Spelling suggestions: "subject:"lemsystems productionsection"" "subject:"lemsystems productionisation""
11 |
An agent-based approach for integrating process planning and schedulingLeung, Chun-wai, David. January 2006 (has links)
Thesis (Ph. D.)--University of Hong Kong, 2006. / Title proper from title frame. Also available in printed format.
|
12 |
An empirical investigation of manufacturing flexibility and organizational performance as moderated by strategic integration and organizational infrastructureRogers, Pamela Rose Patterson. White, Richard E., January 2008 (has links)
Thesis (Ph. D.)--University of North Texas, Aug., 2008. / Title from title page display. Includes bibliographical references.
|
13 |
An agent based infrastructure for manufacturing cell control /Fan, Chi-kit. January 2001 (has links)
Thesis (M. Phil.)--University of Hong Kong, 2002. / Includes bibliographical references.
|
14 |
Integration of computer-aided design techniques into the mechanical product development process /Sturnick, Gerald R. January 1989 (has links)
Thesis (M.S.)--Rochester Institute of Technology, 1989. / Includes bibliographical references.
|
15 |
The implementation of a Kanban system in a multi-facility organization with a shared tooling constraintO'Grady, Erin L. January 2001 (has links)
Thesis (M.S.)--Ohio University, November, 2001. / Title from PDF t.p.
|
16 |
Incremental generation of alternative process plans for integrated manufactuirngThiruppalli, Shridharan. January 2002 (has links)
Thesis (M.S.)--Ohio University, November, 2002. / Title from PDF t.p. Includes bibliographical references (leaves 110-115).
|
17 |
Pattern-recognition schedulingYao, Xiaoqiang. January 1996 (has links)
Thesis (M.S.)--Ohio University, November, 1996. / Title from PDF t.p.
|
18 |
Cost-constrained project scheduling with task durations and costs that may increase over time demonstrated with the U.S. Army future combat systems /Grose, Roger T. January 2004 (has links) (PDF)
Thesis (M.S. in Operations Research)--Naval Postgraduate School, 2004. / Title from title screen (viewed June 28, 2005). "June 2004." Includes bibliographical references (p. 59-61). Also issued in paper format.
|
19 |
Characterization and measurement of manufacturing flexibility for production planning in high mix low volume manufacturing system /Gupta, Avaneesh. January 2004 (has links)
Thesis (Ph.D.)--Hong Kong University of Science and Technology, 2004. / Includes bibliographical references (leaves 173-179). Also available in electronic version. Access restricted to campus users.
|
20 |
Automatizace výroby v menším podniku / Production Automation in Smaller CompanyKřídlo, Michal January 2009 (has links)
Bad cooperation with suppliers can involve serious threat of company run. This thesis deals with change of supplier subjects and switch-over a technology provided by new suppliers.
|
Page generated in 0.1002 seconds