• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • No language data
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Measurement and Verification - Retro-Commissioning of a LEED Gold Rated Building Through Means of an Energy Model: Are Aggressive Energy Simulation Models Reliable?

Marmaras, Justin M 29 August 2014 (has links)
During the construction of the new 3 story, 25,000+ square foot police station, a decision was made to participate in the LEED program to ensure the building had low operating costs, reduced emissions, conserved water and overall energy. The design of the building includes a primary-secondary ground source heat pump (GSHP) loop, a Dedicated Outside Air System (DOAS) with Energy Recovery Ventilation (ERV) wheel, all controlled by CO2 monitoring through Demand Control Ventilation (DCV) to supply heat pumps located in each space; all monitored by a Building Automation System (BAS). The building’s future energy performance was predicted through an energy simulation model (ESM) software. Measurement and verification (M&V) was then performed on the building to determine its actual energy performance. Data was collected through the building’s electrical meters, the building automation system (BAS), and other techniques to determine discrepancies. Installed electrical submetering along with ESM results helped identify faults on a subcomponent level. This bottom up approach helped drive a successful retro-commissioning of the building systems reducing energy consumption. This thesis will detail a methodology for retro-commissioning of underperforming new-construction buildings. Optimization of the building’s systems will be facilitated through utilization of the M&V and ESM data. Discussed will be techniques and strategies to benchmark the building’s systems, providing utility from the retro-commissioning and M&V results, to determine the value of the ESM. Last will be to discuss and demonstrate the future benefits of utilizing this real-time data to help building operators reduce, manage, and sustain their energy consumption profiles.

Page generated in 0.0672 seconds