• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1765
  • 506
  • 222
  • 176
  • 60
  • 39
  • 30
  • 27
  • 24
  • 21
  • 19
  • 17
  • 16
  • 11
  • 11
  • Tagged with
  • 3476
  • 610
  • 478
  • 464
  • 414
  • 409
  • 395
  • 378
  • 317
  • 271
  • 261
  • 248
  • 239
  • 238
  • 232
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
541

Examining the effects of scheduled course time on mathematics achievement in high school students

Mallory, Kelli, D. Harrell, Pamela Esprivalo, January 2007 (has links)
Thesis (Ed. D.)--University of North Texas, May, 2007. / Title from title page display. Includes bibliographical references.
542

Highway earthwork and pavement production rates for construction time estimation

Kuo, Yao-chen, January 2004 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 2004. / Vita. Includes bibliographical references (p. 329-334). Also available online via the University of Texas Libraries website (http://www.lib.utexas.edu/).
543

Gain scheduling via control signal interpolation the ball and beam example.

Ignatov, Rouslan. January 2002 (has links)
Thesis (M.S.)--Ohio University, 2002. / Title from PDF t.p.
544

An evolutionary algorithm approach for assembly job shop scheduling with lot streaming technique

Wong, Tse-chiu. January 2007 (has links)
Thesis (Ph. D.)--University of Hong Kong, 2008. / Also available in print.
545

Solving the timetabling problem using constraint satisfaction programming

Zhang, Lixi. January 2005 (has links)
Thesis (M.Info.Sys)--University of Wollongong, 2005. / Typescript. Includes bibliographical references: leaf 84-87.
546

Using data mining to explore the regularity of genetic algorithms in job shop schedule problems

Tsai, Shi-Chi. January 1997 (has links)
Thesis (M.S.)--Ohio University, November, 1997. / Title from PDF t.p.
547

Adaptive dispatching using genetic algorithms for multiple resources

Wongsavengwate, Pisamai. January 1997 (has links)
Thesis (M.S.)--Ohio University, March, 1997. / Title from PDF t.p.
548

Product scheduling for the makespan problem with sequence dependent setup times

Cura, Boris. January 1993 (has links)
Thesis (M.S.)--Ohio University, August, 1993. / Title from PDF t.p.
549

New algorithms for on-line scheduling

Chan, Ho-leung. January 2007 (has links)
Thesis (Ph. D.)--University of Hong Kong, 2007. / Title proper from title frame. Also available in printed format.
550

Multi-objective optimization of manufacturing processes design /

El-Sayed, Jacqueline Johnson, January 1997 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1997. / Typescript. Vita. Includes bibliographical references (leaves 77-85). Also available on the Internet.

Page generated in 0.0759 seconds