• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 12
  • Tagged with
  • 12
  • 12
  • 9
  • 6
  • 6
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Caracterização de payloads via telemetria

Teixeira, Lucas Augusto Costa January 2016 (has links)
O preço atual do minério de ferro obrigou as empresas a reduzirem os custos operacionais na fase mina. O carregamento e transporte de materiais com utilização de escavadeiras e caminhões grande porte representam grande parcela do custo total, particularmente com pneus, diesel, manutenção e mão de obra. Metas de movimentação anual são divididas durante os meses e as condições climáticas podem influenciar na produtividade e desempenho dos equipamentos. O banco de dados da movimentação mensal está condicionado com a capacidade de cada caminhão. Cada frota possui o payload característico e este representa a capacidade de transporte, sendo o valor da massa transportada o único parâmetro extraído em cada ciclo, sem considerar o posicionamento do material sobre a caçamba dos equipamentos. Forças de cisalhamento e torção são aplicadas constantemente no chassi e pneus dos caminhões e, quando as cargas estão descentralizadas, potencializam estes eventos. O transporte de cargas descentralizadas agride os pneus diminuindo a vida útil causando danos como deslocamento da banda de rodagem e separação do flanco. Este trabalho teve como objetivo diminuir as ocorrências de cargas descentralizadas e os custos operacionais. Para incrementar o posicionamento do material sobre as caçambas, a telemetria foi a ferramenta utilizada. Análises de pressões de suspensões indicam o posicionamento das cargas e através desses valores foi criado um banco de dados. Este banco de dados pode indicar qual operador de carga precisa de reciclagem, contribuindo para a redução de cargas descentralizadas e custos, uma vez que cargas deste perfil sucateiam precocemente pneus e suspensões. O estudo foi realizado em Itabira, em uma mina de minério de ferro a céu aberto. A metodologia comprovou ser capaz diminuir as ocorrências de cargas descentralizadas assim como aumentar a vida útil de pneus. Uma possível economia foi apresentada para ano de 2014, período em que a média das horas trabalhadas de pneus ficou abaixo da meta aumentando os custos fase mina. / The actual iron ore price forces the companies to reduce costs in all production steps of the mining operation. Loading and hauling materials using shovel-truck system represents the highest mining costs, particularly tires, diesel, maintenance and workforce. Annual goals of materials movement are split by months were weather conditions can affect productivity and performance of the fleet. The data file of the monthly material movement is based on the scale of each truck. Every fleet has a payload and it represents the capacity of hauling, being the value of loading a unique input extracted in each duty cycle, without taking into account the position of the material over the truck’s dump. Shear forces and torsion are applied all time at the frames trucks and, when the truckloads are unbalanced, increases the forces over the frame and tires. Transport unbalanced truckloads into long distances attack the tires and decrease its end of life, causing damages like displacement of tread and flank separation. The objective of this study is to propose a methodology to decrease unbalanced truck loads reducing the mining costs. In this mission of incorporating a material position on the truck´s dump, the telemetry was taking into consideration. The analysis of the suspension pressures data values shows the truckloads positions and with this data was created a databank. This databank indicates that the operators need truck load training to reduce unbalanced loads and truck costs in the mining operation, since unbalanced loads leads to early tires and suspensions scrap. The case study was carried out at Itabira Iron Ore Mine Complex, Brazil. This methodology was able to reduce the number of unbalanced truck loads as well as the tires life was increased. An economic saving estimate is presented based on 2014 scrapped tires data bank, in this year the tires life cycle was underneath, burdening operational costs.
2

Programação linear na análise de viabilidade técnica e econômica de projeto multimina

Silva, Pedro Augusto Costa January 2016 (has links)
Os custos de produção de minério de ferro possuem variações de acordo com a especificidade de cada mina. Na fase mina, dois dos maiores custos de produção estão associados aos índices: distância média de transporte e a relação estéril minério. A implantação do projeto de múltiplas minas e correias transportadoras em Itabira visa diminuir os custos associados a estes dois indicadores. O método de alimentação da planta de beneficiamento oriundo de múltiplas minas foca em reduzir a relação estéril minério global do complexo e a implantação de correias transportadoras mitiga o aumento da distância média de transporte. O presente trabalho tem seu enfoque em uma proposta de lavra de múltiplas minas e de uma pilha de minério para alimentação de três diferentes usinas. Propõem-se um modelo de programação linear por metas que determinará a melhor alimentação das usinas, menor distância média de transporte e menor relação estéril minério. Este modelo de otimização foi elaborado utilizando o software LINGO com interface com EXCEL, e avalia cenários diversificados entre o transporte por caminhões fora de estrada e o transporte misto entre caminhões fora de estrada e transportadores de correia de longa distância. Os resultados apresentados mostram que o método de múltiplas minas é uma saída técnica e economicamente viável para melhor aproveitamento das jazidas do Complexo Minerador de Itabira, apresentando uma economia que varia de US$82M até US$118M dependendo do local de instalação das unidades de Britagem Semimóvel (BSMs). / Production costs of iron ore varies according to the specificity of each mine. In the mining phase, some of the largest operational costs are associated to the haulage distance and the stripping ratio. In this context, the implementation of the multiple mines project and the conveyor belts at the Itabira Complex Mines aims to optimize these two indicators. The multiple mines methodology focuses on reducing the overall stripping ratio of the complex, and the implementation of conveyor belts mitigates the increase of the haulage distance. Two mines and a stock pile are available to feed three different concentration plants. The goal is to achieve the best way to feed the plants considering the economic aspects. A linear goal programming model is proposed to determine the best iron ore mass feeding the plants from different mines, taking into account the least haulage distance and the smallest stripping ratio. This optimization model was developed using LINGO Software to interface with EXCEL and evaluate diversified scenarios. The results showed that the method of multiple mines is a technical and economically viable method for mine planning at the Itabira Complex.
3

Desenvolvimento de um modelo de dimensionamento de equipamento de escavacao e de transporte em mineração

Racia, Ismael Momade January 2016 (has links)
O motivo da dissertação “Desenvolvimento de um Modelo de Dimensionamento de Equipamentos de Escavação e de Transporte” surgiu da necessidade de apoiar no processo de decisão de dimensionamento dos principais equipamentos de mineração. Este trabalho apresenta um modelo simples e direto para dimensionar os equipamentos principais de mineração (escavadeiras e caminhões) através de uma rotina criada denominada EXCEsimulator, concebido para o cálculo da capacidade das caçambas das escavadeiras, do número dos equipamentos de escavação e de transporte, bem como os tempos de espera das unidades de transporte em carregar. Para tal, definem-se os parâmetros de produtividade e caraterísticas dos equipamentos; calcula-se aplicando um modelo determinístico de produção; e faz-se o levantamento de equipamentos existentes no mercado, reunindo as suas características e serviços prestados pelos representantes ou fabricantes das marcas. Para demostrar a funcionalidade do modelo desenvolvido, o presente trabalho demonstrou, através de um estudo de caso, o dimensionamento de uma frota de carregamento e transporte para uma mineração a céu aberto utilizando indicadores de produção, e uma comparação entre o uso de equipamentos de pequeno e grande porte no aspeto da demanda de equipamento. O estudo foi desenvolvido a partir de uma empresa de mineração hipotética baseada em dados realista. O modelo desenvolvido é aplicável a qualquer tipo de equipamento de escavação e de transporte, independente do seu porte e capacidade de produção. Como conclusão, pretende-se com esta dissertação fornecer uma ferramenta útil para o apoio à decisão de dimensionamento de equipamentos e frotas de escavação e de transporte capaz de suprir a necessidade de uma consulta de mercado. / The reason for the dissertation "Development of an Estimating Model for Excavation and Transport Equipment" arose from the need to support the decision-making process for the size of the main mining equipment. This work presents a simple and direct model for sizing the main mining equipment (excavators and trucks) through a routine created called EXCEsimulator, designed to calculate the capacity of excavator buckets, number of excavation and transport equipment, and As the waiting times of the transport units on loading. For this, the parameters of productivity and characteristics of the equipment are defined; Is calculated by applying a deterministic model of production; And it is made the survey of existing equipment in the market, gathering its characteristics and services provided by the representatives or manufacturers of the brands. To demonstrate the functionality of the developed model, the present study demonstrated, through a case study, the design of a loading and transport fleet for open pit mining using production indicators, and a comparison between the use of small equipment And large in the aspect of equipment demand. The study was developed from a hypothetical mining company based on realistic data. The developed model is applicable to any type of excavation and transportation equipment, regardless of its size and production capacity. In conclusion, it is intended with this dissertation to provide a useful tool to support the decision on sizing equipment and excavation and transport fleets capable of supplying the need for a market consultation.
4

Influência da operação de desmonte de rochas no carregamento de material fragmentado

Botelho, Anneliese Honscha January 2014 (has links)
O ciclo produtivo mineiro é composto essencialmente pelas seguintes operações: Perfuração & Desmonte (P & D), Carregamento, Transporte, Cominuição e Beneficiamento. Sendo assim, tem-se um modelo de produção em série onde uma etapa é dependente da outra. Portanto, melhorias nos estágios iniciais impactarão na eficiência e produtividade dos estágios subsequentes. A etapa de Perfuração & Desmonte, sendo responsável pela fragmentação primária do material, representa, neste modelo, o fornecedor de material para as operações que seguem, devendo atender a curva granulométrica demandada pelo britador primário. No entanto, por tratar-se de uma linha de produção em série, a curva granulométrica definida pelo britador primário, irá influenciar os processos intermediários, carregamento e transporte, bem como, no caso de uma fragmentação inadequada, todo o processo será prejudicado. Assim, deve-se avaliar a produtividade e a eficiência de todas as etapas de modo a definir a curva granulométrica (fragmentação) que melhor atende os equipamentos utilizados na mina, gerando uma maior produção com os menores custos possíveis. O presente trabalho faz uma análise entre a fragmentação da rocha e a eficiência e produtividade da etapa de carregamento do material, discutindo os principais fatores que influenciam esta operação. Visando estabelecer uma metodologia, realizou-se um estudo de caso em uma mina de ferro, onde se buscou determinar os diversos tempos de ciclo dependentes da fragmentação gerada pelo desmonte, relacionando a fragmentação aos fatores envolvidos no carregamento. Analisou-se, também, o grau de influência que a etapa de Perfuração & Desmonte tem sobre a etapa de carregamento, uma vez que elas se sobrepõem em determinados pontos da produção e, a realização de uma, por vezes, interrompe a outra. Tem-se, assim, que a operação de P & D impacta diretamente na massa carregada e, quando esta operação não é adequada, pode reduzir drasticamente a quantidade de horas trabalhadas pelos equipamentos de carregamento, uma vez que estes sofrerão um maior desgaste e apresentarão um maior número de manutenções, bem como a etapa de P & D inadequada irá aumentar o número de horas improdutivas. / The mining productive cycle is comprised essentially for the following unit operations: drill and blast (D&B), loading, haulage, comminution and mineral processing. Thus, there is a model of mass production where one step depends on another. Therefore, improvements in the initial stages will impact on the efficiency and productivity of the subsequent stages. D & B being the responsible for the primary fragmentation of the material is, in this model of production, the material supplier for the operations that follow, should attend the grading curve demanded by the primary crusher. However, because it is a line of series production, the grading curve defined by the primary crusher will influence on the intermediaries processes, loading and haulage, as well as in the case of improper fragmentation, the whole process will be impaired. So, it is necessary evaluate the productivity and the efficiency of all steps to set the grading curve (fragmentation) that suits the equipment used in the mine, generating the more output with the lowest possible cost. This dissertation carried out analysis on: rock fragmentation, efficiency and productivity of the loading material, discussing the main factors that influence these operations. In order to establish a methodology, a case study in an iron ore mine was performed, where the cycle time dependent on the fragmentation generated by the blast was sought and relating the fragmentation to the factors involved in loading. D & B degree of influence in load step was also analyzed, since it overlap at some points of production and, sometimes, one step interrupts other. Thereby, the D & B operation directly impacts on the loading mass and, when this mass is improperly fragmented, it can drastically reduce the amount of working hours of the loading equipment, because this equipment will suffer more damage and will need more maintenance, as well as an inappropriate D & B will increase unproductive hours.
5

Caracterização de payloads via telemetria

Teixeira, Lucas Augusto Costa January 2016 (has links)
O preço atual do minério de ferro obrigou as empresas a reduzirem os custos operacionais na fase mina. O carregamento e transporte de materiais com utilização de escavadeiras e caminhões grande porte representam grande parcela do custo total, particularmente com pneus, diesel, manutenção e mão de obra. Metas de movimentação anual são divididas durante os meses e as condições climáticas podem influenciar na produtividade e desempenho dos equipamentos. O banco de dados da movimentação mensal está condicionado com a capacidade de cada caminhão. Cada frota possui o payload característico e este representa a capacidade de transporte, sendo o valor da massa transportada o único parâmetro extraído em cada ciclo, sem considerar o posicionamento do material sobre a caçamba dos equipamentos. Forças de cisalhamento e torção são aplicadas constantemente no chassi e pneus dos caminhões e, quando as cargas estão descentralizadas, potencializam estes eventos. O transporte de cargas descentralizadas agride os pneus diminuindo a vida útil causando danos como deslocamento da banda de rodagem e separação do flanco. Este trabalho teve como objetivo diminuir as ocorrências de cargas descentralizadas e os custos operacionais. Para incrementar o posicionamento do material sobre as caçambas, a telemetria foi a ferramenta utilizada. Análises de pressões de suspensões indicam o posicionamento das cargas e através desses valores foi criado um banco de dados. Este banco de dados pode indicar qual operador de carga precisa de reciclagem, contribuindo para a redução de cargas descentralizadas e custos, uma vez que cargas deste perfil sucateiam precocemente pneus e suspensões. O estudo foi realizado em Itabira, em uma mina de minério de ferro a céu aberto. A metodologia comprovou ser capaz diminuir as ocorrências de cargas descentralizadas assim como aumentar a vida útil de pneus. Uma possível economia foi apresentada para ano de 2014, período em que a média das horas trabalhadas de pneus ficou abaixo da meta aumentando os custos fase mina. / The actual iron ore price forces the companies to reduce costs in all production steps of the mining operation. Loading and hauling materials using shovel-truck system represents the highest mining costs, particularly tires, diesel, maintenance and workforce. Annual goals of materials movement are split by months were weather conditions can affect productivity and performance of the fleet. The data file of the monthly material movement is based on the scale of each truck. Every fleet has a payload and it represents the capacity of hauling, being the value of loading a unique input extracted in each duty cycle, without taking into account the position of the material over the truck’s dump. Shear forces and torsion are applied all time at the frames trucks and, when the truckloads are unbalanced, increases the forces over the frame and tires. Transport unbalanced truckloads into long distances attack the tires and decrease its end of life, causing damages like displacement of tread and flank separation. The objective of this study is to propose a methodology to decrease unbalanced truck loads reducing the mining costs. In this mission of incorporating a material position on the truck´s dump, the telemetry was taking into consideration. The analysis of the suspension pressures data values shows the truckloads positions and with this data was created a databank. This databank indicates that the operators need truck load training to reduce unbalanced loads and truck costs in the mining operation, since unbalanced loads leads to early tires and suspensions scrap. The case study was carried out at Itabira Iron Ore Mine Complex, Brazil. This methodology was able to reduce the number of unbalanced truck loads as well as the tires life was increased. An economic saving estimate is presented based on 2014 scrapped tires data bank, in this year the tires life cycle was underneath, burdening operational costs.
6

Programação linear na análise de viabilidade técnica e econômica de projeto multimina

Silva, Pedro Augusto Costa January 2016 (has links)
Os custos de produção de minério de ferro possuem variações de acordo com a especificidade de cada mina. Na fase mina, dois dos maiores custos de produção estão associados aos índices: distância média de transporte e a relação estéril minério. A implantação do projeto de múltiplas minas e correias transportadoras em Itabira visa diminuir os custos associados a estes dois indicadores. O método de alimentação da planta de beneficiamento oriundo de múltiplas minas foca em reduzir a relação estéril minério global do complexo e a implantação de correias transportadoras mitiga o aumento da distância média de transporte. O presente trabalho tem seu enfoque em uma proposta de lavra de múltiplas minas e de uma pilha de minério para alimentação de três diferentes usinas. Propõem-se um modelo de programação linear por metas que determinará a melhor alimentação das usinas, menor distância média de transporte e menor relação estéril minério. Este modelo de otimização foi elaborado utilizando o software LINGO com interface com EXCEL, e avalia cenários diversificados entre o transporte por caminhões fora de estrada e o transporte misto entre caminhões fora de estrada e transportadores de correia de longa distância. Os resultados apresentados mostram que o método de múltiplas minas é uma saída técnica e economicamente viável para melhor aproveitamento das jazidas do Complexo Minerador de Itabira, apresentando uma economia que varia de US$82M até US$118M dependendo do local de instalação das unidades de Britagem Semimóvel (BSMs). / Production costs of iron ore varies according to the specificity of each mine. In the mining phase, some of the largest operational costs are associated to the haulage distance and the stripping ratio. In this context, the implementation of the multiple mines project and the conveyor belts at the Itabira Complex Mines aims to optimize these two indicators. The multiple mines methodology focuses on reducing the overall stripping ratio of the complex, and the implementation of conveyor belts mitigates the increase of the haulage distance. Two mines and a stock pile are available to feed three different concentration plants. The goal is to achieve the best way to feed the plants considering the economic aspects. A linear goal programming model is proposed to determine the best iron ore mass feeding the plants from different mines, taking into account the least haulage distance and the smallest stripping ratio. This optimization model was developed using LINGO Software to interface with EXCEL and evaluate diversified scenarios. The results showed that the method of multiple mines is a technical and economically viable method for mine planning at the Itabira Complex.
7

Desenvolvimento de um modelo de dimensionamento de equipamento de escavacao e de transporte em mineração

Racia, Ismael Momade January 2016 (has links)
O motivo da dissertação “Desenvolvimento de um Modelo de Dimensionamento de Equipamentos de Escavação e de Transporte” surgiu da necessidade de apoiar no processo de decisão de dimensionamento dos principais equipamentos de mineração. Este trabalho apresenta um modelo simples e direto para dimensionar os equipamentos principais de mineração (escavadeiras e caminhões) através de uma rotina criada denominada EXCEsimulator, concebido para o cálculo da capacidade das caçambas das escavadeiras, do número dos equipamentos de escavação e de transporte, bem como os tempos de espera das unidades de transporte em carregar. Para tal, definem-se os parâmetros de produtividade e caraterísticas dos equipamentos; calcula-se aplicando um modelo determinístico de produção; e faz-se o levantamento de equipamentos existentes no mercado, reunindo as suas características e serviços prestados pelos representantes ou fabricantes das marcas. Para demostrar a funcionalidade do modelo desenvolvido, o presente trabalho demonstrou, através de um estudo de caso, o dimensionamento de uma frota de carregamento e transporte para uma mineração a céu aberto utilizando indicadores de produção, e uma comparação entre o uso de equipamentos de pequeno e grande porte no aspeto da demanda de equipamento. O estudo foi desenvolvido a partir de uma empresa de mineração hipotética baseada em dados realista. O modelo desenvolvido é aplicável a qualquer tipo de equipamento de escavação e de transporte, independente do seu porte e capacidade de produção. Como conclusão, pretende-se com esta dissertação fornecer uma ferramenta útil para o apoio à decisão de dimensionamento de equipamentos e frotas de escavação e de transporte capaz de suprir a necessidade de uma consulta de mercado. / The reason for the dissertation "Development of an Estimating Model for Excavation and Transport Equipment" arose from the need to support the decision-making process for the size of the main mining equipment. This work presents a simple and direct model for sizing the main mining equipment (excavators and trucks) through a routine created called EXCEsimulator, designed to calculate the capacity of excavator buckets, number of excavation and transport equipment, and As the waiting times of the transport units on loading. For this, the parameters of productivity and characteristics of the equipment are defined; Is calculated by applying a deterministic model of production; And it is made the survey of existing equipment in the market, gathering its characteristics and services provided by the representatives or manufacturers of the brands. To demonstrate the functionality of the developed model, the present study demonstrated, through a case study, the design of a loading and transport fleet for open pit mining using production indicators, and a comparison between the use of small equipment And large in the aspect of equipment demand. The study was developed from a hypothetical mining company based on realistic data. The developed model is applicable to any type of excavation and transportation equipment, regardless of its size and production capacity. In conclusion, it is intended with this dissertation to provide a useful tool to support the decision on sizing equipment and excavation and transport fleets capable of supplying the need for a market consultation.
8

Caracterização de payloads via telemetria

Teixeira, Lucas Augusto Costa January 2016 (has links)
O preço atual do minério de ferro obrigou as empresas a reduzirem os custos operacionais na fase mina. O carregamento e transporte de materiais com utilização de escavadeiras e caminhões grande porte representam grande parcela do custo total, particularmente com pneus, diesel, manutenção e mão de obra. Metas de movimentação anual são divididas durante os meses e as condições climáticas podem influenciar na produtividade e desempenho dos equipamentos. O banco de dados da movimentação mensal está condicionado com a capacidade de cada caminhão. Cada frota possui o payload característico e este representa a capacidade de transporte, sendo o valor da massa transportada o único parâmetro extraído em cada ciclo, sem considerar o posicionamento do material sobre a caçamba dos equipamentos. Forças de cisalhamento e torção são aplicadas constantemente no chassi e pneus dos caminhões e, quando as cargas estão descentralizadas, potencializam estes eventos. O transporte de cargas descentralizadas agride os pneus diminuindo a vida útil causando danos como deslocamento da banda de rodagem e separação do flanco. Este trabalho teve como objetivo diminuir as ocorrências de cargas descentralizadas e os custos operacionais. Para incrementar o posicionamento do material sobre as caçambas, a telemetria foi a ferramenta utilizada. Análises de pressões de suspensões indicam o posicionamento das cargas e através desses valores foi criado um banco de dados. Este banco de dados pode indicar qual operador de carga precisa de reciclagem, contribuindo para a redução de cargas descentralizadas e custos, uma vez que cargas deste perfil sucateiam precocemente pneus e suspensões. O estudo foi realizado em Itabira, em uma mina de minério de ferro a céu aberto. A metodologia comprovou ser capaz diminuir as ocorrências de cargas descentralizadas assim como aumentar a vida útil de pneus. Uma possível economia foi apresentada para ano de 2014, período em que a média das horas trabalhadas de pneus ficou abaixo da meta aumentando os custos fase mina. / The actual iron ore price forces the companies to reduce costs in all production steps of the mining operation. Loading and hauling materials using shovel-truck system represents the highest mining costs, particularly tires, diesel, maintenance and workforce. Annual goals of materials movement are split by months were weather conditions can affect productivity and performance of the fleet. The data file of the monthly material movement is based on the scale of each truck. Every fleet has a payload and it represents the capacity of hauling, being the value of loading a unique input extracted in each duty cycle, without taking into account the position of the material over the truck’s dump. Shear forces and torsion are applied all time at the frames trucks and, when the truckloads are unbalanced, increases the forces over the frame and tires. Transport unbalanced truckloads into long distances attack the tires and decrease its end of life, causing damages like displacement of tread and flank separation. The objective of this study is to propose a methodology to decrease unbalanced truck loads reducing the mining costs. In this mission of incorporating a material position on the truck´s dump, the telemetry was taking into consideration. The analysis of the suspension pressures data values shows the truckloads positions and with this data was created a databank. This databank indicates that the operators need truck load training to reduce unbalanced loads and truck costs in the mining operation, since unbalanced loads leads to early tires and suspensions scrap. The case study was carried out at Itabira Iron Ore Mine Complex, Brazil. This methodology was able to reduce the number of unbalanced truck loads as well as the tires life was increased. An economic saving estimate is presented based on 2014 scrapped tires data bank, in this year the tires life cycle was underneath, burdening operational costs.
9

Programação linear na análise de viabilidade técnica e econômica de projeto multimina

Silva, Pedro Augusto Costa January 2016 (has links)
Os custos de produção de minério de ferro possuem variações de acordo com a especificidade de cada mina. Na fase mina, dois dos maiores custos de produção estão associados aos índices: distância média de transporte e a relação estéril minério. A implantação do projeto de múltiplas minas e correias transportadoras em Itabira visa diminuir os custos associados a estes dois indicadores. O método de alimentação da planta de beneficiamento oriundo de múltiplas minas foca em reduzir a relação estéril minério global do complexo e a implantação de correias transportadoras mitiga o aumento da distância média de transporte. O presente trabalho tem seu enfoque em uma proposta de lavra de múltiplas minas e de uma pilha de minério para alimentação de três diferentes usinas. Propõem-se um modelo de programação linear por metas que determinará a melhor alimentação das usinas, menor distância média de transporte e menor relação estéril minério. Este modelo de otimização foi elaborado utilizando o software LINGO com interface com EXCEL, e avalia cenários diversificados entre o transporte por caminhões fora de estrada e o transporte misto entre caminhões fora de estrada e transportadores de correia de longa distância. Os resultados apresentados mostram que o método de múltiplas minas é uma saída técnica e economicamente viável para melhor aproveitamento das jazidas do Complexo Minerador de Itabira, apresentando uma economia que varia de US$82M até US$118M dependendo do local de instalação das unidades de Britagem Semimóvel (BSMs). / Production costs of iron ore varies according to the specificity of each mine. In the mining phase, some of the largest operational costs are associated to the haulage distance and the stripping ratio. In this context, the implementation of the multiple mines project and the conveyor belts at the Itabira Complex Mines aims to optimize these two indicators. The multiple mines methodology focuses on reducing the overall stripping ratio of the complex, and the implementation of conveyor belts mitigates the increase of the haulage distance. Two mines and a stock pile are available to feed three different concentration plants. The goal is to achieve the best way to feed the plants considering the economic aspects. A linear goal programming model is proposed to determine the best iron ore mass feeding the plants from different mines, taking into account the least haulage distance and the smallest stripping ratio. This optimization model was developed using LINGO Software to interface with EXCEL and evaluate diversified scenarios. The results showed that the method of multiple mines is a technical and economically viable method for mine planning at the Itabira Complex.
10

Desenvolvimento de um modelo de dimensionamento de equipamento de escavacao e de transporte em mineração

Racia, Ismael Momade January 2016 (has links)
O motivo da dissertação “Desenvolvimento de um Modelo de Dimensionamento de Equipamentos de Escavação e de Transporte” surgiu da necessidade de apoiar no processo de decisão de dimensionamento dos principais equipamentos de mineração. Este trabalho apresenta um modelo simples e direto para dimensionar os equipamentos principais de mineração (escavadeiras e caminhões) através de uma rotina criada denominada EXCEsimulator, concebido para o cálculo da capacidade das caçambas das escavadeiras, do número dos equipamentos de escavação e de transporte, bem como os tempos de espera das unidades de transporte em carregar. Para tal, definem-se os parâmetros de produtividade e caraterísticas dos equipamentos; calcula-se aplicando um modelo determinístico de produção; e faz-se o levantamento de equipamentos existentes no mercado, reunindo as suas características e serviços prestados pelos representantes ou fabricantes das marcas. Para demostrar a funcionalidade do modelo desenvolvido, o presente trabalho demonstrou, através de um estudo de caso, o dimensionamento de uma frota de carregamento e transporte para uma mineração a céu aberto utilizando indicadores de produção, e uma comparação entre o uso de equipamentos de pequeno e grande porte no aspeto da demanda de equipamento. O estudo foi desenvolvido a partir de uma empresa de mineração hipotética baseada em dados realista. O modelo desenvolvido é aplicável a qualquer tipo de equipamento de escavação e de transporte, independente do seu porte e capacidade de produção. Como conclusão, pretende-se com esta dissertação fornecer uma ferramenta útil para o apoio à decisão de dimensionamento de equipamentos e frotas de escavação e de transporte capaz de suprir a necessidade de uma consulta de mercado. / The reason for the dissertation "Development of an Estimating Model for Excavation and Transport Equipment" arose from the need to support the decision-making process for the size of the main mining equipment. This work presents a simple and direct model for sizing the main mining equipment (excavators and trucks) through a routine created called EXCEsimulator, designed to calculate the capacity of excavator buckets, number of excavation and transport equipment, and As the waiting times of the transport units on loading. For this, the parameters of productivity and characteristics of the equipment are defined; Is calculated by applying a deterministic model of production; And it is made the survey of existing equipment in the market, gathering its characteristics and services provided by the representatives or manufacturers of the brands. To demonstrate the functionality of the developed model, the present study demonstrated, through a case study, the design of a loading and transport fleet for open pit mining using production indicators, and a comparison between the use of small equipment And large in the aspect of equipment demand. The study was developed from a hypothetical mining company based on realistic data. The developed model is applicable to any type of excavation and transportation equipment, regardless of its size and production capacity. In conclusion, it is intended with this dissertation to provide a useful tool to support the decision on sizing equipment and excavation and transport fleets capable of supplying the need for a market consultation.

Page generated in 0.0851 seconds