Spelling suggestions: "subject:"railroadsin"" "subject:"railroading""
51 |
Evaluating mega urban transport project: planning implications of West Rail鄭沛勤, Cheng, Pui-kan. January 2008 (has links)
published_or_final_version / Urban Planning and Environmental Management / Master / Master of Science in Urban Planning
|
52 |
Speed competition in an affluent and densely-populated city: a case study of bus transport in HongKongChu, Kut-fai, Michael., 朱吉輝. January 1997 (has links)
published_or_final_version / Geography and Geology / Master / Master of Philosophy
|
53 |
A study of the Airport Express Railway: its functions and viabilityShek, Chi-ming., 石志明. January 2001 (has links)
published_or_final_version / Transport Policy and Planning / Master / Master of Arts in Transport Policy and Planning
|
54 |
Railway and sustainable development: socio-economic and land use impacts of west rail on Yuen Long town何文思, Ho, Man-sze. January 2009 (has links)
published_or_final_version / Urban Planning and Design / Master / Master of Science in Urban Planning
|
55 |
盛宣懷與鐵路總公司. / Sheng Xuanhuai yu tie lu zong gong si.January 1971 (has links)
Thesis (M.A.)--香港中文大學. / Manuscript. / Includes bibliographical references (p. 194-209). / Thesis (M.A.)--Xianggang Zhong wen da xue. / Chapter 第一章 --- 概論 --- p.5 / Chapter 第二章 --- 鐵路總公司的成立 --- p.18 / Chapter 第一節 --- 甲午戰爭前盛宣懷的事業 --- p.18 / Chapter 第二節 --- 鐵路總公司的成立經過 --- p.24 / Chapter 第三節 --- 盛宣懷督辦鐵路總公司 --- p.28 / Chapter 第三章 --- 鐵路總公司經營的主要鐵路 --- p.42 / Chapter 第一節 --- 列強在華鐵路建築權的爭奪戰 --- p.42 / Chapter 第二節 --- 蘆漢鐵路 --- p.48 / Chapter 第三節 --- 滬寧鐵路 --- p.70 / Chapter 第四節 --- 道清鐵路 --- p.75 / Chapter 第五節 --- 正太鐵路與汴洛鐵路 --- p.80 / Chapter 第四章 --- 鐵路總公司經營鐵路的資本來源 --- p.136 / Chapter 第一節 --- 鐵路外債 --- p.136 / Chapter 第二節 --- 舉借外債的原因 --- p.140 / Chapter 第五章 --- 鐵路總公司的撤銷與郵傳部的成立 --- p.158 / Chapter 第一節 --- 盛宣懷的失勢與鐵路總公司的撤銷 --- p.158 / Chapter 第二節 --- 郵傳部的成立 --- p.168 / Chapter 第六章 --- 結論 --- p.186
|
56 |
Light rail, infrastructure utilization.January 2005 (has links)
Man Siu Fun. / "Architecture Department, Chinese University of Hong Kong, Master of Architecture Programme 2004-2005, design report." / Includes bibliographical references (leaf 56). / Part 1 / Thesis Proposal / Site History / Site Constraints / Deisgn Strategy / Design Goal / Design Validity / Case Study / Part 2 / Tuen Mun Site Analysis / Design Potentials and Issues / Part 3 / Thesis Statment / Site Selection / Site Analysis / Site Intervention / Part 4 / Design Process / Part 5 / Final Drawings
|
57 |
The role of the mass transit system in private housing development in Hong KongKwok, Alice., 郭雅莉. January 1998 (has links)
published_or_final_version / Housing Management / Master / Master of Housing Management
|
58 |
The location of the express rail link station in Hong Kong and its impacts on travel patternsLiu, Li, 刘俐 January 2010 (has links)
published_or_final_version / Transport Policy and Planning / Master / Master of Arts in Transport Policy and Planning
|
59 |
TOD and travel behavior in Hong Kong: a studyon the effectiveness and better usage of the current railway systemMTRCheung, Chui-ying., 張翠盈. January 2011 (has links)
published_or_final_version / Urban Planning and Design / Master / Master of Science in Urban Planning
|
60 |
Implications of an integrated rail-property development model on livability: the case study of Hong KongCheung, Ling-chi., 張齡芝. January 2011 (has links)
published_or_final_version / Urban Planning and Design / Master / Master of Science in Urban Planning
|
Page generated in 0.0511 seconds