• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 667
  • 114
  • 55
  • 24
  • 18
  • 13
  • 12
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • 4
  • Tagged with
  • 1110
  • 1110
  • 412
  • 202
  • 166
  • 142
  • 120
  • 111
  • 106
  • 96
  • 94
  • 88
  • 88
  • 79
  • 75
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
141

Hybrid governance in the global south: a case study of collusion within the South African construction industry

Kasipo, Mafaro January 2020 (has links)
What is the nature of hybrid governance in the Global South? In the African context, a statecentric conceptualisation of governance fails to capture the nuances and realities of governance where non-state actors often fulfil duties that are traditionally the responsibility of the Weberian state. It is against this background that this dissertation seeks to contribute to hybridity literature by exploring the relationships between the state and the construction industry through a case study of collusion in the South African construction industry to build the 2010 FIFA World Cup stadiums. The research goes beyond arguing for a plurality of governance actors and draws on the concept of hybridity to highlight the contestations that characterise the relationship between the different governance actors. The original contribution to hybridity literature made by this research lies in examining how the state and the construction industry enact authority in a setting of hybrid governance. To analyse the process of hybridisation I draw on the concepts of corruption, authority and governmentality as lenses through which to analyse the rationalities, strategies and practices used in the enactment of authority. The research findings reveal that the process of hybridisation as the state and construction industry articulate authority is characterised by contradictions, blurring and boundary-making. The findings suggest that the manifestations of these characteristics during hybridisation is context specific and should be empirically determined.
142

Quality management in the public building construction process

Rwelamila, Pantaleo Mutajwaa Daniel 02 April 2020 (has links)
The poor quality of public buildings in the Botswana construction industry has been surrounded by controversy and strongly held opinions. The work reported here attempts to indicate some salient issues affecting the quality management system, with particular reference to the construction phase. Three propositions are addressed by the work. First that quality problems related to public building processes in Botswana are primarily due to an inappropriate project organizational structure. Secondly, that the traditional building procurement system provides a poor quality management system. The third proposition is that the traditional building procurement system does not facilitate derived quality levels as defined by the contract drawings and specifications. Five objectives of this study are identified and various issues which are fundamental to the research are reviewed. The first is the way in which the Botswana public building sector is organized, focussing on the building construction process. The second is the review of quality management theories both in the manufacturing and construction industries. The third is the relationship between the project management structure and project quality management, and the quality of building. The fourth is the proposal of a conceptual framework of an appropriate quality management system. Finally, recommendations about how to deal with organization of public building projects in order to select appropriate quality management systems are given. Information is obtained on the research areas through the use of the following methods: 1. Consultations with quality management practitioners and review of the Quality Management literature. 2. Questionnaires to architects, quantity surveyors, engineers, construction firm executives, contracts managers, site managers, trade foremen and skilled tradespersons, on quality management problems and procurement systems. 3. Case studies investigating approaches to site quality management in general and the adequacy of quality management documents. 4. Semi structured interviews investigating public building clients views on the quality management system and project procurement systems. The data collected are analysed using triangulation (qualitative and quantitative methodologies) methodology and the main results are reported below. The primary conclusion to be drawn is that the quality management system purported to be in use in the Botswana public building sector differs significantly from that recommended in the theory, resulting in poor quality buildings. This is primarily due to the use of an inappropriate building procurement system. In general the traditional building procurement system in the Botswana public building sector is used as a 'default system'. There are indications to suggest that it is used merely because the clients and consultants have failed to consider the issue of appropriateness. An appropriate quality management model for the construction phase is proposed with a proviso that the Botswana public building sector should establish appropriate methods of selecting appropriate procurement systems as a prerequisite in formulating appropriate quality management systems for various projects.
143

The development of a construction industry interest inventory.

Young, Darius Robert January 1968 (has links)
No description available.
144

To study in great depth the budgetary and cost control system of a firm in building services industry and to propose practicalalternatives to improve it

何佩玉, Ho, Pui-yuk, Josephine. January 1985 (has links)
published_or_final_version / Management Studies / Master / Master of Business Administration
145

The construction industry in Mexico : its characteristics and problems.

Maldonado López Lira, Gonzalo January 1976 (has links)
Thesis. 1976. M.S.--Massachusetts Institute of Technology. Dept. of Civil Engineering. / Microfiche copy available in Archives and Engineering. / Bibliography: leaves 205-210. / M.S.
146

Older construction workers : a study of related injuries, underlying causes and estimated costs /

Eppenberger, Marius. January 2008 (has links)
Thesis (MTech (Construction Management))--Cape Peninsula University of Technology, 2008. / Includes bibliographical references (leaves 126-134). Also available online.
147

Building contract claims a comparative study (Scotland, England and Malaysia) /

Ayus, Abdul Mohaimin Bin Noordin. January 1992 (has links)
Thesis (Ph.D.)--Aberdeen University, 1992. / Title from web page (viewed on Mar. 4, 2010). Includes bibliographical references.
148

Coordination problems in fast track commercial construction

White, Andrea Dickenson January 1980 (has links)
Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1980. / MICROFICHE COPY AVAILABLE IN ARCHIVES AND ENGINEERING. / Bibliography: leaf 84. / by Andrea Dickenson White. / M.S.
149

Quality management and rework in the construction industry

Rudolph, John 19 September 2009 (has links)
Rework is an insidious problem in the construction industry. According to the Construction Industry Institute (CII) Source Document 29, the cost of rework is 12.4% of the total project cost. However, these costs are just the tip of the iceberg, because they do not represent schedule delays, litigation cost, and other intangible costs of poor quality. Therefore, the complete cost of rework is estimated to be much greater than 12.4%. To effectively reduce the cost of rework, it is necessary to not only study the causes of rework, but also to study the effectiveness of activities designed to reduce rework. This research studied the relationships between rework activities and prevention and appraisal activities on four construction projects. This research addressed two questions: 1) What is the effect of prevention and appraisal activities on the reduction of rework, and 2) What is the effect of prevention activities occurring in the design phase on rework due to design errors in the construction phase? Based on the project data collect by the Quality Performance Management System (QPMS), this research concluded there was a slight relationship between increasing prevention and appraisal activities and the reduction of rework. There was a direct relationship between the increase of prevention activities in design and the reduction of rework due to design errors in the construction phase. The relationships were stronger for both questions at the project level than at the discipline level. At the project level, the aggregation of all the disciplines appears to negate the biases created within the specific disciplines. This research helps to provide real-world data to emphasize the importance of prevention activity in the design phase of a construction project. / Master of Science
150

An examination of the relationship between skills development and productivity in the construction industry

Abdel-Wahab, Mohamed Samir January 2008 (has links)
In recent years, the UK government skills policy has emphasised the role of workforce skills development as a key driver of economic success and improving productivity across all sectors of the economy. The importance of skills (as a vehicle for enhancing productivity performance) is highlighted within numerous government reports, such as Skills White Papers (2003 and 2005), in addition to the Leitch Review of Skills (2006) which coincided with the outset of this research. Thus, the aim of this research was to examine the relationship between skills development and productivity in the construction industry in order to assess the assumptions of government skills policy in the context of the sector. A multi-method approach was adopted in this research. This involved the analysis of: official construction statistics, levy/grant and financial accounts data of construction companies, in addition to a telephone survey. The main findings of the research are published in five peer reviewed academic papers, demonstrating the tenuous nature of the relationship between skills development and productivity performance, particularly when considering the heterogeneous nature of the construction industry. Government claims about the mono-causal relationship between skills and productivity should be treated with caution. A simple boost in qualification levels or participation rates of training is unlikely to lead to productivity improvements in the construction sector. However, skills development and training activities needs to be targeted and focused if the desired outcome of enhancing productivity performance is to be achieved. Construction companies needs to be proactive in addressing the skills and training needs of their business through drawing on the various support available through CITBConstructionSkills training grants or participating in appropriate skills/training initiatives, such as apprenticeship schemes. The provision of 'productivity-based' training grants should be considered by CITB-CS in order to prompt construction companies to consider training as a plausible means for enhancing their productivity performance. Finally, the recommendations presented in this thesis and areas for further research sets out the potential way forward in terms of advancing knowledge in this area.

Page generated in 0.1264 seconds