Spelling suggestions: "subject:"recreation areas."" "subject:"decreation areas.""
31 |
An approach to urban recreation planningMiller, Keith Frederick January 1981 (has links)
This thesis addresses the problem of determining urban park and facility requirements. Traditionally, the standards approach has been used, however not only does it oversimplify the problem it also fails to reflect the diverse characteristics of urban populations. Standards are insensitive to the availability of community land and financial resources, and often lead to park and facility requirements which are unrealistic, uneconomical and unattainable. Furthermore, they are inadequate for determining development priorities and for making allocation decisions among facilities and planning areas.
Although there has been a growing interest in developing methods which determine space needs for non-urban parks, little of this research has been directed toward urban settings. Methods which have been developed translate recreation participation into space required to accommodate expected peak users, taking into account capacity factors. They attempt to estimate space demands which reflect the diverse characteristics, interests and resources of communities. Although an improvement on standards, deficiencies still exist. Participation is used as a measure, thereby producing requirements which reflect the status quo. Imbalances in supply are perpetuated. Severe limitations for determining priorities and making allocation decisions also result from these methods.
This thesis has developed an alternative method; a hybrid of methods previously developed. Recreation activities have been classified into parks and facilities which are accommodated in a hierarchy of service areas. A process then translates participation into unit and space requirements for parks and facilities by service areas. A computer program was written to demonstrate the method's applicability in a practical situation and the method applied to data collected in Richmond, B.C. Determined for Richmond service areas was:
amount of space required for parks and facilities, parkland and facility deficiencies, and
land and facility costs, cost per peak hour user and the number of peak users which can be accommodated in individual parks and facilities.
As a planning tool, this method determines requirements which reflect specific activity participation and interests of populations in various service areas and available land resources. Development costs for parks and facilities are provided which enable a realistic assessment of the feasibility of development according to available financial resources. Development priorities and allocation decisions can also be made.
The approach developed in this thesis has a number of uses in recreation system and site planning. However, rather than a panacea for decision making, it provides information to aid decision making. It is nevetheless, far from perfect. Several limitations could be improved upon. For instance, more research is needed to enable the development of a comprehensive park and facility classification system for urban areas. The measurement of participation and use patterns could be improved. Also capacity estimates should consider the impact of use on site deterioration while operating cost impacts of recreation development should be considered in addition to capital costs.
Although imperfect, the method developed in this thesis is a useful planning tool for determining urban park and facility requirements. The author hopes it may find practical application. / Applied Science, Faculty of / Community and Regional Planning (SCARP), School of / Graduate
|
32 |
Factors associated with willingness of private woodland owners in Ohio to provide outdoor recreation facilities /McCurdy, Dwight R. January 1964 (has links)
No description available.
|
33 |
An empirical study of urban recreation units : playgrounds as central places /Mitchell, Lisle Serles January 1967 (has links)
No description available.
|
34 |
Outdoor recreational resource development through vocational agriculture and the cooperative extension service /Smith, Wendell Lee January 1969 (has links)
No description available.
|
35 |
User input into the design of a children's recreation area.Francis, Adam B., 1951- January 1978 (has links)
No description available.
|
36 |
UNCERTAIN RECREATION QUALITY AND CONTINGENCY CONTRACTING: IMPLICATIONS FOR WILDLIFE VALUATION AND QUESTIONNAIRES DESIGN (ARIZONA).Chong, Teik Ee, 1952- January 1985 (has links)
No description available.
|
37 |
Vibrant green spine and constructed wetland in Tuen Mun RiverChow, Siu-hang. January 2007 (has links)
Thesis (M. L. A.)--University of Hong Kong, 2007. / Title proper from title frame. Includes special report study entitled: Constructed wetland for wildlife, drainage and sewage treatment. Also available in printed format.
|
38 |
Repulse bay commercial redevelopment /King, Jun-ping, Christopher. January 1996 (has links)
Thesis (M. Arch.)--University of Hong Kong, 1996. / Includes bibliographical references.
|
39 |
Pokfulam Reservoir Park /Chow, Yun-tong. January 1995 (has links)
Thesis (M.L.A.)--University of Hong Kong, 1995. / Includes special study report entitled: A study of landscape treatment on reservoir margin. Includes bibliographical references.
|
40 |
An urban space re-creation : Southorn Playground /Or, Kar-lok, Carol. January 1999 (has links)
Thesis (M. Arch.)--University of Hong Kong, 1999. / Includes special report study entitled: The sense of experiences in Hong Kong. Includes bibliographical references.
|
Page generated in 0.1035 seconds