• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 201
  • 5
  • 3
  • 3
  • 3
  • 1
  • 1
  • Tagged with
  • 218
  • 218
  • 195
  • 194
  • 159
  • 158
  • 157
  • 154
  • 154
  • 151
  • 149
  • 137
  • 135
  • 135
  • 127
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
91

Příprava a organizace výstavby skladovací haly ELIT v Brně / Preparation and organization of ELIT warehouse building in Brno

Boháček, Adam January 2019 (has links)
The subject of my diploma thesis is the design of realization of the Elit storage hall in Brno based on the provided project documentation. Part of the thesis is a technical report for a building technology project, a study of the realization of the main technological stages of the building, the situation of the building with wider transport route links, the project of the building site including the technical report of the construction site equipment, the design of the main building machines and mechanisms. Further part of this work are a chapters on the implementation of the supporting structure of the halls, which are the Technological Regulation for the assembly of the prefabricated reinforced concrete skeleton, The Plan for securing the material resources for the assembly of the prefabricated reinforced concrete skeleton and The Assessment of the usability of the mobile cranes for mounting the prefabricated reinforced concrete skeleton. Part of this work is also a variant solution for the implementation of the Densitop MT industrial floor including a price comparison comparison with the original design. From the time and financial point of view, the object time and financial plan is elaborated, followed by the detailed schedule of the main building construction and the itemized budget of the main building, including the bill of quantities. Due to the high demands on the quality and safety of the construction, the chapters of the Quality Control and Testing Plan for Reinforcing the Prefabricated Reinforced Skeleton and the Plan for Safety and Health at Work on the building site are also included.
92

StavebnÄ technologick projekt p­stavby vrobn­ haly / Construction-technological project of the extension of the production hall

M©zl, Petr January 2019 (has links)
This diploma thesis deals with the construction and technological project of the extension of the production hall Granitol a.s. in Moravian Beroun. The thesis focuses on the technological stage of assembly of the prefabricated skeleton of the rough top structure and the laying of the floor formation. In addition, an extended accompanying and summary technical report, a technical report on transport relations and coordination of oversized transport, a time and financial plan for the construction, a budget for the prefabricated skeleton, a timetable and the balance of the workers, the design of the main construction machines and mechanisms, including their time commitment , organization of the construction of the building including drawings of the construction site equipment, technological regulation for the assembly of the prefabricated skeleton and the laying of the floor formation, inspection and testing plan for the prefabricated skeleton assembly, summary assessment of the lifting mechanism selection, schematic of the assembly procedure of the prefabricated skeleton elements, protection and health at work during construction.
93

Příprava a realizace výstavby výrobní haly s administrativou / Preparation and realization of the construction of a production hall with administration

Hesková, Veronika January 2019 (has links)
This diploma thesis solves the construction and technological preparation of the production hall with administration building for company Mont-Tech localized in Brno. The following documents are processed for the project. These are: technical report, coordination situation with wider transport route relationships, time and financial plan for construction, study of the implementation of the main technological stages, design of site facilities, proposal of the main building machines and mechanisms, technological regulations and related control and testing plans. In addition were prepared – the itemized budget of the main buildings, the plan of safety and health protection and construction details.
94

Skladovací hala s administrativní částí, Brno slatina. Stavebně technologická příprava stavby. / Storage hall with administrative part. Civil technical project.

Polášek, Josef January 2019 (has links)
The subject of this diploma thesis is construction and technological preparation and management realization of the construction of the storage hall with administrative part Brno Slatina. Content diploma thesis is a technical report, building site project, study of the main technological stages, time and financial plan, design of major construction machinery and mechanisms, timetable, technological regulation and related control and test plan. The aim of the diploma thesis is to propose appropriate and effective the way of realization of the building depending on the local conditions.
95

Stavebně technologický projekt bytového domu ve Frýdku / Construction technology project of residential building in Frýdek

Jurečka, Matěj January 2019 (has links)
The subject of this diploma thesis is a construction technology project of a residential building in Frýdek. It is a residential building with four floors and a basement situated in Frýdek – Místek. The content of the preparation of technical reports for the construction and technological project studies and implementation of major technological stages. Creating a time and financial plan for a solved object. Further elaboration of technological regulations for drilled piles and reinforced concrete ceiling structure. A control and test plan is also being developed for these constructions. There is also a project site facility design and a machine assembly and a main lifting mechanism along with the occupational safety and health solution. In addition, the construction site is solved in connection with the transport routes. The thesis is designed with respect to the economic and time aspect.
96

Hotel Sachrův kopec Harrachov, stavebně technologická příprava stavby. / Hotel Sachrův kopec Harrachov, civil technical project.

Kvíčalová, Monika January 2019 (has links)
The diploma thesis deals with construction and technological solution of Hotel Sachrův kopec in Harrachov. Part of the thesis is technical report of main object, study of realization main technological phases, technological prescriptions and inspection and test plans for steel-concrete ceiling construction, copper roof cover and Spiroll panel ceiling construction. Thesis contain project of work side facilities, main construction machinery, shedule of health and safety, environmental protection, coordination situation of transport routes, time and financial plan for construction, drawing of formwork for steel-concrete ceiling construction and drawing of Spiroll panel ceiling.
97

Příprava realizace montované haly elektrárny v Mělníku / Preparation of the implementation of the prefabricated hall of the power plant in Mělník

Vondřejc, Adam January 2019 (has links)
The subject of this diploma thesis is the construction technological project of the implementation of the prefabricated hall of the power plant in Melnik. This thesis conatins a technical report, project of the site equipment with technical report, time and financial plan of the building, study for the realization of major technology stages, desingn of assembly machines, budget of object, technological specification of steel structure and cast-in-place constrution of pump pit, also monitoring and test plans.
98

Příprava a realizace Protonového terapeutického centra v Praze / Implementation of Proton Therapy Center in Prague

Halanič, Daniel January 2019 (has links)
The diploma thesis deals with the construction technological project of carcass SO – 001 Proton Therapy Center. The thesis is focused on part B (gantry) of hospital building Proton Therapy Center in Bulovka Hospital area in Prague. The thesis is being processed vertical and horizontal massive monolithic reinforced concrete skeleton realization. The thesis is report, budget, time schedule, technological specification, design of site equipment, design of machinery, design of road construction and next text and drawing documentation processed by assignment of diploma thesis.
99

Stavebně technologický projekt rekonstrukce objektu Rooseveltova v Brně / CONSTRUCTIONAL AND TECHNOLOGICAL PROJECT OF RECONSTRUCTION OF BUILDING ROOSEVELTOVA IN BRNO

Pavelka, Petr January 2019 (has links)
This diploma thesis deals with the constructional and technological project of reconstruction of building Rooseveltova in Brno. The basis for this work was the design documentation for the realization of this project. The technical reports provides all the basic information about the construction to this project. Demolition works and implementation of cast-in-place reinforced concrete floor are detailed processing in the technological regulations. Control and test plans, time and financial plans, drawings of building equipment, draft of machinery and plans of health and safety and fire prevention are also component of this project. Another annex of this thesis is budget and selected assembly details.
100

Vybrané části stavebně technologického projektu administrativní budovy s halou v Brně / Selected Parts of Construction Technology Project of an Office Building with a Hall in Brno

Bakyta, Marián January 2020 (has links)
This diploma thesis deals with selected parts of the construction technology project of an office building with a hall in Brno. The thesis contains a technical report, the coordination situation of the construction, the time and financial plan, the study of the main technological stages, the project of site equipment, the design of the main building machines and mechanisms, the time schedule, the budget, the technology prescription of flat single-roof, the quality control and test plan, the assessment of lifting mechanism selection and the design of rainwater capture for further use.

Page generated in 0.0715 seconds