• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

10kV linijų techninių financinių rodiklių tyrimas / Research of 10 kV lines' technical - financial measures

Bertulis, Algirdas 07 September 2010 (has links)
Šiame darbe nagrinėjamas Radviliškio rajono 10 kV skirstomasis tinklas. 2009 m. duomenimis 10 kV elektros oro linijų ilgis buvo 988,62 km ir kabelinių elektros linijų 115,6 km. Visos elektros oro linijos yra statytos su gelžbetoninėmis atramomis. Linijų tankis 0,68 km/km2. Dėl elektros tiekimo nutraukimų vartotojai patiria materialinę žalą. Kadangi visos linijos buvo statytos tuomet kai Lietuva buvo TSRS sudėtyje. Lietuvai įstojus į Europos Sąjungą, pasikeitė reikalavimai skirstomajam tinklui. Apskaičiuosime kai kuriuos esamo tinklo parametrus ir pabandysime palyginti su normatyviniais. Šiame darbe pateikiame išvadas apie nagrinėjamo elektros tinklo patikimumą. Ar tinklą galima toliau eksploatuoti. Iš gautų rezultatų bus galima spręsti kokiais būdais galima pagerinti tinklo būklę. / In this final paper the 10 kV distributive networks in Radviliskis district has been analysed. According to the data of 2009, the length of 10 kV air route of electricity was 988,62 km and the length of cable route of electricity was 115,6 km. All the air route of electricity has been built using ferroconcrete supports. The density of routes is 0,68 km/ km2. The consumers of electricity experience material harm due to abortion of distribution of electricity. The requirements for distributive networks have been changed when Lithuania joined EU, because all the electricity routes have been built when Lithuania was part of the Soviet Union. We will try to evaluate some parameters of present network and to compare with normative. In this paper the conclusions about the reliability and further maintenance of electricity network has been formulated. Agreeably with results received, solutions for current network improvement have been given.

Page generated in 0.0655 seconds