471 |
Příprava realizace výstavby Aktivního centra v Ratíškovicích / Preparation of the construction of the Active Center in RatíškovicePrágr, Michal January 2019 (has links)
The subject of my diploma thesis is preparation of realization of Active center. Diploma thesis includes technological regulation for concrete constructions and the roof, project of machine set, the inspecting and testing plans, plan of BOZP, the budget and the time table of main construction object. I alson did the project of the building site facilities and drawings needed.
|
472 |
Skladový areál firmy Bidfood - stavebně technologický projekt / Bidfood warehouse - a construction technology projectŠpaček, Miroslav January 2020 (has links)
The goal of the thesis is a construction technological project of a Bidfood warehouse. Part of the work is the solution of technological regulation for drilled piles and assembly of steel skeleton, organization of the construction, construction site equipment plan, draft of the main machinery and mechanisms. Technical report, coordination layout with a description of transport options, schedule, and financial plan are also part of this thesis.
|
473 |
Analýza synchronního stroje s permanentními magnety o výkonu 1,1 MW / Analysis of 1,1 MW permanent magnet synchronous motorHomolová, Romana January 2020 (has links)
This thesis deals with the elaboration of The Permanent Magnet Synchronous Motor and the calculation of its parameters. In the first part, the construction and used permanent magnets of this motor are listed here. The next part of the thesis contains a short overview of the stator windings, the calculation of the winding factors and calculation of the basic parameters of the stator winding. The calculation of the magnetic induction in the air gap is also illustrated here. The result is recalculated by using the Carter factor and then the value of the first harmonics of air-gap flux density is determined. The result is compared with the analysis in the program FEMM. The next part of the thesis is creating a comprehensive overview of the machine using a replacement circuit diagram and phasor diagrams. Finally, the thesis contains model created in RMxprt and ANSYS Maxwell. The results of the model analysis are compared with the analytical calculation
|
474 |
Stavebně technologický projekt přípravy a realizace požární stanice v Jaroměři / Construction Project for Station of Fire and Rescue Services in JaroměřNývlt, Josef Unknown Date (has links)
The objective of this diploma thesis is the processing of the construction technology design as a part of the preparation and implementation of the fire station in Jaroměř. It is a new construction of the main building, which is supplemented by other objects and engineering buildings. The thesis deals with complex design of the implementation of the construction and then focuses in more detail on the installation of the supporting frame structure, which consists of reinforced concrete prefabricated elements. The whole project also includes a technical report on the construction technology project, a study of the implementation of the main technological stages of the main building, solutions for transport routes for construction supply, construction site design, machine set design, technological regulations with assembly diagrams, control and test plan, time plans and balance of resource needs, itemized budget and occupational safety and health plan. The diploma thesis is supplemented by a specialized part dealing with the reconstruction of the area road with a bituminous cover and the implementation of other paved areas within the area of the fire station.
|
475 |
Laboratorní zdroj s vysokou účinností / High efficiency laboratory power supplyTejmlová, Lenka January 2011 (has links)
The project shows the problems of power supply in electrical engineering. It describes the general parameters of these types of supplies and presents their characteristics. Based on these findings, it is also focused on the selection of specific elements of the laboratory supply, to reach the given parameters. It contains the recalculations of the parameters of other additional components. The overall scheme of the supply is divided into several blocks, thematically corresponded to subchapters. According to the accomplished concept the laboratory supply is realized and its parameters had been tested. Projects results are assessed at the end.
|
476 |
Analýza vlivu mechanického momentu asynchronního stroje na sycení magnetického obvodu / Mechanical Torque Analysis of Induction Machine Based on Magnetic Circuit SaturationSkalka, Miroslav January 2011 (has links)
e main goal of this thesis is mechanical torque analysis of induction machine based on magnetic circuit saturation, oversaturated areas classification and the possibility of oversaturated areas reduction of their influence on machine properties. Whole problem is solved by finite element method in ANSYS program. Work is divided into the description and creating of electromagnetic model, a method of the induction machine equivalent circuit parameters determination, the electromagnetic field calculation by finite element method, experimental measurement using LabVIEW program with measurement accessories (PCIe card National Instruments), data processing program in DIAdem, results analysis of calculations in terms of magnetic circuit saturation, the influence of magnetic circuit material based on electromagnetic field distribution and the magnetic flux density along the air gap including spectral analysis using MATLAB and the electromagnetic torque and its parasitic torque components calculation.
|
477 |
Syntaxí řízený překlad založený na hlubokých zásobníkových automatech / Syntax-Direxted Translation Based on Deep Pushdown AutomataSolár, Peter Unknown Date (has links)
This thesis introduces syntax-directed translation based on deep pushdown automata. Necessary theoretical models are introduced in the theoretical part. The most important model, introduced in this thesis, is a deep pushdown transducer. The transducer should be used in syntax analysis, significant part of translation. Practical part consists of an implementation of simple-language interpret based on these models.
|
478 |
Rámová konstrukce atypického půdorysu / The Frame Construction of Atypical Floor PlanSlanina, Bohumil January 2016 (has links)
The thesis describes the analysis and design part of reinforced concrete frame structure. Calculation was made by program SCIA Engineer and verified by manual calculations using simplified methods. Static solution includes an assessment of floor slabs, columns and stairs. The output is then individual drawings of reinforcement. The thesis also includes a study determining the effective width for single rib.
|
479 |
Vyhodnocení penzijních fondů s využitím fuzzy logiky / The Evaluation of Pension Funds with the Usage of Fuzzy LogicJesenská, Alžbeta January 2016 (has links)
Cielom diplomovej prace je vytvorenie expertného systému založeného na modeloch fuzzy logiky v programoch Excel a MATLAB, pomocou ktorého je možné ohodnotiť rôzne dôchodkové fondy a ďalšie finančné produkty. Vzhľadom na prehlbujúcu sa demografickú krízu, práca ponúka návrhy optimálneho investičného mixu pre tri modelové situácie s cieľom dodatočného finančného zabezpečenia počas dôchodkového veku. Práca je spracovaná pre podmienky Slovenskej republiky, podľa súčasnej situácie a platnej legislatívy.
|
480 |
Výrobní areál LIWA v Pelhřimově - příprava realizace a řízení stavby / LIWA manufacturing facility in Pelhřimov - implementation of constructionJůn, Michal January 2017 (has links)
The aim of the thesis is the process of building technological project LIWA manufacturing facility in Pelhřimov. It deals mainly a technological process for the realization of the main building. The thesis contains a technical report, technological specification, control and test plan. Other parts of the work are time and financial plan, machine and mechanic design, project about equipment of construction site and time schedule. The annexes are further addressed drawings of the building site equipment.
|