• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 201
  • 5
  • 3
  • 3
  • 3
  • 1
  • 1
  • Tagged with
  • 218
  • 218
  • 195
  • 194
  • 159
  • 158
  • 157
  • 154
  • 154
  • 151
  • 149
  • 137
  • 135
  • 135
  • 127
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
61

Stavebně technologický projekt přípravy a realizace polyfunkčního objektu v Brně / Construction Project for Implementation of Multifunctional Building in Brno

Čačaný, Lukáš January 2022 (has links)
The main subject of this diploma thesis is a construction technological project of preparation and realization multifunctional building in Brno on Trugeněvova street. It is a new construction of the main building. It provides a technical report on the construction technology project, transport relations for the transport of materials and machinery to the construction site, following technical report of construction site equipment, construction technology study, design of machinery and last but not least elaboration of technological regulation for the execution of monolithic structures. Furthermore, the chapters on health and safety protection at work on the construction site, as well as the LEED certification system and the financial and time plan of the selected stage are elaborated.
62

Hotel v Čeladné - stavebně technologický projekt / Hotel in Čeladná - Construction technological project

Janek, Stanislav January 2012 (has links)
This thesis is focused on the developing of the implementation phase of the Hotel MIURA in the village of Čeladná. The project is describing particular stages of technological realization of this construction, technology, implementation of the main subject of hydro-insulation system, including design control and test plan for its implementation, design and description of site equipment, the draft contract for realization. The work is further supplemented by an objects schedule and detailing schedule of the main hotel building, a description of major equipment and materials used, budget for the main calculations of the object and other objects.
63

Železniční most na trati Brno - Česká Třebová v km 157,430 / Railway Bridge on the Track...

Kováčová, Zuzana Unknown Date (has links)
The subject of the diploma thesis is the design and check of the supporting structure of the railway bridge on the line Brno - Česká Třebová. The bridge carries a double-track railway line across Šámalova Street in Brno. The span of the bridge is 16.58 m, the length of the supporting structure is 17.1 m and the width in cross section is 17.81 m. Two variants of the supporting structure have been developed. The first variant is a bridge with a composite supporting structure, the second variant is a bridge with concreted steel girders. A technical report and drawing documentation are prepared for the selected variant.
64

Přístavba polyfunkčních prostor k výrobní hale - stavebně technologický projekt / Outbuilding of polyfunctional spaces for the production hall- construction technology project

Navrátil, Ondřej January 2016 (has links)
The subject thesis's topic is the technological implementation of rough upper construction's extension of the company BÖHM's polyfunctional space to technological shop floor located in district Červený Kříž in city of Jihlava. This thesis contains (includes) the implementation of the building's framework made up of ferroconcret and steel construction. The thesis namely includes the solution of the construction site equipment, the situation of the construction with the transport routes solution, the technical report, the technology study of the major technology stages, the bill of quantities and the itemized budget, the suggestion of the main lifting device, the evaluation of the main finance funds for building's construction, the technological instruction, the technical report of the construction site equipment, the schedule of work suggestion of the machine system, the control plan and test plan.
65

Příprava realizace víceúčelového domu Brno - Klíčova / Preparation realization multipurpose building Brno - Klíčova

Sviták, Roman January 2014 (has links)
The thesis is focused on the preparation of realization the multipurpose building Brno - Klíčova. The content of this the thesis is study of construction technology followed by the construction technology project. The aim of the thesis is to identify the sources of the time, money, workers and materials of the building and then select the appropriate process of realization.
66

Notes on the Approval and Modification of Environmental Management Instruments of the Mining Sector: Background, New Criteria and Challenges from Normative News / Apuntes Sobre la Aprobación y Modificación de los Instrumentos de Gestión Ambiental del Sector Minero: Antecedentes, Nuevos Criterios y Desafíos a Partir de Novedades Normativas

La Rosa Airaldi, Luis Antonio 10 April 2018 (has links)
The author addresses a broad overview of the significant role played by all those new developments and trends in science, technology and innovation (STI), which are applied to the environmental management of mining projects. It also examines the new provisions introduced by the D.S. No. 054-2013-PCM and D.S. No. 060-2013-PCM, as well as their complementary regulations (specifically, those of environmental relevance for the mining sector), in the context of policies aimed at stimulating the economy and promoting private investment that are being implemented by the Government. In addition, the article focuses on different practical situations and evaluates the relevant environmental implications that mining companies usually face when redesigning or modifying the components of their projects. Finally, analyzes the criteria of the Ministry of Energy and Mines concerning the rules on environmental management instruments for the mining industry, and the new regime applicable for amending these instruments, as well as the aspects, scope and measures that are being adopted and discussed with regards to the obligation of updating the approved environmental impact studies. / El autor muestra un panorama amplio del significativo papel que desempeñan los nuevos desarrollos en ciencia, tecnología e innovación (CTI) aplicados a la gestión ambiental de los proyectos mineros. Asimismo, analiza las nuevas disposiciones introducidas por los D.S. No. 054-2013-PCM y 060-2013-PCM, así como sus normas complementarias (específicamente, aquellas de relevancia ambiental para el sector minero), en el marco de las políticas de reactivación económica  y  promoción  de  la  inversión  privada  que  viene  implementando el Gobierno. Además, plantea distintas situaciones prácticas y evalúa las respectivas implicancias ambientales que, muchas veces, las empresas mineras afrontan al momento de rediseñar o modificar los componentes de sus proyectos. Por último, analiza los criterios del Ministerio de Energía y Minas respecto de la normativa en materia de los instrumentos de gestión ambiental en el sector minero (IGA) y del nuevo régimen aplicable a la modificación de los IGA, así como los aspectos, alcances y medidas que se vienen adoptando y discutiendo con relación a la obligación de actualizar los estudios ambientales aprobados.
67

Skladovací hala Dvořisko - stavebně technologický projekt / Storage hall in Dvořisko - construction technoly project

Bříza, Lukáš January 2018 (has links)
The subject of my thesis are selected parts of construction technology project of Construction of the Storage hall in Dvořisko, Choceň. This thesis solves technological regulation for monolithic construction, technological report site equipment, suitable choice of construction machinery, timetables, inspection and test plan, occupational safety and dealing with traffic routes.
68

Bytový dům Ivančice - stavebně technologický projekt / Apartment building in Ivančice - construction technology project

Fejfar, Michal January 2018 (has links)
The subject of the master´s thesis technological project of the Ivančice residential building in Ivančice. The building has one underground and four aboveground floors. The master´s thesis contains a technical report for the building technology project, broader transport routes, a timetable, a financial plan, time schedule, design of construction site installations, design of mechanical assemblies, technological prescription for construction of celling white tank, inspection and test plan, crane and design.
69

Stavebně technologický projekt mateřské školy / Building technological project nursery school

Alexa, Martin January 2018 (has links)
This thesis handles the construction and technological project of nursery school in the Brno. It deals with technical reports, technological methods of construction. The report contains technical reporst of building equipment, schedule, design of mechanical assembly, inspection and health and safety at work.
70

Novostavba administrativního objektu v Karviné, stavebně technologický projekt / New Administrative Building in Karviná, Construction Technological Project

Toman, Marek January 2018 (has links)
The diploma thesis deals with preparation, organization and construction technology of an administrative building in Karviná. It is about new building with four above ground floor. From a design point of view, the structure is designed as a precast concrete frame. The diploma thesis contains technical report, coordinating situation with design of transport ways, time financial plan, study of the implementation of the main technological phases, concept of construction site equipment, design of machinery set, time plan with worker bilancion, material delivery plan for rough building, technical report for masonry work, inspection and test plan for masonry work, item budget with the statement of measurements and noice study for earthworks.

Page generated in 0.0734 seconds