• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 37
  • 1
  • 1
  • Tagged with
  • 43
  • 43
  • 35
  • 33
  • 30
  • 30
  • 28
  • 28
  • 27
  • 26
  • 25
  • 25
  • 25
  • 24
  • 24
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Školící středisko Zašová - stavebně technologický projekt / Training Center Zašová - construction technological project

Janíček, Jakub January 2014 (has links)
The subject of work is building-technology project Training center in Zasova. The study includes a technical report on the construction technological project, technical report of the site equipment project including a drawings, design of the main building machines, technical report of transport relations, itemized budget, the detailed time plan of the construction, technology regulations to of the selected construction processes, inspection and testing plans, occupational safety, environment, contract for construction works, major lifting mechanisms evaluation from an economic perspective.
22

Bioplynová stanice-stavebně technologický projekt / The biogas station - Construction Technology Project

Fatura, Josef January 2015 (has links)
The subject of my thesis is the technological phase biogas plant. I focused in detail on the buildings SO01 - Hala income and treatment of raw materials and SO02 - Operating building a cogeneration unit. The concreting, formwork and reinforcement substructure object SO01 I developed technological prescription. Furthermore, my work includes a technical report on the structural and technological project, construction situation, time and financial planning, study, implementation of major technological stages, construction machinery, crane assessment, project site equipment, plan for securing material resources for SO01, inspection and test plan, plan OSH and itemized budget.
23

Viladům v Humpolci - stavebně technologický projekt / Villahouse in Humpolci - building and technological project

Březina, Vojtěch January 2016 (has links)
The work includes construction of a residential building technological project Villahouse Humpolec. Residential building has five floors with ten housing units. In the first above ground is a garage and workshop with separate entrance. The author discusses the main technological stages of construction, which are processed in the following sections of this paper.
24

Vybrané části stavebně technologického projektu - Bytový dům Novostrašnická / The selected parts of construction technology project - Apartment building Novostrašnická

Věrný, Roman January 2016 (has links)
This thesis is focused on selected parts of building technological project of apartment house Novostrašnická in Prague. The project contained technical report, coordinating situation with distinguished traffic routes, object-oriented time and financial plan, study of essential technological phases, report of building equipment and drawing of building equipment for different phases, the design of mechanical arrangement, the work schedule for fabric, plan for securing material resources, technological prescript and control trial plan for drilled piles, budget and design of lifting mechanisms.
25

Areál TRIANGL v Uherském Hradišti - stavebně technologický projekt / Campus TRIANGL Uherske Hradiste - construction technology project

Chamrádová, Klára January 2016 (has links)
The subject of this thesis is a construction technology project Areal triangle in the town of. The work includes a technical report on the structural and technological project technical report construction site along with drawings of building equipment, technological prescription for the implementation process of monolithic structures, being associated inspection and test plan, as well as draft mechanical assemblies, technical report broader transport relations, including drawings, itemized budget calculation according THU and the timetable for construction. It also dealt with contract work, instructions for use of the building and assess two variants of cranes in economic terms. Also at work are chapters dealing with safety at work and environmental protection. More specifically, the work deals with one of the main buildings, namely the object SO10 - Building A. The construction is a reinforced concrete monolith on five floors. The work is mainly focused on the shell construction.
26

Bytový dům Vídeňská -stavebně technologický projekt / Viennese apartment house -building technology project

Staněk, Martin January 2017 (has links)
This thesis is focused on selected parts of building technological project apartment house Videnska in Brno concretly for lap C1 and C2. The project contained technical report, coordinating situation with distinguished trafic routes, object time plan and financial plan, study of main technological lap, technical report of building equipment and drawing of building equipment for differents lap, the design of mechanical arrangement of machine, the work schedule for construction, plan for securing material resources for monolithic ceiling, technological prescript and control trail plan for monolithic cailing, budget and design of lifting mechanisms
27

Generative Design for Construction Site Layout Planning

Raj Pradip Birewar (10664183) 07 May 2021 (has links)
<p>The construction industry contributes significantly to the GDP of the United States, attributing to its growth at an unprecedented rate. Efficient planning on all stages of construction is the only way to combat dynamic obstructions and deliver projects on time. The first element involved in the planning phase deals with the layout of the Construction Site. It significantly regulates the pace at which construction operations function and directly affects the time, cost, and safety linked to the successful delivery of the target project. Hence, it is paramount to ensure that every component of the construction site maneuvers with the utmost productivity. One such equipment that occupies significant attention while carrying out the CSLP process is Tower Crane. Tower crane optimization is pivotal to ensure proper lifting and handling of materials, and warrant conflict-free work zones. This research, therefore, aims to optimize its position by maximizing the lift ability. To achieve the goals, Generative Design- a paradigm that integrates the constructive features of mathematical and visual optimization techniques, is used to develop a relatively comprehensible prototype. The first part of the research, thus, utilized Generative Design on two construction sites- one from the United States and one from India. After implementing the visual programming algorithm, an improvement of 40% was warranted in the lift score. A pool of potential alternatives was explored and supplemented by the trade-off illustrations. The concept of trade-off was substantiated by allowing a framework for prioritization of lift cycles, and facilitating a holistic decision-making process. To evaluate the usability, 12 participants were chosen based on their previous experience with tower crane operations. The participants witnessed a live demonstration of the algorithm, answered a Likert scale questionnaire, and appeared for an open-ended interview to provide feedback about the proposed Generative Design technique. After carrying out narrative analysis for the usability aspect- it has been unanimously observed that the technique has extreme efficiency of usage and can evidently prevent the occurrence of errors. The study concludes by providing recommendations to augment the significance and usability of Generative Design for tower crane position optimization. </p><br>
28

Výstavba školy Rajhrad – stavebně technologická příprava / Construction of school Rajhrad – construction and technological preparation

Kijonka, Jakub January 2012 (has links)
Subject of this master thesis is the structural and technological background for the construction of high school in Rajhrad. This consists of time and finanical plans, technological instructions for the reinforced concrete monolithic skeleton, time schedule, item budget, construction site layout, machinery configuration , audit and evaluation plans, work place safety protocols, environmental plan of the construction site.
29

Stavebně technologický projekt bytového domu v Ohrazenicích / CONSTRUCTION TECHNOLOGICAL PROJECT OF APARTMENT BUILDING IN OHRAZENICE

Zdražil, Luboš Unknown Date (has links)
The master´s thesis describes the realization of new apartment building in Ohrazenice. The thesis contains a technical report of the construction-technical project, studies of relatization of the main technological stages and report of the building equipment. I designed the main construction machines and mechanisms. An optimized budget with a bill of quantitiesand detailed construction schedule and a graph of staff needs is prepared for the SO01 building. The thesis also deals with technology of drilled piles and prepared a technological regulativ, schedule of occupational health and safety and a control and test plan.
30

Stavebně technologický projekt domu s pečovatelskou službou Ždírec nad Doubravou / Construction technology project of a nursing home Ždírec nad Doubravou

Soukupová, Daniela Unknown Date (has links)
The diploma thesis deals with the construction of a new nursing home in Ždírec nad Doubravou. It is a four-storey prefabricated structure, where on the first floor there are three surgeries for doctors and on the remaining three floors there are apartments for clients of the building. In hhe work is a implementation study of the main technological stages, assessment of the transport solution, time and financial plan together with the calculation of the main building according to THU. The equipment of the construction site with drawings and design of the main machines and mechanisms is also solved. For selected technological processes, an itemized budget with statement of quantities, time schedule and technological precription for the assembly of prefabricated ceiling elements together with a control and test plan. In the last points, the technological precription for the floors of the clean zone of medical surgeries is solved with a proposal of measures according to the LEED 2009 certification and a noise study.

Page generated in 0.0586 seconds