• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 26
  • 5
  • 1
  • Tagged with
  • 30
  • 30
  • 9
  • 9
  • 8
  • 7
  • 7
  • 7
  • 7
  • 6
  • 5
  • 5
  • 4
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Rock quarries and the manufacture, trade, and uses of stone tools and symbolic stones in the Central Highlands of Irian Jaya, Indonesia ethnoarchaeological perspectives /

Hampton, Orville Winston. January 1997 (has links)
Thesis (Ph. D.)--Texas A & M University, 1997. / Vita. Includes bibliographical references (leaves 855-881).
22

Lithic raw material procurement and the social landscape in the Central Mesa Verde Region, A.D. 600-1300

Arakawa, Fumiyasu, January 2006 (has links) (PDF)
Thesis (Ph. D.)--Washington State University, December 2006. / Includes bibliographical references (p. 314-334).
23

A chip off the old block : investigations of a Maritime Archaic lithic workshop/quarry site in Big Brook (EjBa-2), northwestern Newfoundland /

Beaton, Gregory, January 2004 (has links)
Thesis (M.A.)--Memorial University of Newfoundland, 2004. / Bibliography: leaves 122-133.
24

Mining and environmental factors in selecting an underground versus a quarry mining system

Haycocks, Scott Gavin 30 March 2010 (has links)
Historically, the decision on whether to mine by underground or surface methods has been based on mining and economic considerations. This is rapidly changing since the environmental imperatives that have evolved over the past two decades are now a critical part of the decision process. As a result, quarry operations are increasingly considering the option of going underground. This research was carried out to identify the factors which would cause a surface quarry operator to consider the transition to underground mining. To identify the major incentives for going underground, primary factors influencing the decision for selecting underground mining over continued quarrying were investigated. Analysis of the literature and data gathered from site visits showed that significant benefits could be gained from mining underground, with respect to selected economic factors, environmental permitting and legal compliance, and post-production site usage for continued income. To determine mining characteristics of the typical surface quarry, data on the production phase (mining sequence) and environmental problems was collected from 18 quarries at various stages of their operating life spans. The data was obtained from sites in the Appalachian region of four states: Virginia, West Virginia, Maryland and Tennessee. Corresponding data was also gathered from successful underground operations to determine the values for a typical underground mine. Comparisons of this information indicated that the biggest differences between surface and underground operations existed in: the drilling and blasting phase, and in the haulage phase of the mining sequence; the size of the equipment; the extent of environmental concerns; and the potential for post-production income from the site. The process of environmental risk assessment was reviewed as a supporting tool to aid in the selection of underground over surface mining. By assigning probabilities of failure to specific, independent, environmental hazards, an operator can evaluate and compare the likelihood of success or failure operating as a quarry or underground mine. A case study from the data collected was used as an example to show how the procedure can be practically implemented. / Master of Science
25

Improved quarry design using deterministic and probablistic techniques

Bullock, John C. 10 November 2009 (has links)
Limestone and dolomite quarries were mapped to determine specific slope failure mechanisms for the various geological and structural conditions. Wedge failure and plane failure were determined to be the most influential mechanisms. Algorithms for analyzing these mechanisms were incorporated into the software package PSLOPE. The program is designed to facilitate progressive stability evaluation of quarry high walls as mining continues and permits calculation of safety factors and probabilistic reliability. Safety factor evaluations with the potential for back-analysis and sensitivity studies are included to investigate alternative high wall designs. Reliability analysis using Monte Carlo sampling minimizes uncertainty and allows the use of all available data in a stability evaluation. E~tensive "help" menus are incorporated into the program. The "help" menus include ranges of physical properties such as cohesion and friction angle for specific lithologic units determined from published research. This package includes an optimum design protocol that can be followed to avoid massive failure. The program was developed in conjunction with the quarry industry and is demonstrated through technical problem solving and a detailed case study. A large carbonate quarry in the eastern U.S. was studied in detail to demonstrate the utility of PSLOPE. / Master of Science
26

Archaeological analysis of bedded-chert lithic procurement at the Warsaw Quarries, Coshocton County, Ohio

Diersen, Christopher John January 1996 (has links)
The Warsaw Quarries of Coshocton County, Ohio, virtually ignored since Holmes' landmark papers of 1919, are investigated to achieve several goals: 1) to create a revised general typology of the material culture of bedded-chert lithic procurement sites; 2) to demonstrate that the occurrence of radiocarbon samples at lithic procurement sites is the norm rather than the exception; 3) to clarify the nature of activity at the site through a synthesis of functional and attribute analyses of material recovered from a peripheral spoils ridge; 4) to demonstrate that data collected at procurement sites by surface collection constitutes an insufficient database for analysis; 5) to test an hypothesis that the presumed absence of classic site elements (stratigraphy, diagnostic artifacts, dateable material) is incorrect. Since the completion of late 19`h and early 20`h century work in the field, analysis of quarry sites in North America has been limited to sporadic and usually very subject-specific research. By neglecting to evaluate the overall nature and function of lithic procurement sites, recent work has relegated lithic procurement to a sub-field of only secondary interest to archaeologists. / Department of Anthropology
27

Ecological restoration and urban frige park development at Anderson Road Quarry

Tai, Kai-wai, Thomas., 戴繼尉. January 2009 (has links)
published_or_final_version / Architecture / Master / Master of Landscape Architecture
28

The geology of the building stone of Cedar Park and vicinity

Barrow, Leonidas Theodore 07 November 2012 (has links)
Not available / text
29

Case studies of environmental impacts of sand mining and gravel extraction for urban development in Gabarone

Madyise, Tariro 10 1900 (has links)
Economic development is one of the main objectives of developed and developing nations worldwide. Development comes with growth of urban areas. Urban growth is achieved through sand and gravel mining for construction of modern, attractive and durable structures. The study examined positive and negative environmental impacts of the continuous removal of river sand, pit sand and gravel from sampled rivers and open areas surrounding Gaborone developing Central Business District, malls and private properties in city. Quantitative and qualitative research designs that is questionnaire survey, oral interviews, field observation and measurements were used to collect data from selected sampled points. Metsimotlhabe and Ditlhakane rivers were selected because they are nearer to Gaborone and most river sand is mined from these rivers. More points were sampled from open areas in Kumakwane, Kopong and Bela Bela farms where pit sand and gravel are mined. Convenience and purposive sampling methods were used to pick questionnaire survey respondents (175) from Kumakwane and Metsimotlhabe villages where people affected lives. Findings of the study highlighted that river sand was mined most from rivers near Gaborone compared to pit sand and gravel because of its multi uses. Mining is important for economic development, to construct durable, modern structures, employment creation and revenue collection but removal of river sand leads to deepening and widening of rivers. Artificial rivulets are formed as resource is extracted uncontrollably. Pit sand and gravel are extracted from open areas creating uncovered deep pits, which caused of accidents to children and livestock. Erosion and environmental degradation occur due to continuous mining. Miners dispose waste on open areas and riverbeds causing land pollution. Dust and noise pollution from tipper trucks ferrying sand and gravel are a cause of concern to villagers as the trucks move even at night, disturbing sleep. Solutions to uncontrolled mining include 24 hour security and regular raids on illegal miners. The author recommends that heavy penalties should be imposed to curb illegal mining. High level decision making forum involving all stakeholders is necessary to discuss problems of illegal mining and how to limit negative impacts. Department of Mines need to develop an Environmental Management Plan and a close monitoring program nationwide. / Environmental Sciences / M. Sc. (Environmental Management)
30

Case studies of environmental impacts of sand mining and gravel extraction for urban development in Gabarone

Madyise, Tariro 10 1900 (has links)
Economic development is one of the main objectives of developed and developing nations worldwide. Development comes with growth of urban areas. Urban growth is achieved through sand and gravel mining for construction of modern, attractive and durable structures. The study examined positive and negative environmental impacts of the continuous removal of river sand, pit sand and gravel from sampled rivers and open areas surrounding Gaborone developing Central Business District, malls and private properties in city. Quantitative and qualitative research designs that is questionnaire survey, oral interviews, field observation and measurements were used to collect data from selected sampled points. Metsimotlhabe and Ditlhakane rivers were selected because they are nearer to Gaborone and most river sand is mined from these rivers. More points were sampled from open areas in Kumakwane, Kopong and Bela Bela farms where pit sand and gravel are mined. Convenience and purposive sampling methods were used to pick questionnaire survey respondents (175) from Kumakwane and Metsimotlhabe villages where people affected lives. Findings of the study highlighted that river sand was mined most from rivers near Gaborone compared to pit sand and gravel because of its multi uses. Mining is important for economic development, to construct durable, modern structures, employment creation and revenue collection but removal of river sand leads to deepening and widening of rivers. Artificial rivulets are formed as resource is extracted uncontrollably. Pit sand and gravel are extracted from open areas creating uncovered deep pits, which caused of accidents to children and livestock. Erosion and environmental degradation occur due to continuous mining. Miners dispose waste on open areas and riverbeds causing land pollution. Dust and noise pollution from tipper trucks ferrying sand and gravel are a cause of concern to villagers as the trucks move even at night, disturbing sleep. Solutions to uncontrolled mining include 24 hour security and regular raids on illegal miners. The author recommends that heavy penalties should be imposed to curb illegal mining. High level decision making forum involving all stakeholders is necessary to discuss problems of illegal mining and how to limit negative impacts. Department of Mines need to develop an Environmental Management Plan and a close monitoring program nationwide. / Environmental Sciences / M. Sc. (Environmental Management)

Page generated in 0.0664 seconds