• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • Tagged with
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Caracterização de payloads via telemetria

Teixeira, Lucas Augusto Costa January 2016 (has links)
O preço atual do minério de ferro obrigou as empresas a reduzirem os custos operacionais na fase mina. O carregamento e transporte de materiais com utilização de escavadeiras e caminhões grande porte representam grande parcela do custo total, particularmente com pneus, diesel, manutenção e mão de obra. Metas de movimentação anual são divididas durante os meses e as condições climáticas podem influenciar na produtividade e desempenho dos equipamentos. O banco de dados da movimentação mensal está condicionado com a capacidade de cada caminhão. Cada frota possui o payload característico e este representa a capacidade de transporte, sendo o valor da massa transportada o único parâmetro extraído em cada ciclo, sem considerar o posicionamento do material sobre a caçamba dos equipamentos. Forças de cisalhamento e torção são aplicadas constantemente no chassi e pneus dos caminhões e, quando as cargas estão descentralizadas, potencializam estes eventos. O transporte de cargas descentralizadas agride os pneus diminuindo a vida útil causando danos como deslocamento da banda de rodagem e separação do flanco. Este trabalho teve como objetivo diminuir as ocorrências de cargas descentralizadas e os custos operacionais. Para incrementar o posicionamento do material sobre as caçambas, a telemetria foi a ferramenta utilizada. Análises de pressões de suspensões indicam o posicionamento das cargas e através desses valores foi criado um banco de dados. Este banco de dados pode indicar qual operador de carga precisa de reciclagem, contribuindo para a redução de cargas descentralizadas e custos, uma vez que cargas deste perfil sucateiam precocemente pneus e suspensões. O estudo foi realizado em Itabira, em uma mina de minério de ferro a céu aberto. A metodologia comprovou ser capaz diminuir as ocorrências de cargas descentralizadas assim como aumentar a vida útil de pneus. Uma possível economia foi apresentada para ano de 2014, período em que a média das horas trabalhadas de pneus ficou abaixo da meta aumentando os custos fase mina. / The actual iron ore price forces the companies to reduce costs in all production steps of the mining operation. Loading and hauling materials using shovel-truck system represents the highest mining costs, particularly tires, diesel, maintenance and workforce. Annual goals of materials movement are split by months were weather conditions can affect productivity and performance of the fleet. The data file of the monthly material movement is based on the scale of each truck. Every fleet has a payload and it represents the capacity of hauling, being the value of loading a unique input extracted in each duty cycle, without taking into account the position of the material over the truck’s dump. Shear forces and torsion are applied all time at the frames trucks and, when the truckloads are unbalanced, increases the forces over the frame and tires. Transport unbalanced truckloads into long distances attack the tires and decrease its end of life, causing damages like displacement of tread and flank separation. The objective of this study is to propose a methodology to decrease unbalanced truck loads reducing the mining costs. In this mission of incorporating a material position on the truck´s dump, the telemetry was taking into consideration. The analysis of the suspension pressures data values shows the truckloads positions and with this data was created a databank. This databank indicates that the operators need truck load training to reduce unbalanced loads and truck costs in the mining operation, since unbalanced loads leads to early tires and suspensions scrap. The case study was carried out at Itabira Iron Ore Mine Complex, Brazil. This methodology was able to reduce the number of unbalanced truck loads as well as the tires life was increased. An economic saving estimate is presented based on 2014 scrapped tires data bank, in this year the tires life cycle was underneath, burdening operational costs.
2

Caracterização de payloads via telemetria

Teixeira, Lucas Augusto Costa January 2016 (has links)
O preço atual do minério de ferro obrigou as empresas a reduzirem os custos operacionais na fase mina. O carregamento e transporte de materiais com utilização de escavadeiras e caminhões grande porte representam grande parcela do custo total, particularmente com pneus, diesel, manutenção e mão de obra. Metas de movimentação anual são divididas durante os meses e as condições climáticas podem influenciar na produtividade e desempenho dos equipamentos. O banco de dados da movimentação mensal está condicionado com a capacidade de cada caminhão. Cada frota possui o payload característico e este representa a capacidade de transporte, sendo o valor da massa transportada o único parâmetro extraído em cada ciclo, sem considerar o posicionamento do material sobre a caçamba dos equipamentos. Forças de cisalhamento e torção são aplicadas constantemente no chassi e pneus dos caminhões e, quando as cargas estão descentralizadas, potencializam estes eventos. O transporte de cargas descentralizadas agride os pneus diminuindo a vida útil causando danos como deslocamento da banda de rodagem e separação do flanco. Este trabalho teve como objetivo diminuir as ocorrências de cargas descentralizadas e os custos operacionais. Para incrementar o posicionamento do material sobre as caçambas, a telemetria foi a ferramenta utilizada. Análises de pressões de suspensões indicam o posicionamento das cargas e através desses valores foi criado um banco de dados. Este banco de dados pode indicar qual operador de carga precisa de reciclagem, contribuindo para a redução de cargas descentralizadas e custos, uma vez que cargas deste perfil sucateiam precocemente pneus e suspensões. O estudo foi realizado em Itabira, em uma mina de minério de ferro a céu aberto. A metodologia comprovou ser capaz diminuir as ocorrências de cargas descentralizadas assim como aumentar a vida útil de pneus. Uma possível economia foi apresentada para ano de 2014, período em que a média das horas trabalhadas de pneus ficou abaixo da meta aumentando os custos fase mina. / The actual iron ore price forces the companies to reduce costs in all production steps of the mining operation. Loading and hauling materials using shovel-truck system represents the highest mining costs, particularly tires, diesel, maintenance and workforce. Annual goals of materials movement are split by months were weather conditions can affect productivity and performance of the fleet. The data file of the monthly material movement is based on the scale of each truck. Every fleet has a payload and it represents the capacity of hauling, being the value of loading a unique input extracted in each duty cycle, without taking into account the position of the material over the truck’s dump. Shear forces and torsion are applied all time at the frames trucks and, when the truckloads are unbalanced, increases the forces over the frame and tires. Transport unbalanced truckloads into long distances attack the tires and decrease its end of life, causing damages like displacement of tread and flank separation. The objective of this study is to propose a methodology to decrease unbalanced truck loads reducing the mining costs. In this mission of incorporating a material position on the truck´s dump, the telemetry was taking into consideration. The analysis of the suspension pressures data values shows the truckloads positions and with this data was created a databank. This databank indicates that the operators need truck load training to reduce unbalanced loads and truck costs in the mining operation, since unbalanced loads leads to early tires and suspensions scrap. The case study was carried out at Itabira Iron Ore Mine Complex, Brazil. This methodology was able to reduce the number of unbalanced truck loads as well as the tires life was increased. An economic saving estimate is presented based on 2014 scrapped tires data bank, in this year the tires life cycle was underneath, burdening operational costs.
3

Caracterização de payloads via telemetria

Teixeira, Lucas Augusto Costa January 2016 (has links)
O preço atual do minério de ferro obrigou as empresas a reduzirem os custos operacionais na fase mina. O carregamento e transporte de materiais com utilização de escavadeiras e caminhões grande porte representam grande parcela do custo total, particularmente com pneus, diesel, manutenção e mão de obra. Metas de movimentação anual são divididas durante os meses e as condições climáticas podem influenciar na produtividade e desempenho dos equipamentos. O banco de dados da movimentação mensal está condicionado com a capacidade de cada caminhão. Cada frota possui o payload característico e este representa a capacidade de transporte, sendo o valor da massa transportada o único parâmetro extraído em cada ciclo, sem considerar o posicionamento do material sobre a caçamba dos equipamentos. Forças de cisalhamento e torção são aplicadas constantemente no chassi e pneus dos caminhões e, quando as cargas estão descentralizadas, potencializam estes eventos. O transporte de cargas descentralizadas agride os pneus diminuindo a vida útil causando danos como deslocamento da banda de rodagem e separação do flanco. Este trabalho teve como objetivo diminuir as ocorrências de cargas descentralizadas e os custos operacionais. Para incrementar o posicionamento do material sobre as caçambas, a telemetria foi a ferramenta utilizada. Análises de pressões de suspensões indicam o posicionamento das cargas e através desses valores foi criado um banco de dados. Este banco de dados pode indicar qual operador de carga precisa de reciclagem, contribuindo para a redução de cargas descentralizadas e custos, uma vez que cargas deste perfil sucateiam precocemente pneus e suspensões. O estudo foi realizado em Itabira, em uma mina de minério de ferro a céu aberto. A metodologia comprovou ser capaz diminuir as ocorrências de cargas descentralizadas assim como aumentar a vida útil de pneus. Uma possível economia foi apresentada para ano de 2014, período em que a média das horas trabalhadas de pneus ficou abaixo da meta aumentando os custos fase mina. / The actual iron ore price forces the companies to reduce costs in all production steps of the mining operation. Loading and hauling materials using shovel-truck system represents the highest mining costs, particularly tires, diesel, maintenance and workforce. Annual goals of materials movement are split by months were weather conditions can affect productivity and performance of the fleet. The data file of the monthly material movement is based on the scale of each truck. Every fleet has a payload and it represents the capacity of hauling, being the value of loading a unique input extracted in each duty cycle, without taking into account the position of the material over the truck’s dump. Shear forces and torsion are applied all time at the frames trucks and, when the truckloads are unbalanced, increases the forces over the frame and tires. Transport unbalanced truckloads into long distances attack the tires and decrease its end of life, causing damages like displacement of tread and flank separation. The objective of this study is to propose a methodology to decrease unbalanced truck loads reducing the mining costs. In this mission of incorporating a material position on the truck´s dump, the telemetry was taking into consideration. The analysis of the suspension pressures data values shows the truckloads positions and with this data was created a databank. This databank indicates that the operators need truck load training to reduce unbalanced loads and truck costs in the mining operation, since unbalanced loads leads to early tires and suspensions scrap. The case study was carried out at Itabira Iron Ore Mine Complex, Brazil. This methodology was able to reduce the number of unbalanced truck loads as well as the tires life was increased. An economic saving estimate is presented based on 2014 scrapped tires data bank, in this year the tires life cycle was underneath, burdening operational costs.

Page generated in 0.0482 seconds