• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • Tagged with
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

The bid construction problem for truckload transportation services procurement in combinatorial auctions : new formulations and solution methods

Hammami, Farouk 13 January 2022 (has links)
De nos jours, l'évolution du commerce électronique ainsi que des niveaux de la consommation requièrent des acteurs de la chaine logistique et en particulier les transporteurs de gérer efficacement leurs opérations. Afin de rester concurrentiels et maximiser leurs profits, ils doivent optimiser leurs opérations de transport. Dans cette thèse de doctorat, nous nous focalisons sur les enchères combinatoires en tant que mécanisme de négociation pour les marchés d'approvisionnement des services de transport routier par camions permettant à un expéditeur d'externaliser ses opérations de transport et aux transporteurs d'acquérir des contrats de transport. Les mises combinatoires permettent à un transporteur participant à l'enchère d'exprimer ses intérêts pour une combinaison de contrats mis à l'enchère dans une même mise. Si la mise gagne, tous les contrats qui la forment seront alloués au transporteur au tarif exigé. Les défis majeurs pour le transporteur sont de déterminer les contrats de transport sur lesquels miser, les regrouper dans plusieurs mises combinatoires, s'il y a lieu, et décider des prix à soumettre pour chaque mise générée. Ces défis décisionnels définissent le problème de construction de mises combinatoires (BCP pour Bid Construction Problem). Chaque transporteur doit résoudre le BCP tout en respectant ses engagements préexistants et ses capacités de transport et en tenant compte des offres des compétiteurs, ce qui rend le problème difficile à résoudre. Dans la pratique, la majorité des transporteurs se basent sur leur connaissance du marché et leur historique pour fixer leurs prix des mises. Dans la littérature, la majorité des travaux sur le BCP considèrent des modèles déterministes où les paramètres sont connus et se limitent à un contexte de flotte homogène. En plus, nous notons qu'un seul travail à considérer une variante stochastique du BCP. Dans cette thèse de doctorat, nous visons à faire avancer les connaissances dans ce domaine en introduisant de nouvelles formulations et méthodes de résolution pour le BCP Le premier chapitre de cette thèse introduit une nouvelle variante du BCP avec une flotte hétérogène. En partant d'une comparaison des similitudes et des différences entre le BCP et les problèmes classiques de de tournées de véhicules, nous proposons une nouvelle formulation basée sur les arcs avec de nouvelles contraintes de bris de symétrie pour accélérer la résolution. Ensuite, nous proposons une approche heuristique et une autre exacte pour résoudre ce problème. L'heuristique développée est une recherche adaptative à grands voisinages (ALNS pour Adaptive Large Neighborhood Search) et se base sur le principe de destruction puis réparation de la solution à l'aide d'opérateurs conçus spécifiquement pour le BCP traité. La méthode exacte utilise la meilleure solution heuristique pour résoudre notre modèle mathématique avec le solveur CPLEX. Les résultats obtenus montrent la pertinence de nos méthodes en termes de qualités des solutions et des temps de calculs et ce pour des instances de grande taille. Dans le deuxième chapitre, nous nous attaquons à un cas particulier du BCP où le transporteur n'a pas d'engagements existants et vise à déterminer un ensemble de contrats mis à l'enchère profitables à miser dessus. Cette problématique correspond à un problème de tournées de véhicules avec profits (TOP pour Team Orienteering Problem). Nous proposons pour le TOP une heuristique ALNS hybride avec de nouveaux opérateurs ainsi que de nouvelles fonctionnalités tenant compte de la nature du problème. Ensuite, nous comparons les performances de notre méthode avec toutes les méthodes déjà publiées dans la littérature traitant du TOP. Les résultats montrent que notre méthode surpasse généralement toutes les approches existantes en termes de qualité des solutions et/ou temps de calculs quand elle est testée sur toutes les instances de la littérature. Notre méthode améliore la solution d'une instance de grande taille, ce qui surligne sa performance. Dans le troisième chapitre, nous nous focalisons sur l'incertitude associée aux prix de cessions des contrats mis à l'enchère et sur les offres des transporteurs concurrents. Il n'existe qu'un seul article qui traite de l'incertitude dans le BCP cependant il ne permet pas de générer des mises multiples. Ainsi, nous proposons une nouvelle formulation pour le BCP avec des prix stochastiques permettant de générer des mises combinatoires et disjointes. Nous présentons deux méthodes pour résoudre ce problème. La première méthode est hybride et à deux étapes. Dans un premier temps, elle résout un problème de sélection pour déterminer un ensemble de contrats profitables. Dans un second temps, elle résout simultanément un problème de sélection de contrats et de détermination de prix des mises (CSPP pour Contracts Selection and Pricing Problem) en ne considérant que les contrats sélectionnés dans la première étape. Notre méthode exacte résout, avec l'algorithme de branch-and-cut, le CSPP sans présélectionner des contrats. Les résultats expérimentaux et de simulations que nous rapportons soulignent la performance de nos deux méthodes et évaluent l'impact de certains paramètres sur le profit réel du transporteur. Dans le quatrième chapitre, nous nous focalisons sur l'incertitude liée au succès des mises et à la non-matérialisation des contrats. Généralement, le transporteur souhaite avoir la garantie que si certaines des mises ne sont pas gagnées ou un contrat ne se matérialise pas, il n'encourra pas de perte en servant le sous-ensemble de contrats gagnés. Dans cette recherche, nous adressons le BCP avec prix stochastiques et développons une méthode exacte qui garantit un profit non négatif pour le transporteur peu importe le résultat des enchères. Nos simulations des solutions optimales démontrent, qu'en moyenne, notre approche permet au transporteur d'augmenter son profit en plus de garantir qu'il reste non-négatif peu importe les mises gagnées ou la matérialisation des contrats suivant l'enchère. / Nowadays, the evolution of e-commerce and consumption levels require supply chain actors, in particular carriers, to efficiently manage their operations. In order to remain competitive and to maximize their profits, they must optimize their transport operations. In this doctoral thesis, we focus on Combinatorial Auctions (CA) as a negotiation mechanism for truckload (TL) transportation services procurement allowing a shipper to outsource its transportation operations and for a carrier to serve new transportation contracts. Combinatorial bids offer a carrier the possibility to express his valuation for a combination of contracts simultaneously. If the bid is successful, all the contracts forming it will be allocated to the carrier at the submitted price. The major challenges for a carrier are to select the transportation contracts to bid on, formulate combinatorial bids and associated prices. These decision-making challenges define the Bid Construction Problem (BCP). Each carrier must solve a BCP while respecting its pre-existing commitments and transportation capacity and considering unknown competitors' offers, which makes the problem difficult to solve. In practice, the majority of carriers rely on their historical data and market knowledge to set their prices. In the literature, the majority of works on the BCP propose deterministic models with known parameters and are limited to the problem with a homogeneous fleet. In addition, we found a single work addressing a stochastic BCP. In this thesis, we aim to advance knowledge in this field by introducing new formulations and solution methods for the BCP. The first chapter of this thesis introduces the BCP with a heterogeneous fleet. Starting from a comparison between the BCP and classical Vehicle Routing Problems (VRPs), we propose a new arc-based formulation with new symmetry-breaking constraints for the BCP. Next, we propose exact and heuristic approaches to solve this problem. Our Adaptive Large Neighborhood Search (ALNS) heuristic is based on a destroy-repair principle using operators designed for this problem. Our exact method starts from the heuristic solution and solves our mathematical model with CPLEX. The results we obtained revealed the relevance of our methods in terms of solutions quality and computational times for large instances with up to 500 contracts and 50 vehicles. In the second chapter, we tackle a particular case of the BCP where the carrier has no pre-existing commitments and aims to select a set of profitable auctioned contracts to bid on. This problem corresponds to a Team Orienteering Problem (TOP). We propose a hybrid ALNS heuristic for the TOP with new operators as well as new features taking into account the nature of the problem. Then, we compare the performance of our algorithm against the best solutions from the literature. The results show that our method generally outperforms all the existing ones in terms of solutions quality and/or computational times on benchmark instances. Our method improves one large instance solution, which highlights its performance. In the third chapter, we focus on the uncertainty associated with the auctioned contracts clearing prices and competing carriers offers. Only one article dealing with uncertainty in the BCP existed but it does not allow to generate multiple bids. Thus, we propose a new formulation for the BCP with stochastic prices allowing to generate non-overlapping combinatorial bids. We present two methods to solve this problem. The first one is a two-step hybrid heuristic. First, it solves a Contracts Selection Problem to determine a set of profitable contracts to bid on. Secondly, it simultaneously solves a Contracts Selection and Pricing Problem (CSPP) by considering only the set of auctioned contracts selected in the first stage. Our exact method solves a CSPP by branch-and-cut without pre-selecting contracts. The experimental and simulation results underline the performance of our two methods and evaluate the impact of certain parameters on the carrier's real profit. In the fourth chapter, we focus on the uncertainty associated with bids success and contracts non-materialization. Generally, the carrier seeks to be assured that if some of the submitted bids are not won or a contract does not materialize, it will not incur a loss by serving the remaining contracts. In this research, we address the BCP with stochastic prices and develop an exact method that ensures a non-negative profit for the carrier regardless of the auction outcomes and contracts materialization. Our simulations of the optimal solutions show that, on average, our approach increases the carrier's profit in addition to guaranteeing its non-negativity regardless of the bids won or the contracts materialization.
2

Procédure d'appel d'offres et contrats d'infrastructures publiques : une perspective relationnelle pour favoriser l'utilisation de la RPI et du BIM

Jobidon, Gabriel 07 May 2022 (has links)
L'émergence de modes de réalisation alternatifs pour des projets publics d'infrastructure, et notamment de la réalisation de projet intégrée, illustre un changement de paradigme dans les pratiques gouvernementales. Or, les procédures de passation des marchés publics et les contrats actuellement utilisés ne permettent pas encore d'obtenir les pleins effets souhaités de ces pratiques intégrées. Une vision relationnelle du contrat peut servir de levier au bon déroulement de ce mode de réalisation misant sur la coopération, la collaboration, l'innovation et les itérations. Le contrat relationnel cerne mieux la réalité sociologique complexe, ponctuée de jeux de pouvoirs, de relations de confiance et de flexibilité régissant les échanges contractuels à long terme tels les contrats de service professionnels et de construction. Ce type de contrat a démontré plusieurs avantages pour la réalisation des travaux de conception et de construction. D'abord, il permet le maintien d'une saine relation à long terme entre les parties prenantes, un élément essentiel au travail collaboratif et à la mise en place de synergies pouvant favoriser l'innovation et la création de valeur. Le maintien d'une relation équilibrée avec le secteur privé repose plus sur la confiance développée, la qualité des services rendus et l'innovation que sur la réalisation d'un projet à prix fixe en réponse à des exigences imposées unilatéralement par l'Administration. Instaurer une approche relationnelle permet également une meilleure performance dans la réalisation du projet, et ce, au niveau de la réduction de l'échéancier, des coûts de production et de transaction et l'augmentation de la qualité. Il s'agit là des trois éléments considérés comme étant les indicateurs les plus importants de la bonne conduite d'un projet. Le travail multidisciplinaire et collaboratif en amont de projet, basé sur la synergie entre les parties prenantes et la création de valeur, permet ainsi au gouvernement de se conformer à son objectif de saine gestion des fonds publics. Une communication efficace entre les parties, jumelée à une planification conjointe, aide à réduire les échéanciers. La collaboration est au service de l'innovation et permet d'optimiser les différents systèmes du bâtiment, offrant ainsi la chance de fournir des infrastructures de qualité. La présente thèse, découlant de la rédaction de trois articles différents, opérationnalise la théorie du contrat relationnel de Macneil et identifie les pratiques et mécanismes relationnels, ou à l'opposé, transactionnels, au niveau de la préparation du contrat et de sa formation (procédure d'appel d'offres et le langage contractuel) ainsi que de son exécution (les processus utilisés lors de la relation). Des recommandations portant sur des modifications nécessaires à apporter à la procédure d'appel d'offres sont formulées afin de permettre l'utilisation d'une approche relationnelle dans le domaine public et ainsi profiter des avantages découlant de l'utilisation d'approches intégrées. / The emergence of alternative project delivery methods in public construction projects, such as integrated project delivery, illustrates a paradigm shift in government practice. However, public procurement procedures and contracts currently used by the Administration do not help reach the full desired effects of integrated practices. A relational vision of contract can serve as a lever for the implementation of alternative project delivery methods, which focus on cooperation, collaboration, innovation and iterations. Relational contracts better identify the complex sociological reality, punctuated by power struggles, trust and flexibility, governing long-term contractual exchanges such as professional service and construction contracts. Relational contracts have demonstrated several advantages for carrying out the design and construction work. First, these contracts allow for the maintenance of a healthy long-term relationship co-contracting parties, an essential element for collaboration and for the establishment of synergies that can foster innovation and value creation. Maintaining balanced relationships with the private sector is more a question of trust, quality of services provided and innovation rather than the completion of a project under a fixed price and conform to unilaterally imposed requirements. Establishing a relational approach also allows for better performance in project execution, in terms of reducing lead times, reducing production and transaction costs and increasing quality. These are the three elements considered to be the most important indicators of project performance. The upstream work and interaction of project stakeholders, based on synergy and value-creation processes, allows cost reduction which allows the government to soundly manage public funds. Effective communication between the parties, coupled with joint planning, helps reduce project schedules. Collaboration is at the service of innovation and facilitates optimization of different building systems, thus providing quality infrastructures. This thesis, resulting from three different articles, operationalizes Macneil's relational contract theory and identifies relational, or conversely, transactional practices and mechanisms, at the level of contract preparation and its formation (tendering procedure and contractual language) as well as its execution (actual processes used over the course of the relationship). Recommendations for necessary modifications to the tendering procedure are formulated in order to allow the use of a relational approach in the public sector and thus benefit from the advantages of integrated approaches.

Page generated in 0.1538 seconds