and describes the various methods and tools for project management. It also contains a description of techniques and methods for determining the suitability of use in relation to a project and in relation to the stage of the project life cycle.
20

Návrh plánu pro řízení projektu v obci / Project Management in the Municipality

Marečková, Soňa January 2018 (has links)
The diploma thesis focuses on the concept of a project management plan in the municipality Sobůlky. It summarizes the theoretical knowledge according to the IPMA standard and applies them in the proposal section. It contains a questionnaire survey conducted in the municipality and a subsequent comparison of the findings with the proposal of the family folklore afternoon plan.

Page generated in 0.058 seconds