Spelling suggestions: "subject:"stowed mills"" "subject:"stowed fills""
1 |
Cost and Capability Evaluation of the Marine Corps Combined Arms Regiment (CAR)Gentry, Robin G. 12 1900 (has links)
Upon consultation with NPS faculty, the School has determined that this thesis may be released to the public, its distribution is unlimited effective August 25, 2011. / One result of the break-up of the Soviet Union is that the DOD has been forced to reevaluate the roles of each of the Armed Services based on the declining resource pool. From the Marine Corps' evaluation of itself came the Combined Arms Regiment (CAR) concept. The objective of this study was to develop an estimate of the Life Cycle Cost (LCC) of the two possible vehicles used with the CAR and the CAR's components. Standard cost factors are used to cost out the various organizations involved. Two supporting analyses done in this study are: an evaluation of the Marine Corps' role in national security and how the CAR could be used to support that security role, and a comparison of the vehicle option operating characteristics which was done to enrich the dimensions under which the CAR could be evaluated. The results of the study are a tool which can help Marine Corps planners make more informed decisions in regards to the CAR concept. The final conclusion, based on the assumption that any CAR would act as a follow-on element of the MAGTF, was that although the CAR(LAV) was a workable option, the CAR using upgraded AAVs was the better, more cost effective option.
|
Page generated in 0.0436 seconds