• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • Tagged with
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Diretrizes para o planejamento e controle da produção em obras de sistemas construtivos metálicos

Fabro, Fabiana January 2012 (has links)
No setor da construção civil, tem ocorrido um aumento na utilização de sistemas industrializados, dentre eles sistemas construtivos metálicos, visto que o uso desses sistemas contribui para o aumento da velocidade de execução dos empreendimentos e para a redução de desperdícios. Esta mudança tem criado oportunidades para a aplicação de conceitos e métodos de gestão da produção, desenvolvidos em outras indústrias, tais como a Filosofia da Produção Enxuta, que tem trazido muitos benefícios ao setor da construção, tais como redução de desperdícios, aumento da produtividade e da confiabilidade nos prazos de entrega. Entretanto, há poucas pesquisas sobre a utilização de conceitos da produção enxuta no processo de PCP de obras de empresas que fornecem sistemas construtivos metálicos. O presente trabalho tem como objetivo geral propor diretrizes para a concepção e implementação de sistemas de Planejamento e Controle de Produção em obras de empresas que projetam, fabricam e montam sistemas construtivos metálicos. São também propostas adaptações no Sistema Last Planner ao contexto de montagem deste tipo de sistema. A estratégia de pesquisa adotada foi a pesquisa-ação, sendo desenvolvidos cinco estudos empíricos em obras de uma empresa líder neste setor. O trabalho iniciou pela realização de um diagnóstico relativo aos fluxos de materiais e informações entre os principais setores da empresa, assim como análise do processo de planejamento e controle existente no processo de montagem. Na sequência, foram definidas e implementadas melhorias no processo de PCP em três obras da empresa. Os principais resultados obtidos pela pesquisa estão relacionados à necessidade de ampliação do escopo do projeto do sistema de produção, à adaptação dos níveis de planejamento de médio e curto prazo do Sistema Last Planner para este contexto, assim como à necessidade de integração do planejamento e controle do processo de montagem a outros processos à montante da obra. São também propostos diferentes tipos de sistemas de planejamento e controle da produção, em função da complexidade e do tamanho da obra. / In the construction sector, there has been an increase on the use of industrialized building systems, including steel construction systems, due to the contribution of those systems in terms of reducing the duration of projects, and reduction of waste. This change has created opportunities for the application of production management concepts and methods that have been originated in other industries, such as the Lean Production Philosophy, which has brought several benefits for the construction sector, such as waste reduction, increase in productivity and reliability in delivery time. However, there have been only a few research studies on the application of Lean Production concepts on the production planning and control process of companies involved in the delivery of steel construction systems. The aim of this research work is to propose guidelines for the conception and implementation of production planning and control systems for projects delivered by companies that design, manufacture and assemble steel construction systems. Moreover, some adaptations in the Last Planner Systems are proposed for the context of assembling this type of system. Action research was the research strategy adopted in this investigation, which involved the development of five empirical studies in projects carried out by a Brazilian leading company. This investigation started by carrying out an analysis of the material and information flows among the main departments of the company, as well as by assessing the existing planning and control process for site assembly. Then, a set of improvements in that process were devised and implemented in three construction sites of the company. The main results of this research work are concerned with extending the scope of production system design, adapting the medium and short-term planning levels of the Last Planner System to this context, and integrating the planning and control process for site assembly with upstream processes. Moreover, different types of planning and control systems were proposed for different types of projects, according to their complexity and size.
2

Diretrizes para o planejamento e controle da produção em obras de sistemas construtivos metálicos

Fabro, Fabiana January 2012 (has links)
No setor da construção civil, tem ocorrido um aumento na utilização de sistemas industrializados, dentre eles sistemas construtivos metálicos, visto que o uso desses sistemas contribui para o aumento da velocidade de execução dos empreendimentos e para a redução de desperdícios. Esta mudança tem criado oportunidades para a aplicação de conceitos e métodos de gestão da produção, desenvolvidos em outras indústrias, tais como a Filosofia da Produção Enxuta, que tem trazido muitos benefícios ao setor da construção, tais como redução de desperdícios, aumento da produtividade e da confiabilidade nos prazos de entrega. Entretanto, há poucas pesquisas sobre a utilização de conceitos da produção enxuta no processo de PCP de obras de empresas que fornecem sistemas construtivos metálicos. O presente trabalho tem como objetivo geral propor diretrizes para a concepção e implementação de sistemas de Planejamento e Controle de Produção em obras de empresas que projetam, fabricam e montam sistemas construtivos metálicos. São também propostas adaptações no Sistema Last Planner ao contexto de montagem deste tipo de sistema. A estratégia de pesquisa adotada foi a pesquisa-ação, sendo desenvolvidos cinco estudos empíricos em obras de uma empresa líder neste setor. O trabalho iniciou pela realização de um diagnóstico relativo aos fluxos de materiais e informações entre os principais setores da empresa, assim como análise do processo de planejamento e controle existente no processo de montagem. Na sequência, foram definidas e implementadas melhorias no processo de PCP em três obras da empresa. Os principais resultados obtidos pela pesquisa estão relacionados à necessidade de ampliação do escopo do projeto do sistema de produção, à adaptação dos níveis de planejamento de médio e curto prazo do Sistema Last Planner para este contexto, assim como à necessidade de integração do planejamento e controle do processo de montagem a outros processos à montante da obra. São também propostos diferentes tipos de sistemas de planejamento e controle da produção, em função da complexidade e do tamanho da obra. / In the construction sector, there has been an increase on the use of industrialized building systems, including steel construction systems, due to the contribution of those systems in terms of reducing the duration of projects, and reduction of waste. This change has created opportunities for the application of production management concepts and methods that have been originated in other industries, such as the Lean Production Philosophy, which has brought several benefits for the construction sector, such as waste reduction, increase in productivity and reliability in delivery time. However, there have been only a few research studies on the application of Lean Production concepts on the production planning and control process of companies involved in the delivery of steel construction systems. The aim of this research work is to propose guidelines for the conception and implementation of production planning and control systems for projects delivered by companies that design, manufacture and assemble steel construction systems. Moreover, some adaptations in the Last Planner Systems are proposed for the context of assembling this type of system. Action research was the research strategy adopted in this investigation, which involved the development of five empirical studies in projects carried out by a Brazilian leading company. This investigation started by carrying out an analysis of the material and information flows among the main departments of the company, as well as by assessing the existing planning and control process for site assembly. Then, a set of improvements in that process were devised and implemented in three construction sites of the company. The main results of this research work are concerned with extending the scope of production system design, adapting the medium and short-term planning levels of the Last Planner System to this context, and integrating the planning and control process for site assembly with upstream processes. Moreover, different types of planning and control systems were proposed for different types of projects, according to their complexity and size.
3

Diretrizes para o planejamento e controle da produção em obras de sistemas construtivos metálicos

Fabro, Fabiana January 2012 (has links)
No setor da construção civil, tem ocorrido um aumento na utilização de sistemas industrializados, dentre eles sistemas construtivos metálicos, visto que o uso desses sistemas contribui para o aumento da velocidade de execução dos empreendimentos e para a redução de desperdícios. Esta mudança tem criado oportunidades para a aplicação de conceitos e métodos de gestão da produção, desenvolvidos em outras indústrias, tais como a Filosofia da Produção Enxuta, que tem trazido muitos benefícios ao setor da construção, tais como redução de desperdícios, aumento da produtividade e da confiabilidade nos prazos de entrega. Entretanto, há poucas pesquisas sobre a utilização de conceitos da produção enxuta no processo de PCP de obras de empresas que fornecem sistemas construtivos metálicos. O presente trabalho tem como objetivo geral propor diretrizes para a concepção e implementação de sistemas de Planejamento e Controle de Produção em obras de empresas que projetam, fabricam e montam sistemas construtivos metálicos. São também propostas adaptações no Sistema Last Planner ao contexto de montagem deste tipo de sistema. A estratégia de pesquisa adotada foi a pesquisa-ação, sendo desenvolvidos cinco estudos empíricos em obras de uma empresa líder neste setor. O trabalho iniciou pela realização de um diagnóstico relativo aos fluxos de materiais e informações entre os principais setores da empresa, assim como análise do processo de planejamento e controle existente no processo de montagem. Na sequência, foram definidas e implementadas melhorias no processo de PCP em três obras da empresa. Os principais resultados obtidos pela pesquisa estão relacionados à necessidade de ampliação do escopo do projeto do sistema de produção, à adaptação dos níveis de planejamento de médio e curto prazo do Sistema Last Planner para este contexto, assim como à necessidade de integração do planejamento e controle do processo de montagem a outros processos à montante da obra. São também propostos diferentes tipos de sistemas de planejamento e controle da produção, em função da complexidade e do tamanho da obra. / In the construction sector, there has been an increase on the use of industrialized building systems, including steel construction systems, due to the contribution of those systems in terms of reducing the duration of projects, and reduction of waste. This change has created opportunities for the application of production management concepts and methods that have been originated in other industries, such as the Lean Production Philosophy, which has brought several benefits for the construction sector, such as waste reduction, increase in productivity and reliability in delivery time. However, there have been only a few research studies on the application of Lean Production concepts on the production planning and control process of companies involved in the delivery of steel construction systems. The aim of this research work is to propose guidelines for the conception and implementation of production planning and control systems for projects delivered by companies that design, manufacture and assemble steel construction systems. Moreover, some adaptations in the Last Planner Systems are proposed for the context of assembling this type of system. Action research was the research strategy adopted in this investigation, which involved the development of five empirical studies in projects carried out by a Brazilian leading company. This investigation started by carrying out an analysis of the material and information flows among the main departments of the company, as well as by assessing the existing planning and control process for site assembly. Then, a set of improvements in that process were devised and implemented in three construction sites of the company. The main results of this research work are concerned with extending the scope of production system design, adapting the medium and short-term planning levels of the Last Planner System to this context, and integrating the planning and control process for site assembly with upstream processes. Moreover, different types of planning and control systems were proposed for different types of projects, according to their complexity and size.

Page generated in 0.1455 seconds