• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

The Application Of "crashing" A Project Network To Solve The Time/cost Tradeoff In Recapitalization Of The Uh-60a Helicopter

Fortier, Gregory 01 January 2006 (has links)
Since the beginning of project management, people have been asked to perform "more with less" in expeditious time while attempting to balance the inevitable challenge of the time/cost tradeoff. This is especially true within the Department of Defense today in prosecuting the Global War on Terrorism both in Afghanistan and Iraq. An unprecedented and consistent level of Operational Tempo has generated heavy demands on current equipment and has subsequently forced the need to recapitalize several legacy systems until suitable replacements can be implemented. This paper targets the UH-60A:A Recapitalization Program based at the Corpus Christi Army Depot in Corpus Christi, Texas. More specifically, we examine one of the nine existing project sub-networks within the UH-60A:A program, the structural/electrical upgrade phase. In crashing (i.e. adding manpower or labor hours) the network, we determine the minimal cost required to reduce the total completion time of the 68 activities within the network before a target completion time. A linear programming model is formulated and then solved for alternative scenarios. The first scenario is prescribed by the program manager and consists of simply hiring additional contractors to augment the existing personnel. The second and third scenarios consist of examining the effects of overtime, both in an aggressive situation (with limited longevity) and a more moderate situation (displaying greater sustainability over time). The initial linear programming model (Scenario 1) is crashed using estimates given from the program scheduler. The overtime models are crashed using reduced-time crash estimates. For Scenarios 2 and 3, the crashable times themselves are reduced by 50% and 75%, respectively. Initial results indicate that a completion time of 79.5 days is possible without crashing any activities in the network. The five-year historical average completion time is 156 days for this network. We continue to crash the network in each of the three scenarios and determine that the absolute shortest feasible completion times, 73 days for Scenario 1, 76 days for Scenario 2, and 77.5 days for Scenario 3. We further examine the models to observe similarities and differences in which activities get targeted for crashing and how that reduction affects the critical path of the network. These results suggests an in-depth study of using linear programming and applying it to project networks to grant project managers more critical insight that may help them better achieve their respective objectives. This work may also be useful as the groundwork for further refinement and application for maintenance managers conducting day-to-day unit level maintenance operations.
2

Physics based prediction of aeromechanical loads for the UH-60A rotor

Marpu, Ritu Priyanka 12 April 2013 (has links)
Helicopters in forward flight experience complex aerodynamic phenomena to various degrees. In low speed level flight, the vortex wake remains close to the rotor disk and interacts with the rotor blades to give rise to blade vortex interaction phenomena. In high speed flight, compressibility effects dominate leading to the formation of shocks. If the required thrust is high, the combination of high collective pitch and cyclic pitch variations give rise to three-dimensional dynamic stall phenomena. Maneuvers further exacerbate the unsteady airloads and affect rotor and hub design. The strength and durability of the rotor blades and hub components is dependent on accurate estimates of peak-to-peak structural loads. Accurate knowledge of control loads is important for sizing the expensive swash-plate components and assuring long fatigue life. Over the last two decades, computational tools have been developed for modeling rotorcraft aeromechanics. In spite of this progress, loads prediction in unsteady maneuvers which is critical for peak design loads continues to be a challenging task. The primary goal of this research effort is to investigate important physical phenomena that cause severe loads on the rotor in steady flight and in extreme maneuvers. The present work utilizes a hybrid Navier-Stokes/free-wake CFD methodology coupled to a finite element based multi-body dynamics analysis to systematically study steady level and maneuvering flight conditions. Computational results are presented for the UH-60A rotor for a parametric sweep of speed and thrust conditions and correlated with test data at the NFAC Wind Tunnel. Good agreement with test data has been achieved using the current methodology for trim settings and integrated hub loads, torque, and power. Two severe diving turn maneuvers for the UH-60A recorded in the NASA/Army Airloads Flight Tests Database have also been investigated. These maneuvers are characterized by high load factors and high speed flight. The helicopter experiences significant vibration during these maneuvers. Mean and peak-to-peak structural loads and extensive stall phenomena including an advancing side stall phenomena have been captured by the present analyses.
3

Improved Helicopter Rotor Performance Prediction through Loose and Tight CFD/CSD Coupling

Ickes, Jacob January 2014 (has links)
No description available.

Page generated in 0.0271 seconds