• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 18
  • 3
  • Tagged with
  • 24
  • 24
  • 24
  • 24
  • 15
  • 15
  • 12
  • 11
  • 7
  • 7
  • 6
  • 6
  • 5
  • 5
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Performance of the expanded public works programme in a selected department of the Western Cape Provincial Government, South Africa

Sindelo, Lindi Ebegail Vivien January 2019 (has links)
Thesis (MTech (Public Management))--Cape Peninsula University of Technology, 2019. / A socio-economic problem presently facing South Africa is the rate of youth unemployment, which is among the highest in the world. The South African Government has been involved in a number of initiatives, together with the advancement of a labour-intensive Expanded Public Works Programme (EPWP) in order to reduce unemployment and poverty. The EPWP was initiated in 2004 with the aim to place the jobless into productive work in the public sector social services where these EPWP beneficiaries are provided with relevant training and transfer of appropriate skills. However, the EPWP only creates temporary work opportunities that have limited influence on the lives of the beneficiaries. The main objective of the study was to examine the performance of the Youth Work Project (YWP) as an EPWP in a selected department of the Western Cape Provincial Government in order to determine its sustainability of job creation. The secondary aims of the study were to explain the process of the YWP as implemented through the EPWP by a selected department of the Western Cape Provincial Government. A third objective was to examine whether the Public Works employment opportunities enhance subsequent employability of participants once they exit this programme. Fourthly, recommendations was forwarded as to how best the EPWP can be used as a tool for helping unemployed youth with a permanent work opportunity. The sample frame computed of thirteen (13) individuals, therefore purposive sampling was considered the most suitable technique to use in this study. The semistructured interviews were conducted with five (5) management officials responsible for the EPWP and unstructured questionnaires were administered to eight (8) available EPWP beneficiaries placed at a selected department of the Western Cape Provincial Government.
22

The investigation of the management of expanded public works programme (EPWP) towards job creation in Polokwane Local Municipality, Limpopo Province

Mphekgoana, Makhule Joseph January 2016 (has links)
Thesis (MDev.) -- University of Limpopo, 2016 / The introduction of privatisation after 1994 has left many people in Polokwane without employment. The majority of the jobs were given to few people who always provide services through tenders. Most of the departments were no longer hiring people because of the tendering process. The process has made many departments and municipalities to absorb labour force in the public sector. Due to lack of employment in different regions in Limpopo, the provincial Department of Public Works has started an Expanded Public Works Programme (EPWP) to alleviate poverty in the province. However, the management of these projects became a problem to most of the government officials in the municipalities, provincial departments and municipalities are fraught with challenges such as lack of managerial traits, technical and skills related to project management. Polokwane local municipality is not excluded from the above problems, hence the study on the investigation of the management of EPWP towards job creation in Polokwane local municipality. In order to understand the total context of the managerial flaws faced by Polokwane local municipality in Limpopo an in-depth empirical research and interviews were conducted to collect data from government official and employees in the study area. The finding of the study suggests that lack of managerial traits, technical skills, lack of participation, non-compliance with work ethics, monitoring and evaluation were regarded as the greatest challenges in the management of EPWP in Polokwane local municipality. Due to the above challenges, most of the projects are not completed on time because of the lack of qualified project managers. Lack of qualified personnel also contributed to poor quality of service delivery in the area of the study. The study revealed that the projects can alleviate poverty if can be managed and implemented by qualified managers and employees with relevant skills. Therefore, the study calls for the Department of Public Works to appoint qualified and experienced civil engineers to monitor and evaluate the implementation of EPWP projects in Polokwane local municipality.
23

Towards the effective implementation of the expanded public works programme in South African municipalities : a case study of the City of Tshwane Metropolitan Municipality

Moeti, Lucas 14 July 2014 (has links)
The Extended Public Works Programme (EPWP) is a government programme targeted at unemployed individuals. Public entities at the national, provincial and municipal level implement the EPWP. The City of Tshwane Metropolitan Municipality (CTMM) is one of the entities implementing the EPWP at the local level. This study investigated the implementation of the EPWP within the CTMM with a view to understand the current implementation approach. The CTMM has been unable to achieve their EPWP annual targets since 2009. The CTMM experienced the lack of attaining targets mainly in relation to persons with disabilities (2%), and indigents (50%). Other challenges include the lack of training EPWP participants in specialized skills; the unsustainable nature of the EPWP projects; and un-approval of the draft EPWP policy. This study proposes interventions with regard to the coordination of the EPWP, improved monitoring of projects, training, indigent criteria, and approval of the EPWP policy within the CTMM. / Development Studies / M.A. (Development Studies)
24

Towards the effective implementation of the expanded public works programme in South African municipalities : a case study of the City of Tshwane Metropolitan Municipality

Moeti, Lucas 14 July 2014 (has links)
The Extended Public Works Programme (EPWP) is a government programme targeted at unemployed individuals. Public entities at the national, provincial and municipal level implement the EPWP. The City of Tshwane Metropolitan Municipality (CTMM) is one of the entities implementing the EPWP at the local level. This study investigated the implementation of the EPWP within the CTMM with a view to understand the current implementation approach. The CTMM has been unable to achieve their EPWP annual targets since 2009. The CTMM experienced the lack of attaining targets mainly in relation to persons with disabilities (2%), and indigents (50%). Other challenges include the lack of training EPWP participants in specialized skills; the unsustainable nature of the EPWP projects; and un-approval of the draft EPWP policy. This study proposes interventions with regard to the coordination of the EPWP, improved monitoring of projects, training, indigent criteria, and approval of the EPWP policy within the CTMM. / Development Studies / M. A. (Development Studies)

Page generated in 0.0598 seconds