Spelling suggestions: "subject:"cheduling."" "subject:"ascheduling.""
551 |
A method for solving the minimization of the maximum number of open stacks problem within a cutting processPoliquit, Elmer S. January 2008 (has links) (PDF)
Thesis (M.S.)--University of North Carolina Wilmington, 2008. / Title from PDF title page (viewed September 24, 2008) Includes bibliographical references (p. 46-47)
|
552 |
Railway timetable generationOdijk, Michiel Adriaan, January 1900 (has links)
Thesis (doctor)--Technische Universiteit Delft, 1997. / "NUGI 811"--T.p. verso. Vita. Includes bibliographical references (p. 149-159).
|
553 |
Multi-objective optimization of manufacturing processes designEl-Sayed, Jacqueline Johnson, January 1997 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1997. / Typescript. Vita. Includes bibliographical references (leaves 77-85). Also available on the Internet.
|
554 |
Economic lot scheduling with stochastic demands and lost sales /McKay, Mark. January 1999 (has links)
Thesis (Ph. D.)--University of Washington, 1999. / Vita. Includes bibliographical references (leaves [55]-60).
|
555 |
Heuristic scheduling of low acuity patients at the emergency departmentKhadndekar, Shashank. January 2007 (has links)
Thesis (M.S.)--State University of New York at Binghamton, Department of Systems Science and Industrial Engineering, 2007. / Includes bibliographical references (leaves 121-125).
|
556 |
Stochastic resource constrained project scheduling with stochastic task insertions problemsArcher, Sandra. January 2008 (has links)
Thesis (Ph.D.)--University of Central Florida, 2008. / Advisers: Robert L. Armacost, Julia Pet-Armacost. Includes bibliographical references (p. 405-416).
|
557 |
On-line scheduling with constraints /Zhang, Lele. January 2009 (has links)
Thesis (Ph.D.)--University of Melbourne, Dept. of Mechanical Engineering, School of Engineering, 2009. / Typescript. Includes bibliographical references (p. 177-184)
|
558 |
Railway timetable generationOdijk, Michiel Adriaan, January 1900 (has links)
Thesis (doctor)--Technische Universiteit Delft, 1997. / "NUGI 811"--T.p. verso. Vita. Includes bibliographical references (p. 149-159).
|
559 |
Highway earthwork and pavement production rates for construction time estimationKuo, Yao-chen, O'Connor, James Thomas, January 2004 (has links) (PDF)
Thesis (Ph. D.)--University of Texas at Austin, 2004. / Supervisor: James T. O'Connor. Vita. Includes bibliographical references. Also available from UMI.
|
560 |
Using distributed computing to improve the performance of genetic algorithms for job shop scheduling problems /Shah, Nihar. January 2004 (has links)
Thesis (M.S.)--Ohio University, August, 2004. / Includes bibliographical references (p. 65-69).
|
Page generated in 0.0572 seconds