Asymptotic Optimization of Risk MeasuresQuintanilla, Maria Teresa 01 August 2008 (has links)
Value-at-Risk (VaR ) is an industrial
standard for monitoring market risk in an
investment portfolio. It measures potential
osses within a given confidence level. VaR
was first used by major financial
institutions in the early 1990’s, and widely
developed after the release of J.P. Morgan’s
Riskmetrics Technical Document in 1996. The
efficient calculation, implementation,
interpretation and optimization of VaR are a
challenge in the practice of risk management
when the number of market factors in the
portfolio is high.
In this thesis, we are concerned with the
quadratic analytical estimation of VaR and
we present a methodology for an approximation
to VaR that is based on the principal
components of a sensitivity-adjusted
covariance matrix. The result is an explicit
expression in terms of portfolio deltas,
gammas, and the mean and covariance matrix.
It can be viewed as a non-linear extension
of the linear model given by the
delta-normal-VaR of RiskMetrics, a standard
calculation for the risk in the financial
sector. We obtain an asymptotic expansion
for VaR in the limit when the confidence
level approaches 1 and precise estimates of
the reminder. We then optimize the
approximated VaR with respect to the
gradient or delta of the portfolio, a
quantity which can be changed by trading the
underlying assets (stocks), without entering
into any derivative transactions. This
analysis provides an optimal trading
strategy of the portfolio that minimizes the
risk.
|
22 |
Applying Value-at-Risk to Financial Risk Evaluation in BOT ProjectsSung, Chao-Hsien 28 May 2010 (has links)
There is a growing trend to use public-private partnerships (PPP) for infrastructure project delivery due to lack of budget and inefficiency of public sector. The most popular PPP option is a concession-based type such as build-operate-transfer (BOT). However, construction delay, costs overrun, and disastrous financial performance in the early operation phase are not rarely seen in large BOT projects. The case of Taiwan High Speed Rail (THSR) is the evidence. The problem lies in over-optimism in financial feasibility analysis and under-estimation in risk exposure evaluation.
Based on information of Case Project - Kaohsiung Intercontinental Terminal (KIT), which started its Phase One Plan in 2007 at a cost of about NT$42.89 billions in land procurement, peripheral public infrastructure and construction and facilities of the terminal, I will apply traditional capital investment methodology to evaluate its financial feasibility. This is done by calculating key financial indexes from Total Investment Point of View and Equity Point of View and determine whether this project is acceptable or not by conventional criteria from three main participants¡¦ position, including government agency, financial institutions, and private investors. However, we can not realize risk exposure of Case Project from traditional methods. Therefore, ideas of Value-at-Risk (VAR) that commonly used in evaluating risk exposure of financial assets are brought in.
The VAR concepts are used in four financial indexes, including self-liquidation ratio (SLR), net present value (NPV), debt coverage ratio (DCR) and times interest earned (TIE), which are regarded as critical in decision by government agency, private investors, and financial institutions. This is done by applying Monte Carlo Simulation, which involves 1,000 iterations of sampling based on parameter settings of risk factors and consideration of correlations in risk factors. Volatility of key risk factor is analyzed to further realize comprehensively risk exposure in terms of VARs of financial indexes.
Evidences show that, while parameter settings of risk factors are critical to simulations results, consideration of correlations of risk factors will also diverge results from that of ignoring. In addition, sensitivity analysis in terms of volatility in key risk factors presents full-scale financial risk exposure, which is helpful in reaching final decision.
Of all three participants in Case Project, while private investors face greatest risk exposure due to high financial leverage employed, financial institutions confront relatively low risk in terms of loan repayment. From government agency¡¦s view, probability of fully self-liquidated with no subsidy in Case Project is 90%.
|
23 |
The Study of Nonlinear VaR ModelsHong, Dai-Yuh 06 July 2000 (has links)
None
|
24 |
The Study on Influences of Value at Risk with Venture Capital ContractsTai, Chih-Hao 18 June 2003 (has links)
none
|
25 |
Einsatz des Conditional Value-at-Risk in der Entscheidung unter Risiko : Anwendung in der Portfolioabsicherung /Koller, Jérôme. Unknown Date (has links)
St. Gallen, University, Diss., 2005.
|
26 |
Integration von Markt- und KreditrisikenMontandon, Pascal. January 2005 (has links) (PDF)
Bachelor-Arbeit Univ. St. Gallen, 2005.
|
27 |
Asset and Liability Management Methodenvergleich /Eglin, Oliver. January 2006 (has links) (PDF)
Bachelor-Arbeit Univ. St. Gallen, 2006.
|
28 |
Einfluss der Filtrierung auf die Asset Allocation für kurzfristige PlanungshorizonteRafi, Sara. January 2007 (has links) (PDF)
Master-Arbeit Univ. St. Gallen, 2007.
|
29 |
Value-at-Risk - estimated with the parametric methodDeichmann, Philip. January 2008 (has links) (PDF)
Master-Arbeit Univ. St. Gallen, 2008.
|
30 |
Value-at-Risk models in developed and emerging stock marketsPoulmentis, Andreas. January 2008 (has links) (PDF)
Master-Arbeit Univ. St. Gallen, 2008.
|