• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1075
  • 528
  • 500
  • 203
  • 80
  • 51
  • 48
  • 42
  • 35
  • 31
  • 26
  • 21
  • 20
  • 10
  • 8
  • Tagged with
  • 2992
  • 2992
  • 527
  • 372
  • 343
  • 334
  • 323
  • 322
  • 317
  • 316
  • 304
  • 247
  • 244
  • 241
  • 240
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
331

the Competence of Non-IT Background Project Manager Leading IT Project

Huang, Yao-Tsung 30 July 2008 (has links)
¡@¡@More and more organisations are increasing the demand of Information Technology (IT) project owing to the rapid technological development in nowadays business environment. With the high growth of IT project, it can cause heavy work-overload for IT Managers, which often resulted in reduction of work productivity. In reality, a considerable number of tasks in organisation are operating by projects. These require more project managers to control. Unfortunately, industry analysis reveals that qualified IT project managers have not increased relatively. Many managers have experience in participation or leading in project management, which portrays those managers have reached a certain extent of competences of project management. It is possible that organisations can select qualified IT managers from those non-IT background managers. ¡@¡@The study will use the theory of focus groups by interviewing some managers, who have the experience in IT project management, to identify the essential competences requirements of a non-IT project manager as being an IT project leader. Meanwhile, analyze the top three competences for IT project managers that usually mentioned by scholars so as to understand the critical impact asnd relationship for the non-IT project managers as leading IT project. ¡@¡@The final conclusion and contribution of this study are as follows: 1. A non-IT project manager should have the "30 competences" in leading the IT related environment. 2. "Communication, planning and control," not only are the basic competences, but also "the most important competences". If the non-IT project manager is lacking these three competences, he is not qualified to be an IT project manager. 3. Compare to an IT project manager, a non-IT project manager is lacking the knowledge and skills within the IT environment. One of the most important aspects is tool capacity, followed by the "IT based knowledge" 4. A non-IT project manager needs a strong ¡§communication skills" to help him strengthen the "planning capacity" and to overcome the inadequate "control capabilities".
332

The space and resource constrained project scheduling problem /

McKendall, Alan R. January 1999 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1999. / Typescript. Vita. Includes bibliographical references (leaves 139-149). Also available on the Internet.
333

The space and resource constrained project scheduling problem

McKendall, Alan R. January 1999 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1999. / Typescript. Vita. Includes bibliographical references (leaves 139-149). Also available on the Internet.
334

How to optimally interdict a belligerent project to develop a nuclear weapon /

Skroch, Eric M. January 2004 (has links) (PDF)
Thesis (M.S. in Operations Research)--Naval Postgraduate School, March 2004. / Thesis advisor(s): Gerald G. Brown. Includes bibliographical references (p. 43-44). Also available online.
335

Surveyors as project managers /

Lomas, D. W. January 1994 (has links)
Thesis (M. Sc.)--University of Hong Kong, 1995. / Includes bibliographical references (leaves 128-133).
336

The adaptation of building consultancy firms in Hong Kong for handling PRC projects /

Chan, Chung-kwong. January 1996 (has links)
Thesis (M. Sc.)--University of Hong Kong, 1996. / Includes bibliographical references.
337

The potential for partnering in Hong Kong construction industry /

Ho, Chui-yin, Liwina. January 1997 (has links)
Thesis (M. Sc.)--University of Hong Kong, 1997. / Includes bibliographical references.
338

Project management of building services engineering in Hong Kong /

Wong, Wai-keung. January 2001 (has links)
Thesis (M. Sc.)--University of Hong Kong, 2001. / Includes bibliographical references.
339

Managerial use of quantitative techniques in building project management : contractors perspectives /

Lin, Chun-ming. January 2000 (has links)
Thesis (M. Sc.)--University of Hong Kong, 2000. / Includes bibliographical references.
340

Correlation between quality management metric and people capability maturity model /

Dahmann, Franz-Dietmar. January 2003 (has links) (PDF)
Thesis (M.S. in Information Technology Management)--Naval Postgraduate School, September 2003. / Thesis advisor(s): John Osmundson, J. Bret Michael. Includes bibliographical references (p. 83-84). Also available online.

Page generated in 0.0987 seconds