Spelling suggestions: "subject:"ehe construction site"" "subject:"hhe construction site""
191 |
Příprava realizace bytového domu v Brně - Modřicích / Preparation for the construction of an apartment building in Brno - ModřiceRůžička, Radek January 2019 (has links)
The diploma thesis deals with the lower and upper rough building of a apartment building. It includes a technical report, broader transport routes, a study of the implementation of the main technological stages, a technical report of the construction site equipment, the design of the main building machines and mechanisms, a plan for providing material resources for a reinforced concrete ceiling, a technological regulation for the rough bottom and top structure, work and monolithic constructions, gross building budget, risk plan and their measures, statement of the dimension and network graph for finishing works, thermal technical assessment of external structures, drawing of site equipment, situation, original state of the land and ramp diagram. It also contains time and financial plan of the building, schedule of the main building, schedule of construction and disposal of construction site equipment and balance of machines and workers.
|
192 |
Bytový dům v Ivančicích - stavebně technologický projekt / Apartment building in Ivančice - building technology projectŠagát, Pavel January 2019 (has links)
The goal of this thesis is a construction technological project of an apartment building in Ivančice. The work focuses on the graphic visualisation of earth and foundation works progress and consequently on the item budget and timetable for construction works. Technological regulation for earth and foundation works with the changes on foundation constructions, organization of the construction, construction site equipment plan, draft of the main machinery and mechanisms are also part of this work. Technical report, coordination layout with a description of transport options, schedule, and financial plan are also part of this thesis.
|
193 |
Řízení stavební zakázky / Construction Order ManagementSaňáková, Miroslava January 2020 (has links)
This diploma thesis solves problems of construction orders management. The key to successful business and stable position in a competitive market is the way of planning, managing and quality processing of construction orders. The aim of this diploma thesis is to describe and analyze the management of a construction order in a selected company, in my case ARCHATT, s.r.o. I also deal with this in this work, namely for the specific order Oprava Severního parkánu a hradeb of Prague Castle. The content of the work is a processed documentation of the supplier's preparation for this order and a detailed description of the entry of construction workers to this daily guarded building.
|
194 |
Vybrané části stavebně technologického projektu psychiatrické kliniky Fakultní nemocnice Brno / Selected Parts of the Construction Technology Project of the Psychiatric Clinic of the University Hospital BrnoDrozd, Michal January 2020 (has links)
The subject of my diploma thesis are selected parts of the construction technology project of the psychiatric clinic of the University Hospital Brno based on the provided project documentation. It is an extension of a new six-storey building to the existing buildings. The thesis contains a technical report to the construction technology project, the coordination situation of the construction, the situation of wider transport routes, time and financial plan by objects, study of the realization of the main technological stages, a site equipment design, a design of a machine set, technological regulation for monolithic structures, quality control and testing plan of monolithic structures, noise study and selected documents for LEED certification.
|
195 |
Obytný areál Ponavia park v Brně, příprava a organizace stavby / Preparation and Organization of ConstructionHladký, Dominik January 2020 (has links)
This thesis deals with the construction process of the apartment house Ponavia Park located in Brno. The thesis solves the individual realization phases of the main building phase. Building site equipment is designed for the projected construction process in three different variations. A technical report is also included in the building site. Critical points within the transport of materials and machines are also verified. A financial plan for the whole building is made as an summarizing time schedule for the apartment building. The sources for the financial plan are the figures taken from the Czech building objects classifications (JKSO). The summarizing time schedule is made in MS Projekt software and it’s designed as a Gantt diagram. A design of the main building machines and mechanisms was also made for the projected construction process. All of the machines were assessed for their respective required function on the building site. Also included in this thesis is a construction method for the reinforced concrete structures. The construction method deals with the realization process of waterproof concrete, reinforcement binding, formwork of the vertical and horizontal structures and also the process of concrete curing. The construction method is followed up by quality control and test plans for reinforced concrete structures, and a construction site safety plan that is made in the form of predicted main safety risks at the building site. For the noise load on the surrounding buildings a noise study is made. The study examines the intensity of noise in the protected outdoor space. This study was made in the Hluk+ software. The thesis also includes an item budget for the apartment house that was made in Build Power S software.
|
196 |
Stavebně technologický projekt pro Mezinárodní centrum klinického výzkumu Fakultní nemocnice u sv. Anny v Brně / Construction technology project of the International Clinical Research Center of St. Anne's University Hospital BrnoKozla, Dávid January 2020 (has links)
This diploma thesis solves the construction technology project of the International Clinical Research Center of the St. Anne’s University Hospital, Brno (ICRC), namely the first stage of the construction of the buildings "B1" and "C1". It tries to design an ideal technological process of construction with respect of local conditions. Technologically it focuses mainly on the issue of special foundation, namely protection of excavation pit with secant pile wall and pile foundation. There are processed technological regulations, time and financial plans, construction budget, control and test plan, plan of heavy equipment and safety or environmental requirements. Everything is supplemented by attachments and drawing documentation.
|
197 |
Vybrané části stavebně technologického projektu fotbalové tribuny Androva stadionu v Olomouci / Selected Parts of Building and Technological Project for Football Tribune of Ander Stadium in OlomoucGarláthy, Michal January 2013 (has links)
The theme of this diploma thesis are the Selected Parts of Building and Technological Project for Football Tribune of Ander Stadium in Olomouc. The content of this diploma thesis is the technological process of assembly of the building bearing construction of prefabricated concrete elements, the budget, the inspection and the test plan, the issue of safety and health at the construction site, the project concerning the construction site installation, the mechanical assembly, assessment of tower crane, object time and financial plan, construction technology study and the construction timetable.
|
198 |
Bytové domy v Brně, Bystrci - příprava a organizace výstavby / The Block of Flats in Brno, Bystrc - Project Planning and ManagementŠarlejová, Petra January 2014 (has links)
This thesis deals with the project planning and management of the construction of two houses of flats in Brno – Bystrc, Šemberova street. The houses of flats are designed as a newly built five floors above ground and one basement floor. The supporting system is made from brick ceramic blocks, underground floor is made of concrete blocks. This thesis processes technological project of building as preparation and building site equipment, use of machines necessary for implementation of the construction, monitoring and test plan, technological steps for basement walls of shuttering blocks. Finally, in this thesis dealt with time and cost of construction of houses of flats.
|
199 |
Stavebně technologický projekt sídla firmy Snowboard Zezula / Construction technology project of Company Snowboard ZezulaNěmec, Martin January 2014 (has links)
In this master´s thesis I am focusing on the Construction technology project of Snowboard Zezula Company. Major part of my thesis informs on a technical report for a construction technology project, a time and a financial plan of a construction, a realization study of the main technological stage, a plan of the main construction mechanism, a project of a construction site device with drawings, a financial calculation of the construction site devices and some technological rules, checking and testing plan for designed operations. Lastly I compare the two different designs of a load-bearing construction level and I calculate time of sheat removing with the economical calculation of the work fissure number.
|
200 |
Stavebně technologický projekt revitalizace těžní věže Brno / Construction and technological project of revitalization of mining tower in BrnoVšetečka, Jan January 2015 (has links)
The task of this diploma’s thesis was processing construction-technology project to revitalization the mining towers because of its current worsened state and subsequent adjustments for cultural activities.
|
Page generated in 0.1486 seconds