Spelling suggestions: "subject:"power crack"" "subject:"lower crack""
11 |
Novostavba administrativní budovy a školícího střediska v Humpolci - příprava realizace a řízení stavby / Administrative and training center building in Humpolec - Project planning implementation of constructionDvořák, Tomáš January 2015 (has links)
The diploma thesis deals with the constructive-technological project of the administrative building in Humpolec.This project mainly addressed construction by the building structures, site equipment, implementation of cast-in-place reinforced concrete floor, budget and chronological plan of buildings. The work was based on the project for implementation.
|
12 |
Bytový dům v Třebíči - příprava a realizace stavby / Preparation and realization of apartment house in TřebíčKrejčí, Michal January 2012 (has links)
This Master’s thesis deals with the technological project and realization of apartment house in Třebíč. This work includes technical reports ZS and STP, site equipment, wider transport relations, budget calculation, time planning, inspection and test plan, design mechanisms and job security for this building.
|
13 |
Stavebně technologický projekt rezidenčního domu v Brně / Building and technological project of a residential house in BrnoPodškubka, Martin January 2018 (has links)
The subject of this Diploma thesis is building and technological project of a residential house in Brno, which contain the implementation of the underground car park and residential building, which has three above-ground floors. Attention is focused mainly on the technological processes of bottom building. Text section contains the technical report on the structural and technological project, study implementation of major technological stages of building, technical report of construction site equipment, technological regulations, inspection and test plan, study of noise, plan health and safety at work, the design of the main building machines and mechanisms including transport routes. The attachment section contain time and financial plan construction-object, time deployment of machines, plan of material resources, time schedule, technology standard, budget, drawings of construction site equipment, verification of tower crane construction and schema of processes concreting.
|
14 |
Administratívna budova v Trenčíne - stavebno technologický projekt / Office building in Trencin - construction technology projectPanáček, Jakub January 2018 (has links)
The subject of my dissertation is to describe construction technology project of the administration building in Trencin. I focused on the budget, work schedule, environmental protection, appropriate setup of temporary objects on the construction site and efficient machine assembly. Result of work represents possible construction progression with focus on site condistions.
|
15 |
Nájemní objekt Campus Bohunice – stavebně technologický projekt / The lease object Campus Bohunice - construction technology projectPlatzerová, Veronika January 2018 (has links)
The subject of this diploma thesis is the construction and technological solution of the construction of the campus building Bohunice - object C. This building is a new building located on several unfinished parcels. The diploma thesis contains technical reports, technological regulations of the selected works, control and test plans for these works, design of the machine group, the transport relations in the narrower and wider surroundings of the construction, the budget budget, the timetable, the design and realization of the tower cranes.
|
16 |
Stavebně technologický projekt polyfunkčního domu, Staré Brno / Architectural and technological project of multifunctional building, Old BrnoHradečný, Štěpán January 2018 (has links)
The diploma thesis deals with the technological stage of the lower structure, namely laying on piled foundations, including laying of a building pit with pilot reinforced concrete walls, and a rough top structure made of reinforced concrete walls, cores and reinforced concrete ceiling structure. The content is a technical report, solutions of wider transport relations, time and financial planning, studies of the main technological stages, equipment of the construction site of solved stages, design of the main building machines and mechanisms, technological regulations, control and test plans, safety and health protection at work, , thermal engineering assessment of selected constructions, budget, staff deployment balance, work progress scheme.
|
17 |
Bytový dům, Brno ulice Bělohorská. Stavebně technologická příprava stavby. / Apartment building, Brno Bělohorsk street.Civil technical projectDivácký, Petr January 2019 (has links)
The subject of this diploma thesis is construction-technological preparation of a residential building in Julianov. It includes a technical report on building structures, a construction technology study, a technological prescription, a control and test plan, a site equipment design, a design of a machine set, an item budget, a timetable, and a design for the implementation of paved areas.
|
18 |
Bytový dům U Vojanky – stavebně technologická příprava / Residential House at Vojanky - construction-technological preparationAndres, Josef January 2013 (has links)
The content of this thesis is the construction project of technological of residential building U Vojanky in Prag. The new residential building is comprised of two parts that are interconnected by connecting neck. Author deals with the most important technology stages of construction that are processed in following parts of this thesis.
|
19 |
Wellness centrum Jinačovice, stavebně technologická příprava stavby. / Wellness centre Jinačovice, civil technological project.Rada, Stanislav January 2014 (has links)
The subject of this thesis is also dealt with construction of the second phase of the congress and wellness centre in Jinačovice. The work includes technical report, time and financial plan, project site equipment, technical regulations, inspection and test plans, implementation of technology water impermeable concrete
|
20 |
Výstavba bytových domů Optátova - stavebně technologický projekt / Construction of apartment houses Optátova - building technology projectKynclová, Veronika January 2014 (has links)
Diploma work deals Construction of apartment houses Optátova - building technology project. Work includes the technical report, coordination situation, timetable, financial plan, study of realization, drawing of devide construction and his financial and timetable evaluation, next timetable of construction, timetable of main objekct, supplies of building materials, technological specification, inspection and test plan, itemized budget of main object and contract of work. Time methods were compared – gradual, concurrent and current method.
|
Page generated in 0.0775 seconds