• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 11
  • 8
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 24
  • 24
  • 7
  • 7
  • 6
  • 5
  • 5
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Sportovní centrum / Sports center

Florek, Jozef January 2018 (has links)
The project deals with structure design of a new – built sports centre with the capacity up to 120 persons. It is situated in the sports grounds of Zákamenné in a flat terrain lot with area of 21 811 m2. The building wasn´t designed for disabled people, it is designed with partial basement, it has got two floors with irregular shape and the floor area of 752,44 m2. On the first floor the building is split into two sections - northern, which is the sports part and southern. which is the facilities part (café, entrance to flat,...). On the second floor there is a caretaker´s flat in the southern part, northern part serves mainly for administration purposes. The northern part also offers access to a non-public terrace. Basement is situated under southern part and serves technical facilities of the buildiung. The support structure system consists of concrete strips foundations, supporting wall system built with Ytong aerated concrete blocks, the ceiling system is made of reinforced concrete floor, which also supports construction of a warm flat roof.
22

Sportovně relaxační centrum / Sports and relaxation center

Bárta, Hynek January 2013 (has links)
The purpose of the new building is the construction of sports and relaxation center in Jihlava in the Vysocina. The building will serve as a sports and leisure center also contains the 1st floor squash courts, relaxation area with jacuzzi, sauna and massage. In the 2nd floor will be located with aerobic fitness, office manager, a children's playground and a bar with seating. The building consists of two floors and a basement. External walls are lined with masonry elements of Heluz Family tl. 300 mm 3 square inches with excellent thermal insulation properties, the internal load-bearing walls of thick STI Heluz system. 300mm. The building can escape three unprotected pathways into the open towards the northwest and south. The building is situated in a slightly sloping terrain. From the main road to get to the building access road to the 1st floor. The overall height of the first floor is 4.00 m, the second floor is 4m and also underground floor is 3.40 m The building consists of three wings in the longitudinal structural system. The building has three floors: a basement and two floors. The roof is flat, single-layer, above the squash courts is inclined with an inclination of 6 degrees. The ground plan is mass divided into 3 wings on 1st floor with main entrance and staircase connecting all the floors in the middle of disposition. Ground object is longitudinally divided into differently sized parts of the corridor, which on each side of the staircase joining the center of the building. Check the plot is solved its own parking with direct entrance from the road.
23

Sportovně rekreační centrum Vsetín, Ohrada / Sports and Relaxation Centre Vsetín, Ohrada

Marková, Dominika January 2021 (has links)
The assignment is an architecture and urban planning study of a sports and recreation center. The solved area is located in the town of Vsetín, in the part called Ohrada. Nowdays, the area is obsolete, unfunctional and also unmodern. My project is mainly focused to create a concept that responds to the environment, offers outdoor and indoor spaces for all generations. It allows better connection with nature, variable use, and division of area by function. The design is defined by the river Bečva on the west side and a busy 1st class road on the east side. It was important to separate pedestrians and cyclists from motor vehicles. The response to this restriction is to direct traffic in the area to the west, towards the river. This creates a terrain works that optically deflects the design in a quieter direction. Buildings are placed in the line and oriented in the western direction. After creating the terrain, I divided the area into several segments according to functionality. In the heart of the area, a multifunctional central hall with an inner climbing wall is set in the terrain. In front of it is a public space for meetings, sports and recreation. On the other side, there is a basketball court, a workout playground, a children's playground in front of the hall and a rest area of ??greenery closer to the river. If we continue southerly down, another cube set into the terrain is a building with a restaurant and a cafe. The southernmost building is a tennis club with facilities for athletes and squash. In front of the building there is a 9x tennis court with a grandstand. Closer to the river and the bike path there is an outdoor climbing wall. From the newly created embankment, the area is divided by a cycle path around the river. Behind the bridge is a green belt separated area which, unlike the previous ones, is tuned in a calmer spirit. We will find a building of a yoga and meditation center.
24

Centrum vodního lyžování Soběslav / Center of water skiing Soběslav

Veselý, Tomáš January 2017 (has links)
The thesis is focused of proposal and procesing of project documentation Center for waterskiing. The proposed object is located in the western part of the town Soběslav, in the locality aimed at sports activities. The building is created of facilities for summer sports, especially water skiing and wakeboarding. Further there will be built a playground for ball sports and track on roller skates. This is a three-storey no with a cellar object with a flat roof. The object is based on the foundation reinforced concrete pads a strips. The first floor is bricked of permanent formwork and partly of cast in place structure. The second and third floors is designed of clay blocks POROTHERM. This masonry is insulated with the aid of external contact thermal insulation. In the western part of the building is designed ventilated facade. The floor structures is designed from prestressed reinforced concrete panel SPIROLL and partly from reinforced concrete slabs. The object is divided into several operating units. They are the gym and its facilities, restaurant with kitchen, facilities for employees and the necessary storerooms, coffeehouse, shop with sporting equipment, rental equipment for water skiing and a dressing room serving the outdoor sports. The essential part of the second floor is comprised outdoor terrace. From this terrace is allowed entry to the coffeehouse, restaurants, shops and on the main staircase.

Page generated in 0.1216 seconds