Spelling suggestions: "subject:"solid waste from 5construction"" "subject:"solid waste from constructuction""
1 |
Resíduos sólidos da construção civil: análise DP gerenciamento em obras de reforma, de micro e de pequeno portesFernandez, José Luiz Borja 26 February 2018 (has links)
Submitted by Marcio Emanuel Paixão Santos (marcio.santos@ucsal.br) on 2018-06-21T19:23:41Z
No. of bitstreams: 1
DISSERTACAOJOSELUIZBORJAFERNANDEZ.pdf: 2288738 bytes, checksum: d0b00c98fdeddb7aa8885a86208f2df8 (MD5) / Approved for entry into archive by Linda Bulhosa (linda.gomes@ucsal.br) on 2018-06-21T19:30:02Z (GMT) No. of bitstreams: 1
DISSERTACAOJOSELUIZBORJAFERNANDEZ.pdf: 2288738 bytes, checksum: d0b00c98fdeddb7aa8885a86208f2df8 (MD5) / Made available in DSpace on 2018-06-21T19:30:03Z (GMT). No. of bitstreams: 1
DISSERTACAOJOSELUIZBORJAFERNANDEZ.pdf: 2288738 bytes, checksum: d0b00c98fdeddb7aa8885a86208f2df8 (MD5)
Previous issue date: 2018-02-26 / A cadeia produtiva da construção civil é a maior consumidora de recursos naturais do planeta e a maior geradora de resíduos sólidos, sendo a construção civil o elo da cadeia que contribui com a maior fração de resíduos sólidos urbanos, provocando impactos negativos significativos ao meio ambiente, prejudicando as camadas mais pobres das grandes cidades. Da massa total de resíduos da construção civil, o maior percentual provém de reformas, demolição, pequenas construções e eventos informais, sendo o pequeno gerador responsável pela maior contribuição de resíduos da construção civil. Nesse cenário, a presente pesquisa teve a finalidade de investigar a situação do manejo dos resíduos da construção civil em obras de reforma, de micro e de pequeno portes, frente à resolução do CONAMA no 307/2002 e à Política Nacional de Resíduos Sólidos, a Lei 12.305/2010. Os estudos realizados mostraram o desconhecimento dos pequenos geradores dos instrumentos legais e normativos vigentes e a falta de manejo dos resíduos gerados no processo construtivo, apontando a necessidade de ferramentas para auxiliar no planejamento e monitoramento dos resíduos nos canteiros de obras, propondo um aplicativo interativo para ser utilizado em equipamentos móveis, com a finalidade de mostrar o fluxo dos resíduos por etapa do processo construtivo, com as possibilidades de tratamento e de disposição ambientalmente adequada, proporcionando, ao gestor, o desenvolvimento de ações estratégicas com o objetivo de reduzir, reutilizar e reciclar os resíduos e, esgotando todas as possibilidades de manejo, enviar os rejeitos para a disposição ambientalmente adequada, reduzindo os impactos ambientais com a geração e disposição dos resíduos da construção civil. / The productive chain of the construction industry is the largest consumer of the planet’s natural and increased solid waste generator, being civil construction chain that contributes the largest fraction of municipal solid waste, causing significant negative impacts to the environment and to needy population. The highest percentage of construction waste comes from reforms, demolitions and small constructions. In this scenario, the present research was designed to investigate the situation of the management of construction waste in renovation, micro and small business according to the resolution CONAMA number 307/2002, and the national policy on solid waste 12.305/2010. The studies show the ignorance of small generators of legal and regulatory instruments in force and the lack of management of the waste generated in the construction process, pointing out the need for tools to assist in the planning and monitoring of waste in construction sites, proposing an interactive application, to be used in mobile devices, in order to show the flow of waste by stage of the building process, with the possibilities of treatment and environmentally appropriate disposal providing the development manager of strategic actions to reduce , reuse and recycle, and exhausting all the possibilities for handing, shipping for environmentally appropriate, reducing environmental impacts with the generation and disposal of construction waste.
|
2 |
Análisis de la normativa ambiental peruana en el manejo de residuos sólidos de la construcción y demolición como producto de la excavación en edificacionesBustamante Villanueva, Liliana Carina, León Rondán, Kelvin Galvani January 2015 (has links)
La presente investigación se originó por la necesidad de demostrar que las fallas en el enfoque de la normativa ambiental en el manejo de los residuos sólidos de las actividades de construcción y demolición generan incrementos considerables en el presupuesto de obra de una edificación, pues la normativa ambiental está enfocada hacia residuos sólidos que se generan en menores cantidades a comparación del material extraído producto de la excavación masiva, debido a ello el objetivo de la investigación es orientar la normativa ambiental en el manejo de residuos sólidos de las actividades de construcción y demolición en edificaciones hacia residuos sólidos y materiales naturales generados en grandes cantidades como es el caso del material excavado. La metodología de investigación es de tipo aplicada y el nivel de investigación es descriptivo-correlacional. Se obtuvieron como resultados que el material excavado es un material natural que se puede prescindir del uso de las Empresa Prestadora de Servicios de Residuos Sólidos y que las Empresas Prestadoras de Servicios de Residuos Sólidos no cuentan con capacidad instalada suficiente para poder cumplir con el rendimiento programado para que un proyecto sea viable.
This research arises from the need to demonstrate that the flaws in the approach to environmental regulations in the management of solid waste from construction and demolition activities generate substantial increases in budget work of a building, for environmental regulations It is focused on solid waste generated in smaller amounts to comparing the extracted material product of the mass excavation, due to that the aim of the research is to guide environmental regulations on solid waste management activities of construction and demolition buildings to solid waste and natural materials generated in large quantities as is the case of excavated material. The research methodology is applied type and level of research is descriptive-correlational. Results were obtained as excavated material is natural materials that can dispense with the use of a service provider and Solid Waste Services Companies the Solid Waste not have enough installed capacity to meet the scheduled performance for a project to be viable.
|
Page generated in 0.1424 seconds