• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 150
  • 115
  • 41
  • 18
  • 15
  • 14
  • 7
  • 6
  • 5
  • 4
  • 2
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 448
  • 53
  • 51
  • 47
  • 47
  • 41
  • 40
  • 38
  • 38
  • 37
  • 36
  • 35
  • 34
  • 33
  • 32
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
401

Stavebně technologický projekt polyfunkčního domu, Staré Brno / Architectural and technological project of multifunctional building, Old Brno

Hradečný, Štěpán January 2018 (has links)
The diploma thesis deals with the technological stage of the lower structure, namely laying on piled foundations, including laying of a building pit with pilot reinforced concrete walls, and a rough top structure made of reinforced concrete walls, cores and reinforced concrete ceiling structure. The content is a technical report, solutions of wider transport relations, time and financial planning, studies of the main technological stages, equipment of the construction site of solved stages, design of the main building machines and mechanisms, technological regulations, control and test plans, safety and health protection at work, , thermal engineering assessment of selected constructions, budget, staff deployment balance, work progress scheme.
402

Bytový dům, Brno ulice Bělohorská. Stavebně technologická příprava stavby. / Apartment building, Brno Bělohorsk street.Civil technical project

Divácký, Petr January 2019 (has links)
The subject of this diploma thesis is construction-technological preparation of a residential building in Julianov. It includes a technical report on building structures, a construction technology study, a technological prescription, a control and test plan, a site equipment design, a design of a machine set, an item budget, a timetable, and a design for the implementation of paved areas.
403

Hasičská zbrojnice a tělocvična / Fire station with gym

Svoboda, Martin Unknown Date (has links)
The aim of the work is to design Fire station with a gym in Olomouc. Diploma thesis has three parts. First from institute of building structures, second from intitute of building services and last part is devoted to modeling and assessment of details of building. Fire station is divided into three parts. Garage for 3 fire trucks, main part and gym with training tower. The main part contains toilets, showers, locker rooms, storage places, offices and facilities for firefighters and office rooms. Structural elements of the building are from reinforced concrete. Infill walls are made from ceramic bloks. Thermal insulation is from mineral wool and cladding of the wall is made of fibre-cement boards. The slab in the main part is made of cast-in-place concrete. Others slabs in the garage and gym are made of prefabricated elements. On the building are desined three types of roofs. Extensive green roof, flat roof with a stabilization layer of river aggregates and roof made of insulating sandwich panels. In the thesis is design conception of artificial lighting, ventilating, heating, cooling, water managment, photovoltaics and management scheme of energy and ecological systems. The work contains project documentation for building permits, which were made in accordance with applicable legal and technical regulations.
404

Statické zajištění barokního kostela / Static provision of baroque church

Kadlec, Jaroslav January 2012 (has links)
The master´s thesis solves a static provision of the Baroque church of Saint James in Městečko Trnávka. The church was built in 1752 in Baroque style on the place of the original Romanesque church. It is a single-nave building with dimensions of about 46 × 20 m. The nave is followed by a massive square tower with a height of about 34 m. The reason for the restoration of the church are cracks in the external masonry and arch due to small space stiffness. The building will be reinforced by horizontal and transverse prestressing. They are designed prestressing tendons, called monostrands, using method of alternative cable channels. It will help to avoid other derformations and it will increase a stiffness of the structure.
405

Bytový dům U Vojanky – stavebně technologická příprava / Residential House at Vojanky - construction-technological preparation

Andres, Josef January 2013 (has links)
The content of this thesis is the construction project of technological of residential building U Vojanky in Prag. The new residential building is comprised of two parts that are interconnected by connecting neck. Author deals with the most important technology stages of construction that are processed in following parts of this thesis.
406

Wellness centrum Jinačovice, stavebně technologická příprava stavby. / Wellness centre Jinačovice, civil technological project.

Rada, Stanislav January 2014 (has links)
The subject of this thesis is also dealt with construction of the second phase of the congress and wellness centre in Jinačovice. The work includes technical report, time and financial plan, project site equipment, technical regulations, inspection and test plans, implementation of technology water impermeable concrete
407

Výstavba bytových domů Optátova - stavebně technologický projekt / Construction of apartment houses Optátova - building technology project

Kynclová, Veronika January 2014 (has links)
Diploma work deals Construction of apartment houses Optátova - building technology project. Work includes the technical report, coordination situation, timetable, financial plan, study of realization, drawing of devide construction and his financial and timetable evaluation, next timetable of construction, timetable of main objekct, supplies of building materials, technological specification, inspection and test plan, itemized budget of main object and contract of work. Time methods were compared – gradual, concurrent and current method.
408

Školící středisko Zašová - stavebně technologický projekt / Training Center Zašová - construction technological project

Janíček, Jakub January 2014 (has links)
The subject of work is building-technology project Training center in Zasova. The study includes a technical report on the construction technological project, technical report of the site equipment project including a drawings, design of the main building machines, technical report of transport relations, itemized budget, the detailed time plan of the construction, technology regulations to of the selected construction processes, inspection and testing plans, occupational safety, environment, contract for construction works, major lifting mechanisms evaluation from an economic perspective.
409

Bioplynová stanice-stavebně technologický projekt / The biogas station - Construction Technology Project

Fatura, Josef January 2015 (has links)
The subject of my thesis is the technological phase biogas plant. I focused in detail on the buildings SO01 - Hala income and treatment of raw materials and SO02 - Operating building a cogeneration unit. The concreting, formwork and reinforcement substructure object SO01 I developed technological prescription. Furthermore, my work includes a technical report on the structural and technological project, construction situation, time and financial planning, study, implementation of major technological stages, construction machinery, crane assessment, project site equipment, plan for securing material resources for SO01, inspection and test plan, plan OSH and itemized budget.
410

Konstrukce rozhledny v Javorníkách / The Structure of a Viewing Tower in Javorníky

Kadlček, Dan January 2015 (has links)
The aim of diploma thesis is design and assessment of bearing structure of viewing tower on the mountain Makyta in Javorníky, which is designed from timber and steel. The shape of construction is variable of its height. Diameter of octagonal platform at ground level is 12 m, in the middle of construction is 7,7 m and on the top of the construction is 8,7 m. Viewing tower has 5 viewing platforms – the highest one is covered by roof. Wooden elements are designed from glued-laminated GL24h timber, steel elements are designed from steel of S235 grade. Main support elements of structure are wooden rectangular outer columns and steel circle center column. Total height of construction is 31 m. Static analysis has been accomplished by student version of the SCIA Engineer 2014 software.

Page generated in 0.0606 seconds