• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 473
  • 103
  • 58
  • 33
  • 18
  • 17
  • 13
  • 13
  • 12
  • 8
  • 8
  • 7
  • 7
  • 7
  • 7
  • Tagged with
  • 901
  • 901
  • 349
  • 195
  • 144
  • 127
  • 93
  • 92
  • 90
  • 88
  • 82
  • 81
  • 77
  • 66
  • 65
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
361

Wind Farm Diversification and Its Impact on Power System Reliability

Degeilh, Yannick 2009 August 1900 (has links)
As wind exploitation gains prominence in the power industry, the extensive use of this intermittent source of power may heavily rely on our ability to select the best combination of wind farming sites that yields maximal reliability of power systems at minimal cost. This research proposes a general method to minimize the wind park global power output variance by optimally distributing a predetermined number of wind turbines over a preselected number of potential wind farming sites for which the wind patterns are statistically known. The objective is to demonstrate the benefits of diversification for the reliability of wind-sustained systems through the search for steadier overall power outputs. Three years of wind data from the recent NREL/3TIER study in the western US provides the statistics for evaluating each site for their mean power output, variance and correlation with each other so that the best allocations can be determined. Some traditional reliability indices such as the LOLP are computed by using sequential Monte Carlo simulations to emulate the behavior of a power system uniquely composed of wind turbines and a load modeled from the 1996 IEEE RTS. It is shown that configurations featuring minimal global power output variances generally prove the most reliable for moderate load cases, provided the sites are not significantly correlated with the modeled load. Under these conditions, the choice of uncorrelated/negatively correlated sites is favored. The correlations between the optimized global wind power outputs and the modeled load are studied as well.
362

The Operation and Control of Micro-grid Systems with Dispersed Generation

Lee, Yih-Der 05 August 2009 (has links)
This dissertation is to design the operation strategy and protective scheme of micro-grid systems with dispersed generation (DG). The industrial power system with cogeneration units and the distribution feeder with wind power generators were selected as the study micro-grids for computer simulation. The mathematical models of cogeneration units and wind generators were included in the computer simulation by considering the operation control modes of DGs. The micro-grid systems and the nearby utility networks were constructed to solve the power flows of the micro-grids with various operation scenarios of power generation and load demand. For the severe external fault contingencies, the micro-grids have to be isolated from the utility power system in time to prevent the tripping of critical loads and DGs. By considering the fault ride through capability of cogenerators and voltage tolerance curves of critical loads, the critical tripping time (CTT) of tie circuit breaker of the micro-grids was determined according to the transient stability analysis. To maintain the stable operation of the micro-grids after tie line tripping, the load shedding scheme was designed by applying the under frequency and under voltage relays to disconnect the proper amount of non-critical loads according to the governor responses of cogeneration units. For the micro-grid of distribution feeder with wind power generator, the STATCOM was used to provide adaptive reactive power compensation for the mitigation of voltage fluctuation due to the variation of wind speed and feeder loading. The STATCOM can also be applied for the support of terminal voltage of wind generator (WG) to enhance the transient response of the micro-grid. The CTT of tie circuit breaker was determined by considering the low voltage ride through (LVRT) capability and the critical fault cleaning time of WG. To achieve more effective islanding operation of the micro-grids, the artificial neural network (ANN) was applied to determine the proper timing for tie line tripping and the proper amount of load shedding by using the wind speed, feeder loading and the voltage of micro-grid system as the input of ANN. To verify the effectiveness of the proposed tie line tripping and load shedding scheme, different fault contingencies of the external utility network have been simulated by using the computer program for the transient stability analysis. It is found that the critical and voltage sensitive loads of the micro-grid can be maintained when the tie circuit breaker is activated to isolate the external fault in time and followed by the execution of load shedding scheme.
363

Potential negative effects of wind turbines on the ear

Duvvury, Rolan Shawn 11 July 2011 (has links)
This thesis presents investigations on the potential negative effects of wind turbine noise on the human ear from a sound point source (i.e. wind farm). In Chapter 2, the tectorial membrane, which is a crucial gelatinous structural matrix located within the cochlea of the inner ear, is considered to have a similar constitutive stress-strain relationship to that of an elastomer (rubber) in tension. The tectorial membrane appears to stretch when subjected to constant heavy sound stimulation. The tectorial membrane is modeled as a simply-supported beam with an external load Pext applied at midspan. A virtual work approach is used to balance the external work at midspan Pextδz of the tectorial membrane with the internal strain energy from its hysteresis loops. These hysteresis loops quantify the amount of damage that the tectorial membrane undergoes due to an applied external loading. Normalized damage tables are presented at the end of the chapter to suggest safe distances away from the wind turbines to limit damage to the tectorial membrane. Chapter 3 considers a hypothetical autonomous village constructed in South Pretoria, South Africa. This village accommodates approximately 2000 people (~500 families) and receives electricity for hot water from a nearby 2.5 MW wind farm. The design process for the village is discussed from an architectural and design standpoint. The wind farm specifications, specifically the number of 2.5 MW wind turbines needed to provide electricity for hot water, are established. Results from Chapter 2 are used to suggest minimum safe distances between the wind farm and the autonomous village in the context of limiting damage to the tectorial membrane.
364

Gone with the Wind : The economic impact of disruptions A study of service and maintenance in the Swedish wind power market

Duncker, Nadja, Klötzer, Anneke, Larsson, Kristofer January 2010 (has links)
<p>The purpose of this thesis is to explore disruptions Swedish wind turbines onshore are exposed to, and to estimate their economic impacts on the operators. We want to investigate whether there is a need for a more developed service and maintenance market within the Swedish wind power market.</p><p>This study focuses on wind power, a renewable energy source in an emerging market, which experiences exponential growth. Sweden is a minor actor in the wind power market with a production of around 2 TWh yearly. The government aims at a total production of 10TWh in 2015 and 20TWh in 2020, which equals an annual growth of 24%. However, we hypothesize that the Swedish wind power market is negatively affected by a service and maintenance market which is underdeveloped due to a lack of competition. This results in lengthy repair times and disproportionate costs for wind power operators.</p><p>The study was carried out by conducting semi-structured qualitative interviews and by sending out a survey to approximately 300 wind power operators. Six interviewees were wind power operators and one interviewee was a representative from an independent service supplier. We have also analysed the current cost situation of operators with theories about maintenance costs and we have also carried out an industry analysis on the service and maintenance market, which was based on Porter’s structural industry analysis.</p><p>After conducting a structural analysis of the service and maintenance market, we can conclude a lack of competition today as there is a dominance of the wind turbine manufacturers as the service supplier. Furthermore we can see that this lack of competition has negative effects on the efficiency of the service and maintenance provided. The results also stress a need for a more developed service and maintenance market. We have found that the profitability for the Swedish wind power operators is challenged if the service and maintenance market is not keeping pace and meeting the demands of the rapidly growing Swedish wind power market as a whole.</p>
365

Hydrogen infrastructure: resource evaluation and capacity modeling

Martin, Kevin Braun, January 2009 (has links) (PDF)
Thesis (Ph. D.)--Missouri University of Science and Technology, 2009. / Vita. The entire thesis text is included in file. Title from title screen of thesis/dissertation PDF file (viewed December 15, 2009) Includes bibliographical references (p. 72-80).
366

High Flying, Electrifying : Assessment and Extension of a Kite Model for Power Production

Lindholm, Karin January 2015 (has links)
This thesis has its starting point in an existing computer model of an electricity generating kite, from Heidelberg University. The modelled kite has an area of 500 m2 and is tethered to a generator at sea. A control unit steers the kite in an optimised trajectory. The design and trajectory that maximise mean power output per loop had been found using the optimisation software MUSCOD-II. Firstly, the model is investigated in order to find possible adjustments to make it closer to reality. Then a method to take the economic aspect into account in the optimisation has been developed. The most important findings in the model survey concerned wind speed. The original model overrated the wind speed at high altitudes and it used a mean wind speed instead of including yearly variations. Adjustments are made and a new objective function aiming at maximising the yearly average power output per invested Euro is used. Furthermore, the revised model has a preset wind speed range within which the kite can operate, and a maximum power output of the generator (the nominal power) which is found through optimisation with respect of cost. Cable strength and other production limitations are included as well. Using cost estimations for relevant parts, the revised optimisation model results in a system with a tethering cable about half the original length, and a steadier power output over the loop. The yearly production sums up to 16.8 GWh, as compared to the original model which would have given 42.9 GWh yearly.
367

Competitive renewable energy zones in Texas : suggestions for the case of Turkey

Ogunlu, Bilal 20 July 2012 (has links)
As an energy-importing developing country, Turkey depends heavily on imported petroleum and natural gas. The increase in the global petroleum price has affected the Turkish economy adversely in the last decade. Renewable energy is an important alternative in reducing Turkey’s energy dependency. Turkey’s strategies are improving domestic production and diversifying energy sources for the security of supply. New investments, especially in renewables, have been chosen to achieve these objectives. As a model for Turkey, Texas is the leader in non-hydroelectric renewable energy production in the U.S. and has one of the world’s most competitive electricity markets. However, wind generation creates unique challenges for the Electric Reliability Council of Texas (ERCOT), the transmission system operator of Texas. The market environment has forced the Public Utility Commission of Texas (PUCT) to develop unique deregulated energy markets. In 2005, the Texas Legislature passed Senate Bill 20, in part to break the deadlock between transmission and wind generation development. This legislation instructed the PUCT to establish Competitive Renewable Energy Zones (CREZs) throughout the State, and to designate new transmission projects to serve these zones. In this context, first of all, the electricity market development in Turkey is introduced in terms of renewable energy, especially wind power. Next, considering wind power, the progress in the Texas electricity market is investigated. Subsequently, we examine the development of CREZs in Texas from a regulatory perspective and discuss Texas’ policy initiatives, including the designation of CREZs. Finally, we review the impact of wind power on the primary electricity market of Texas and evaluate market conditions and barriers to renewable energy use in Turkey in order to extract suggestions. This experience may be particularly instructive to Turkey, which has a similar market structure on the supply and transmission sides. This study suggests ways that Turkey might handle renewable applications in combination with existing transmission constraints. / text
368

Development and performance investigation of a novel solar chimney power generation system

Beneke, Louis January 2015 (has links)
D. Tech. Mechanical Engineering, Mechatronics and Industrial Design / South Africa has limited reserve electricity resources and many parts of the country have limited access to electricity. Electricity production capacity is at maximum and almost each Giga watt is accounted for. Predictions suggest South Africa would have a serious electricity allocation problem in the very near future and current rolling blackout in many of our cities can attest to the looming problem. The energy crisis in South Africa has highlighted the need to increase electricity generation capacity and to search for alternative energy sources. Solar chimney plants could form part of the solution in the near future in South Africa to create additional power. This study aimed to develop a wind generation system in areas where wind is absent. A solar chimney power plant is expected to provide remote areas in South Africa with electric power, or to complement the current electricity grid. Solar energy and the psychometric state of the air are important to encourage the full development of a solar chimney power plant for the thermal and electrical production of energy for various uses. Research within the South African context and particularly on increasing the effectiveness of the solar chimney power plant technology is lacking; as such this study proposes the development of a solar chimney plant and associated technology to ensure the effectiveness of this plant.
369

Analysis of wind energy resource and impact of its integration into power systems

Ayodele, Temitope Raphael. January 2012 (has links)
D. Tech. Electrical Engineering. / Aims to investigate wind resources of a given site and develop a mathematical model that is suited for the selection of an appropriate wind turbine for the site. Develop a mathematical model for a wind energy conversion system (WECS) and its use in studying the behaviour of wind generators in response to the electrical network disturbance. The impact of wind power on the transient stability of a power system and the integration impact of intermittent wind power on the small signal stability of a power system.
370

Optimization of reactive power flow in a wind farm-connected electric power system

Numbi, Bubele Papy. January 2012 (has links)
M. Tech. Electrical Engineering. / One of the main issues in the integration of large wind power generation into the electric power networks is the voltage drop at the point of common connection (PCC) and the increase in power losses as well. This work deals with the optimization of the reactive power control in a power system with integration of a wind farm with the aim of minimizing the total active power losses and improving the load voltage profiles

Page generated in 0.1028 seconds