Spelling suggestions: "subject:"ehe construction site"" "subject:"hhe construction site""
171 |
Řízení stavební zakázky ve stavebním podniku / Construction Order Management in the Construction CompanyŠrámková, Michaela January 2022 (has links)
The thesis describes the project management of a construction contract in a construction company from the supplier's point of view. The work includes a theoretical and practical part. The theoretical part describes important definitions and knowledge, which are then used to create a practical part. It deals with the preparation and management of a specific construction contract called "Reconstruction of the sports hall Otrokovice" with the help of methods and procedures that the issue offers.
|
172 |
Obvodní oddělení policie ČR v Brně - Bohunicích, příprava realizace stavby / District Police Department of the Czech Republic in Brno-Bohunice, Preparation for ConstructionDubecký, Tomáš January 2022 (has links)
The aim of the diploma thesis is to prepare the construction called the District Police Department of the Czech Republic in Brno, Bohunice. The diploma thesis contains a technical report on the construction technology project, which deals with architectural and construction design solutions, coordination situation and transport routes, where critical points are assessed time and financial plan of construction, where all construction objects are described with their time and financial schedule, a study of the implementation of the main construction stages, which addresses the various stages of construction. The diploma thesis contains a technical report, item budget, plan for the establishment and liquidation of buildings and drawings of construction site equipment for each stage, design of the main construction machinery for the construction. A detailed time plan of the main building, a plan of its supply of materials for the rough construction was prepared for the given construction. Furthermore, the work contains a technological regulation for a reinforced concrete monolithic staircase, which is related to the control and test plan for a reinforced concrete monolithic staircase. The next assignment deals with the item budget of the main building for the rough construction, the drawing of the formwork for the reinforced concrete monolithic staircase and the economic assessment and evaluation of construction cranes.
|
173 |
Stavebně technologický projekt administrativní budovy Brno Business Park, 3. Etapa / Construction Project for implementation of administrative building of BBPJaneček, Milan January 2022 (has links)
The content of my diploma thesis is a construction technology project of an administrative building in Brno. The work emphasizes the feasibility of the object. I prepared an implementation study with a detailed solution of the construction process in terms of time and financial plan. Technological regulations, control and testing plans and occupational health and safety are proposed. Drawings are pre-pared for the performed construction
|
174 |
Stavebně technologický projekt hotelu v Ostrožské Nové vsi / Construction technology preparation of hotel in Ostrožská Nová vesKhamzina, Mariia January 2022 (has links)
The subject of this diploma thesis is civil technical project of a new building of the hotel Aztec in Ostrožská Nová Ves. The building was designed as a 6-storey building and will be used for accommodation and recreation. Thesis contains engineering report, a detailed time schedule for the main building object, project of construction site, technological notes and inspection and test plans for particular steps of construction, proposal of suitable machines and mechanisms required for construction and wider relationships of transport routes to construction site. It also includes protection of health and safety at work taking into account environmental protection.
|
175 |
Stavebně technologický projekt výrobní a skladovací haly / Construction-technological project of production and storage hallMarek, Jiří January 2022 (has links)
This diploma thesis deals with construction-technological project of production and storage hall in Hradec Králové. The thesis deals with complex of the implementation of the construction and focuses in more detail on the implementation of both foundation structures and assembly of the steel frame. The project includes a technical report on the construction technology project, a study of the implementation of the main technological stages of the main building, design and assessment of construction routes, construction equipment project, financial and construction schedule, machine design, schedule and budget of the main building, control and test plan for foundation structures, and occupational safety and health.
|
176 |
Stavebně technologický projekt výrobní a skladovací haly ve Vlkoši u Kyjova / Construction technological project of the production and storage hall in Vlkoš u KyjovaProkop, Petr January 2022 (has links)
The aim of this diploma thesis is to create a construction-technological project of the production and storage hall Ahorn CZ, s.r.o. As part of this work, technical report, study of the implementation of the main technological stages, project of the construction site equipment, time and financial plan of the construction, design of the main construction machines and mechanisms, item budget and time schedule were prepared. Further the thesis contains two technological regulations and two control and test plans.
|
177 |
Objekt „G" bytového komplexu „U Dubu“ v Jihlavě – stavebně technologický projekt / Building "G" of the residential complex "U Dubu" in Jihlava - construction technology projectSvízela, Martin January 2022 (has links)
The subject of this diploma thesis is the elaboration of a construction technological project for an apartment house in the complex "U Dubu" in Jihlava. Specifically, we dealt with building G (designated as D1.06). This building is based on foundation strips and has one underground and five above-ground floors. The content of the work is a technical report on the construction technology project, elaboration of technological regulation for the given stage, construction site equipment project, evaluation of wider transport relations, time schedule for the given stage and item budget of rough construction. Furthermore, a control and test plan, design of machine sets, work safety solutions, construction calculation according to THU and comparison of masonry systems are also developed.
|
178 |
Bytové domy A a B v Nemocniční ulici v Uničově - stavebně technologická příprava stavby / Apartment buildings A and B in the Nemocniční street in Uničov - constructive-technological preparation of the constructionFaltynková, Pavla January 2012 (has links)
This thesis deals with constructive -technological solutions of construction of two residential buildings A and B in Uničov. The thesis includes preparation and construction site equipment, technological prescription for implementation of anhydrite floors, time schedule and financial plan of construction, project budget, monitoring and test plans, instructions for maintenance, fire problem solution and security plan for requirements of the EMS.
|
179 |
Stavebně technologického řešení Vzdělávacího komplexu v Brně / Technological solution for the education complex in BrnoBlažek, David January 2012 (has links)
This master’s thesis deals with construction of the gross building of new building of learning complex FEKT VUT in Brno. It contains the design of earthworks, underground setting piles, monolithic structures and isolation of the building for further construction. Construction and technological project includes technical report, time and financial plan of construction, study of the implementation of major technological stages of site preparation, budget of facilities, technological regulation to solved stages, inspection and test plan of monolithic structures, health and safety plan and energy label of objects.
|
180 |
Stavebně technologický projekt terasového bytového domu v Brně / Technological project of the terrace apartment houseBaštová, Veronika January 2012 (has links)
The project deals with building technological study of the new building apartment house in Brno. Dimensions of the apartment building are 29.2 m x 57.2 m with shape of a rectangle. The apartment house is designed terraced in five floors as a brick structure of the ceramic blocks. Ceilings and construction in contact with the ground is reinforced concrete. In groundfloor are located garages, other floors are designed as residential. The project deals with technological processes of bottom building, time and financial demands of construction.
|
Page generated in 0.0979 seconds