• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Estimação da curva volume versus duração utilizando a distribuição de probabilidade generalizada de valores extremos, para obtenção do volume de espera em reservatórios / Estimate of the curve valume versus duração using the distribution of widespread probability of extreme values - gev. for obtaining of the volume of wait in reservoirs

Preti, Agnaldo Passolongo 12 December 2005 (has links)
Made available in DSpace on 2017-07-10T19:24:49Z (GMT). No. of bitstreams: 1 Agnaldo Passolongo Preti.pdf: 3515934 bytes, checksum: 02a0cd639e522e2412af47a054476fc1 (MD5) Previous issue date: 2005-12-12 / There is a clear conflict between the reservoir utilization for control and use multiple of the water mainly for electric power generation. In order to control the floods, it is necessary to predict the availability of empty reservoir volumes, capable of absorbing some inflow parcels, to avoid or reduce the damage caused to the downstream area. From an energy standpoint, it is desirable to allocate the smallest possible protection volume, while from a flood control standpoint, it is desirable to have a reliable estimate of the possibility of the reservoir failing to control a flood when a given protection volume is allocated. The objective of this work was to obtain the Curve Volume x Duration using maximum inflow with different duration fitted by GEV distribution and LH moments used to estimate the protection volume in reservoir. It was used maximum affluent volumes of the Paraná River recorded in Guaira gauge. All the fit of the maximum affluent volumes was agree by the approximate goodness-of-fit test of fitted generalized extreme value distribution using LH moments by WANG (1998) with 5% significance level. The Curve Volume x Duration was build appropriately for ten different affluent volumes durations. / Existe conflito na utilização de reservatórios para o controle de cheias e usos múltiplos da água, principalmente para a geração de energia elétrica. Para controlar cheias é necessário um volume vazio no reservatório capaz de absorver uma eventual cheia sem causar danos nas áreas à jusante. Por outro lado, para gerar energia é desejável alocar o menor volume de proteção possível, ao passo que para controlar cheias é desejável ter uma estimativa confiável da possibilidade do reservatório falhar quando um dado volume de proteção é alocado. O objetivo deste trabalho foi construir a curva volume x duração, empregada para estimar volume de espera, por meio do ajuste das séries de volumes máximos afluentes, utilizando a distribuição GEV e momentos LH. Foram trabalhados volumes afluentes observados em várias estações de rio do Paraná. Todos os ajustes dos volumes máximos afluentes foram aceitos através dos testes de qualidade de ajuste propostos por WANG (1998) e Kolmogorov-Smirnov com 5 % de significância e critério de Kite. As curvas volume x duração foram adequadamente construídas usando valores de volumes máximos afluentes para diferentes durações e estações.
2

Estimação da curva volume versus duração utilizando a distribuição de probabilidade generalizada de valores extremos, para obtenção do volume de espera em reservatórios / Estimate of the curve valume versus duração using the distribution of widespread probability of extreme values - gev. for obtaining of the volume of wait in reservoirs

Preti, Agnaldo Passolongo 12 December 2005 (has links)
Made available in DSpace on 2017-05-12T14:48:13Z (GMT). No. of bitstreams: 1 Agnaldo Passolongo Preti.pdf: 3515934 bytes, checksum: 02a0cd639e522e2412af47a054476fc1 (MD5) Previous issue date: 2005-12-12 / There is a clear conflict between the reservoir utilization for control and use multiple of the water mainly for electric power generation. In order to control the floods, it is necessary to predict the availability of empty reservoir volumes, capable of absorbing some inflow parcels, to avoid or reduce the damage caused to the downstream area. From an energy standpoint, it is desirable to allocate the smallest possible protection volume, while from a flood control standpoint, it is desirable to have a reliable estimate of the possibility of the reservoir failing to control a flood when a given protection volume is allocated. The objective of this work was to obtain the Curve Volume x Duration using maximum inflow with different duration fitted by GEV distribution and LH moments used to estimate the protection volume in reservoir. It was used maximum affluent volumes of the Paraná River recorded in Guaira gauge. All the fit of the maximum affluent volumes was agree by the approximate goodness-of-fit test of fitted generalized extreme value distribution using LH moments by WANG (1998) with 5% significance level. The Curve Volume x Duration was build appropriately for ten different affluent volumes durations. / Existe conflito na utilização de reservatórios para o controle de cheias e usos múltiplos da água, principalmente para a geração de energia elétrica. Para controlar cheias é necessário um volume vazio no reservatório capaz de absorver uma eventual cheia sem causar danos nas áreas à jusante. Por outro lado, para gerar energia é desejável alocar o menor volume de proteção possível, ao passo que para controlar cheias é desejável ter uma estimativa confiável da possibilidade do reservatório falhar quando um dado volume de proteção é alocado. O objetivo deste trabalho foi construir a curva volume x duração, empregada para estimar volume de espera, por meio do ajuste das séries de volumes máximos afluentes, utilizando a distribuição GEV e momentos LH. Foram trabalhados volumes afluentes observados em várias estações de rio do Paraná. Todos os ajustes dos volumes máximos afluentes foram aceitos através dos testes de qualidade de ajuste propostos por WANG (1998) e Kolmogorov-Smirnov com 5 % de significância e critério de Kite. As curvas volume x duração foram adequadamente construídas usando valores de volumes máximos afluentes para diferentes durações e estações.

Page generated in 0.0489 seconds