Spelling suggestions: "subject:"desk"" "subject:"bpsk""
161 |
Credit risk & forward price models /Gaspar, Raquel M., January 2006 (has links)
Diss. Stockholm : Handelshögskolan, 2006.
|
162 |
Improving the U.S. Navy's execution of technical authority through a common risk management and technical assessment processTomaiko, Thomas Andrew. January 2008 (has links) (PDF)
Thesis (M.S. in Systems Engineering Management)--Naval Postgraduate School, September 2008. / Thesis Advisor(s): Matthews,, David F. ; Roberts, Benjamin J. "September 2008." Description based on title screen as viewed on November 5, 2008. Includes bibliographical references (p. 89). Also available in print.
|
163 |
Applying risk management to reduce the time in lay-up while increasing the cost effectiveness of a Nimitz (CVN 68) class aircraft carrier in dry dock during the execution phase of a refueling and complex overhaulRahming, Kiah Bernard. January 2009 (has links) (PDF)
Thesis (M.S. in Systems Engineering)--Naval Postgraduate School, March 2009. / Thesis Advisor(s): Langford, Gary O. "March 2009." Description based on title screen as viewed on April 23, 2009. Author(s) subject terms: Systems Engineering Process, Risk Management, Risk Analysis, Risk Matrix, Cost Effectiveness, Time Effectiveness, Refueling and Complex Overhaul. Includes bibliographical references (p. 111-114). Also available in print.
|
164 |
Fire regime parameters and their relationships with topography in the east side of the Southern Oregon Cascade Range /Foster, John S. January 1900 (has links)
Thesis (M.S.)--Oregon State University, 1999. / Typescript (photocopy). Includes bibliographical references (leaves 58-64). Also available on the World Wide Web.
|
165 |
Analyzing C2 Greyhound capacity at Fleet Readiness Center Southwest (FRC SW)Dewar, Althea C. Savanh, Bobby. January 2009 (has links) (PDF)
"Submitted in partial fulfillment of the requirements for the degree of Master of Business Administration from the Naval Postgraduate School, June 2009." / Advisor(s): Heath, Susan ; Euske, Kenneth. "June 2009." "MBA professional report"--Cover. Description based on title screen as viewed on July 14, 2009. DTIC Identifiers: CPI (Continuous Process Improvement), C2 Greyhound, capacity analysis, process flow. Author(s) subject terms: C2 Greyhound; Capacity Analysis; AirSpeed Toolset; Process Flow; Precedence Diagram; Work Breakdown Structure (WBS); PMI3 Includes bibliographical references (p. 43-44). Also available in print.
|
166 |
The perception of risk in sport activitiesMun, SunHo. Jackson, E. Newton. January 1900 (has links)
Thesis (Ph. D.)--Florida State University, 2004. / Advisor: Dr. E. Newton Jackson Jr., Florida State University, College of Education, Dept. of Sport Management, Recreation Management, and Physical Education. Title and description from dissertation home page (viewed Sept. 24, 2004). Includes bibliographical references.
|
167 |
A theory of pure risk management in the business firmGahin, Mohammed Fikry Shehata Soliman, January 1966 (has links)
Thesis (Ph. D.)--University of Wisconsin, 1966. / Typescript. Vita. eContent provider-neutral record in process. Description based on print version record. Bibliography: leaves 246-251.
|
168 |
Uncertainty, risk and trust in the Russian credit card and insurance market /Guseva, Alevtina Vladimirovna. January 2002 (has links)
Thesis (Ph. D.)--University of California, San Diego, 2002. / Vita. Includes bibliographical references (leaves 268-289).
|
169 |
Accounting numbers and the perceived risk class of Hong Kong companies /Selvaratnam, Ratnajothy Maharajendra. January 1996 (has links)
Thesis (Ph. D.)--University of Hong Kong, 1996. / Includes bibliographical references.
|
170 |
Risk assessment of adopting agroforestry in a peasant economy : the Hondurian case /Arias Garcia, Freddy, January 1996 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1996. / Typescript. Vita. Includes bibliographical references (leaves 179-188). Also available on the Internet.
|
Page generated in 0.066 seconds