• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 150
  • 115
  • 41
  • 18
  • 15
  • 14
  • 7
  • 6
  • 5
  • 4
  • 2
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 448
  • 53
  • 51
  • 47
  • 47
  • 41
  • 40
  • 38
  • 38
  • 37
  • 36
  • 35
  • 34
  • 33
  • 32
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
431

Vybrané části stavebně technologického projektu psychiatrické kliniky Fakultní nemocnice Brno / Selected Parts of the Construction Technology Project of the Psychiatric Clinic of the University Hospital Brno

Drozd, Michal January 2020 (has links)
The subject of my diploma thesis are selected parts of the construction technology project of the psychiatric clinic of the University Hospital Brno based on the provided project documentation. It is an extension of a new six-storey building to the existing buildings. The thesis contains a technical report to the construction technology project, the coordination situation of the construction, the situation of wider transport routes, time and financial plan by objects, study of the realization of the main technological stages, a site equipment design, a design of a machine set, technological regulation for monolithic structures, quality control and testing plan of monolithic structures, noise study and selected documents for LEED certification.
432

Stavebně technologický projekt pro Mezinárodní centrum klinického výzkumu Fakultní nemocnice u sv. Anny v Brně / Construction technology project of the International Clinical Research Center of St. Anne's University Hospital Brno

Kozla, Dávid January 2020 (has links)
This diploma thesis solves the construction technology project of the International Clinical Research Center of the St. Anne’s University Hospital, Brno (ICRC), namely the first stage of the construction of the buildings "B1" and "C1". It tries to design an ideal technological process of construction with respect of local conditions. Technologically it focuses mainly on the issue of special foundation, namely protection of excavation pit with secant pile wall and pile foundation. There are processed technological regulations, time and financial plans, construction budget, control and test plan, plan of heavy equipment and safety or environmental requirements. Everything is supplemented by attachments and drawing documentation.
433

Stavebně technologický projekt Výzkumného centra Fakulty informačních technologií VUT v Brně / Construction technology project of Research centre Faculty of Information Technology in Brno

Chytková, Monika January 2013 (has links)
This Máster´s thesis deals with technological project of building a Research Center of Information Technologies VUT Brno in Brno. This work includes technical reports SY and STP, site equipment, budget, calculation, time planning, inspection and test plan, mechanical assembly, estimate,technological regulations, environmental plan, contract for work and job security for this building.
434

Stavebně technologický projekt dvoulodní haly ve Fulneku / Constructive Technological Project of Two-Aisle Hall in Fulnek

Selník, Petr January 2013 (has links)
The subject of this diploma thesis are chosen parts of building technological project of pursuance of the factory building Massag in Fulnek based on the metal bearing structure. This diploma thesis contents study of realization of main technological process of the hall, financial and time plan of building, project of construction site installation, budget of the construction, time planning of works, inspection and test plan, the project of safety and protection of health at work, technological regulation of building metal bearing structure.
435

Vybrané části stavebně technologického projektu fotbalové tribuny Androva stadionu v Olomouci / Selected Parts of Building and Technological Project for Football Tribune of Ander Stadium in Olomouc

Garláthy, Michal January 2013 (has links)
The theme of this diploma thesis are the Selected Parts of Building and Technological Project for Football Tribune of Ander Stadium in Olomouc. The content of this diploma thesis is the technological process of assembly of the building bearing construction of prefabricated concrete elements, the budget, the inspection and the test plan, the issue of safety and health at the construction site, the project concerning the construction site installation, the mechanical assembly, assessment of tower crane, object time and financial plan, construction technology study and the construction timetable.
436

Bytové domy v Brně, Bystrci - příprava a organizace výstavby / The Block of Flats in Brno, Bystrc - Project Planning and Management

Šarlejová, Petra January 2014 (has links)
This thesis deals with the project planning and management of the construction of two houses of flats in Brno – Bystrc, Šemberova street. The houses of flats are designed as a newly built five floors above ground and one basement floor. The supporting system is made from brick ceramic blocks, underground floor is made of concrete blocks. This thesis processes technological project of building as preparation and building site equipment, use of machines necessary for implementation of the construction, monitoring and test plan, technological steps for basement walls of shuttering blocks. Finally, in this thesis dealt with time and cost of construction of houses of flats.
437

Stavebně technologický projekt pavilonu laboratoří technologií Akademie věd v Brně / Constructional and Technological Project of Laboratoty Pavilion for Technology of AS in Brno

Cihelka, Karel January 2015 (has links)
The topic of this master thesis is dealing with selected parts of the constructional and technological project of laboratoty pavilion for technology of AS in Brno. Thesis is mainly focused for technological instructions of ground works, support of next building and solving of city center problems. Components of this thesis are evaluation plans and work place safety protocols. Next content of thesis are study of main technological phases, time and finanical plans, items budget, selected details, construction site equipment and design and verification of tower crain.
438

Novostavba farního kostela v Brně-Líšni / Parish church, Brno - Líšeň

Jurák, Vítězslav January 2015 (has links)
This diploma thesis, called „Parish church, Brno-Líšeň“, is compiled as documentation for building construction. There is one complex building situated in slope. Therefore it consists of one partly underground floor and first floor. It is divided into three sections. Central part is designed as round-shaped body of the church with tower in the southern part of the church. Shed roof has an angle of 7° for body and an angle of 13° for tower. From the western side there is an administrative area connected to the church and from eastern side there is a community area which is supposed to be used as residential premises. Roof of both these parts is constructed as flat vegetative roof. Structural design is systemic, Velox. Foundation construction combines concrete and ferro-concrete belts and footing.
439

Stavebně technologický projekt přípravy a realizace Domova pro seniory Žacléř / Construction project for implementation of Retirement home Žacléř

Bonaventura, Pavel January 2022 (has links)
The aim of this diploma thesis is to prepare the construction of a Home for the Elderly in Žacléř. The work deals with technical regulations for the dismantling of asbestos roofing, demolition work and monolithic structures. For these regulations, a time plan for the implementation of monolithic structures, a control and test plan for monolithic structures, an itemized budget and a time and financial plan - object-oriented will be prepared. Furthermore, this work contains the coordination situation of the construction with broader transport relations, the design of the assembly machine, the report for the construction site equipment with drawings of the construction site equipment for individual technological regulations and last but not least the health and safety plan and assessment of construction noise. As part of the diploma thesis, several appendices were prepared for this stage, such as crane assessment, details of monolithic stair arms, noise wall scheme, budget for construction site equipment, environmental plan, ceiling and wall formwork scheme and staff balance for selected stages.
440

Územní studie „Zbrojovka“ / Town planing study "Zbrojovka"

Bílek, František January 2012 (has links)
The aim of this thesis is a revitalization of the grounds once belonging to Zbrojovka Brno. These grounds are in the zoning map defined as “brownfield”. Within Brno’s limits, the area has an extremely convenient location. Since the grounds are situated in the central part of Brno, the complex is in terms of traffic and transport in the vicinity of both, the current and the newly planned ring-road. Important factors influencing the project are the river Svitava which borders the west side of the area, and a railroad corridor skirting the east side of the location. Assigned area was, for the purposes of this thesis, expanded by the grounds once belonging to Zetor and the adjoining area towards Markéty Kuncové Street. Several buildings from the former grounds, which fit in into the urban concept and were in good technical conditions, have been preserved. From a functional point of view, the newly designed grounds will meet all the requirements for a fully independent municipal district. The multifunctional development contains primarily housing complexes, administrative buildings, public facilities, recreational areas, as well as other functional structures. The urban concept of this project is a result of a study of surrounding blocks. Based on an analysis of the size and height of these buildings, an idealized block was designed and then recreated into a symmetrical raster of blocks with the street width of 20m. This raster was subsequently applied to newly designed points of entry into the area. Total urban and mass proposal of the development areahas been further influenced by principal conceptual points. Among these conceptual points belong the perspective axes which connect the conceptual points with an orientation point, in this case the former factory’s smokestack. Creating a new arm for the Svitava River is another point. Taking into account that the whole vicinity of the factory grounds is without quality public greenery elements.

Page generated in 0.0293 seconds